Calin Smith
- Listed as
- architect, engineer
- Firm
- Smith Engineering, Inc.
- Based in
- Berkeley
- On San Francisco permits
- Mar 2008 to Feb 2026
26 permits since 2000 (engineer on 21 permits, architect on 5 permits): 13 completed, 7 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 17, 2026 | In progress filed Feb 2026, not yet issued | 1329 45th Av | Johnstone - Mc Auliffe Const. Inc. | this application involves a vertical 1- story addition to an existing 2- story dwelling. addition comprises sleeping and bath rooms, a new stair, and storage. remodeled areas involves a new dining area, and powder roomDetails
this application involves a vertical 1- story addition to an existing 2- story dwelling. addition comprises sleeping and bath rooms, a new stair, and storage. remodeled areas involves a new dining area, and powder room | $210,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 4740 Balboa St | Bkr Services Inc Dba Bkr Construction Se | unit 201: revision to pa #202511048866. kitchen wall removalDetails
unit 201: revision to pa #202511048866. kitchen wall removal | $35,000 |
| Jan 22, 2026 | In progress issued Mar 2026 | 35 Russia Av | I E General Const Inc | revision to pa #2022-0923-3018 & 2025-0911-5095 (exterior wall 7 cmu infill at new adus london st). change from steel to cmu.Details
revision to pa #2022-0923-3018 & 2025-0911-5095 (exterior wall 7 cmu infill at new adus london st). change from steel to cmu. | $40,000 |
| Nov 6, 2025 | In progress issued Dec 2025 | 792 Bay St | A Plus Plumbing | strengthening of interior 2nd floor girder and supporting members ref adu pa 202006128503Details
strengthening of interior 2nd floor girder and supporting members ref adu pa 202006128503 | $5,000 |
| Jul 8, 2025 | In progress issued Jul 2025 | 947 Green St | Alpha Restoration & Wateproof | flue support removal at base of flue. currently not in use. abandoned trash chute.Details
flue support removal at base of flue. currently not in use. abandoned trash chute. | $50,000 |
| Aug 30, 2024 | In progress issued Jul 2025 | 947 Green St | Alpha Restoration & Wateproof | unit #3: repair and replacement of compromised structural members of existing rear wood deck of the 3rd floor unit of the ten story building. replacement of glass guardrail. no added square footage.Details
unit #3: repair and replacement of compromised structural members of existing rear wood deck of the 3rd floor unit of the ten story building. replacement of glass guardrail. no added square footage. | $10,000 |
| Feb 15, 2024 | Completed final sign-off Dec 2024 | 630 Fillmore St | Millsap Degnan & Associates | voluntary underpinning/shoring. east foundation prior to retaining wall replacement along east property line.Details
voluntary underpinning/shoring. east foundation prior to retaining wall replacement along east property line. | $15,000 |
| Aug 18, 2023 | Completed final sign-off Jan 2025 | 670 Monterey Bl | Mulhall Construction Inc. | soft -story retrofit of tier iii structure per 2022 sfebc ch.4d as amended by ab-107.Details
soft -story retrofit of tier iii structure per 2022 sfebc ch.4d as amended by ab-107. | $125,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 145 Laurel St | Block 12 Construction | phase v: apartment remodel. (4) kithen (2) bathrooms + misc.Details
phase v: apartment remodel. (4) kithen (2) bathrooms + misc. | $250,000 |
| Oct 27, 2021 | Completed final sign-off Apr 2024 | 1 Mallorca Wy | Block 12 Construction | to comply with nov#202182686. remodel (e) apt levels 1,2,3. new interior wood shear walls, new floor framing & foundation modification as req'd for remodel. replace (e) damaged roof at north garage. coord. work with soft story strengthening per previous permit 201905100348Details
to comply with nov#202182686. remodel (e) apt levels 1,2,3. new interior wood shear walls, new floor framing & foundation modification as req'd for remodel. replace (e) damaged roof at north garage. coord. work with soft story strengthening per previous permit 201905100348 | $900,000 |
| Oct 8, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | temporary shoring of (e) floor level 1. wood framing at (e) ground level garagesDetails
temporary shoring of (e) floor level 1. wood framing at (e) ground level garages | $49,000 |
| May 26, 2021 | In progress issued Jul 2025 | 1460 Golden Gate Av | Block 12 Construction | phase ii construction of 2 adu's per ordinance no. 162-16 for units c & d. reference permit no. 2019-0823-9650 r1 for phase i units a & b.Details
phase ii construction of 2 adu's per ordinance no. 162-16 for units c & d. reference permit no. 2019-0823-9650 r1 for phase i units a & b. | $120,000 |
| Nov 28, 2020 | Never finaled issued Mar 2022, no final | 2150 Fell St | Block 12 Construction | mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc @ target story, steel cant col & moment frame @ front, ply shearwalls @ int w/ conc ftgs, (h) ply & a.b.s. @ (e)a.b.s. @ (e) walls as required.Details
mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc @ target story, steel cant col & moment frame @ front, ply shearwalls @ int w/ conc ftgs, (h) ply & a.b.s. @ (e)a.b.s. @ (e) walls as required. | $100,000 |
| Nov 28, 2020 | In progress issued Jul 2024 | 2150 Fell St | Block 12 Construction | reconfiguration of rear of g/f parking/storage to a new adu, new conc ret wall & rear w/ conc star on grade to yard, no change @ sidewalk/curb. seismic strengthening under separate permit 202011289773.Details
reconfiguration of rear of g/f parking/storage to a new adu, new conc ret wall & rear w/ conc star on grade to yard, no change @ sidewalk/curb. seismic strengthening under separate permit 202011289773. | $50,000 |
| Nov 28, 2020 | Never finaled issued Mar 2022, no final | 2160 Fell St | Block 12 Construction | mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc@target story, steel cant cov & moment frame at front, ply shearwalls @ int w/ (n) canc fdns, (h) ply & a.b.s. @ (e)anchor bouts @ (e) walls as required.Details
mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc@target story, steel cant cov & moment frame at front, ply shearwalls @ int w/ (n) canc fdns, (h) ply & a.b.s. @ (e)anchor bouts @ (e) walls as required. | $100,000 |
| Aug 7, 2020 | Expired or cancelled expired Nov 2021 | 372 Dolores St | K J Woods Construction Inc | revision to app#201708296323 to soft story retrofit. adjust proposed shear wall locations and reconfigure 1st floor framing at rear of bldg to correct extg hazard construction.Details
revision to app#201708296323 to soft story retrofit. adjust proposed shear wall locations and reconfigure 1st floor framing at rear of bldg to correct extg hazard construction. | $5,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 145 Laurel St | Alpha Restoration & Wateproof | phase iii: voluntary masonry veneer repairingDetails
phase iii: voluntary masonry veneer repairing | $100,000 |
| Dec 7, 2018 | Completed final sign-off Jun 2019 | 1460 Golden Gate Av | Bai Construction | new garage slab & drainage. no increase in ceiling heights.Details
new garage slab & drainage. no increase in ceiling heights. | $25,000 |
| Sep 11, 2017 | Expired or cancelled cancelled Feb 2020 | 1297 18th St | commercial: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $65,000 | |
| Sep 11, 2017 | Expired or cancelled cancelled Feb 2020 | 1297 18th St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $65,000 | |
| Sep 11, 2017 | Expired or cancelled cancelled Dec 2022 | 2485 Folsom St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $85,000 | |
| Apr 8, 2016 | Completed final sign-off Jul 2017 | 2035 Filbert St | H C L Construction Inc. | seismic strengthening of soft story wood frame building per sf building code chapter 34 b using engineering criterioa presented in fema publication p807.Details
seismic strengthening of soft story wood frame building per sf building code chapter 34 b using engineering criterioa presented in fema publication p807. | $50,000 |
| Jan 20, 2016 | Completed final sign-off Sep 2019 | 3110 Clay St | Doherty Restoration, Inc. | new garage beam comply with 2013 cbc 3404.5. only at strenthened areas of the structure as shownDetails
new garage beam comply with 2013 cbc 3404.5. only at strenthened areas of the structure as shown | $15,000 |
| May 27, 2015 | Completed final sign-off Aug 2017 | 575 Pierce St | Saarman Construction,Ltd. | voluntary seismic strengthening of concrete and steel frames structure to correct vertical offset discontinuity and strengthing of front wall with new concrete shearwalls where feasible. n/a for maher ordinance extended.Details
voluntary seismic strengthening of concrete and steel frames structure to correct vertical offset discontinuity and strengthing of front wall with new concrete shearwalls where feasible. n/a for maher ordinance extended. | $110,000 |
| Mar 4, 2015 | Completed final sign-off Dec 2015 | 1803 Broadway | Doherty Restoration, Inc. | mandatory seismic strengthening ground level per sfbc soft story program. frames, wood shear walls.Details
mandatory seismic strengthening ground level per sfbc soft story program. frames, wood shear walls. | $90,000 |
| Mar 18, 2008 | Completed final sign-off Nov 2008 | 661 Divisadero St | new skylights (dome),handicap upgrades to include bathroom, entry, new storage room, handrail at stair on 1st floor. new windows, new lights, new shear wall on 2nd floor. remove front bars & gate.Details
new skylights (dome),handicap upgrades to include bathroom, entry, new storage room, handrail at stair on 1st floor. new windows, new lights, new shear wall on 2nd floor. remove front bars & gate. | $94,500 |