22 permits since 2000 (engineer on 22 permits): 18 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2026 | In progress issued Jul 2026 | 255 Turk St | Golden Vector Stars Corporation | mechanical revision to pa# 202405172411: remove 10' (e) dryer exhaust duct. install (n) dryer booster fan, duct, control, mounting, connect to existing electrical. replace (e) transome glazing with louvers. change outlet louver.Details
mechanical revision to pa# 202405172411: remove 10' (e) dryer exhaust duct. install (n) dryer booster fan, duct, control, mounting, connect to existing electrical. replace (e) transome glazing with louvers. change outlet louver. | |
| Jul 17, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348Details
second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348 | |
| Jun 4, 2025 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilatorDetails
revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator | $196,400 |
| Apr 30, 2025 | In progress issued Oct 2025 | 835 Turk St | D & H Construction | ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Details
ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. | $16,000,000 |
| Jun 25, 2024 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | 100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.Details
100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures. | $2,500,000 |
| Feb 16, 2024 | In progress issued May 2024 | 615 Grant Av | J M Construction Llc | revision to pa# 202306291237, revise restroom layout. all work on 3rd and 4th floor.Details
revision to pa# 202306291237, revise restroom layout. all work on 3rd and 4th floor. | $15,000 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422Details
owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 | $170,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.Details
add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. | $129,500 |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 1003 Powell St | Amone Corp | t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240Details
t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240 | $18,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows...Details
mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows... | $700,000 |
| Aug 15, 2022 | Completed final sign-off Dec 2022 | 615 Grant Av | Amone Corp | office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided.Details
office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided. | $178,000 |
| Jun 22, 2022 | Completed final sign-off May 2023 | 1005 Powell St | Bright Power Inc Dba Bright Coastal | replace (e) central hydronic heating system with unized split vrf systems.Details
replace (e) central hydronic heating system with unized split vrf systems. | $270,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalkDetails
to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk | $150,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windowsDetails
r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows | $1,500,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permitDetails
planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit | $400,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 3138 Kamille Ct | Nibbi Bros Assoc Inc. | mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposedDetails
mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposed | $375,000 |
| Feb 24, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | Nibbi Bros Assoc Inc. | add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030.Details
add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030. | $50,000 |
| Dec 28, 2020 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709Details
construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709 | $68,000,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2023 | 1204 Mason St | Bbi - Con Inc | 100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use.Details
100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use. | $7,600,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use.Details
rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use. | $6,100,000 |