Brian Reno
- Listed as
- architect
- Firm
- Stantec Architecture Inc.
- On San Francisco permits
- Mar 2017 to Sep 2022
12 permits since 2000 (architect on 12 permits): 7 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2022 | Never finaled issued Oct 2022, no final | 300 Montgomery St | Skyline Construction | 12th fl interior ti consist of new finishes and fixtures. new wall, includes upgrades on electrical and mechanicalDetails
12th fl interior ti consist of new finishes and fixtures. new wall, includes upgrades on electrical and mechanical | $820,000 |
| Apr 29, 2021 | Completed final sign-off Nov 2024 | 4669 Mission St | Frans Construction Inc. | to comply w/abe202010022970 to provide an accessible entrance to the existing chase bank branch. work to include replacement of sidewalk and installation of automatic door openers.Details
to comply w/abe202010022970 to provide an accessible entrance to the existing chase bank branch. work to include replacement of sidewalk and installation of automatic door openers. | $75,000 |
| Feb 23, 2021 | Never finaled issued Apr 2021, no final | 1750 Fulton St | I E C Electrical Contractors Inc | inside existing lucky store: area of work 690 sq ft. decommission (remove) well fargo in store bank. remove existing interior walls and finishes and partial ceiling area. relocate existing electrical panel and some lighting. soft demo.Details
inside existing lucky store: area of work 690 sq ft. decommission (remove) well fargo in store bank. remove existing interior walls and finishes and partial ceiling area. relocate existing electrical panel and some lighting. soft demo. | $50,000 |
| Aug 30, 2018 | Completed final sign-off Sep 2018 | 926 Taraval St | Frans Construction Inc. | revision to app#201802080811. eliminating ada counter work from previously aproved permitDetails
revision to app#201802080811. eliminating ada counter work from previously aproved permit | |
| Jul 24, 2018 | Never finaled issued Sep 2018, no final | 555 Mission St | S C S Construction | structural work for weight of new micro-atm. extg electrical work was permited. maher naDetails
structural work for weight of new micro-atm. extg electrical work was permited. maher na | $17,380 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 5411 03rd St | Ybj Construction Services | recent interior fire damaged portion of the restaurant playplace. 50% of the joists and roof deck are to be replaced. 1 glulam beam to be replaced. ref 201703091060. no change of scope to original permit.Details
recent interior fire damaged portion of the restaurant playplace. 50% of the joists and roof deck are to be replaced. 1 glulam beam to be replaced. ref 201703091060. no change of scope to original permit. | $50,000 |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 926 Taraval St | Frans Construction Inc. | new inclined walkway with handrails, new door closers, new isa sign new isa sign at accessible counter, relocating pass thru and new br glass at accessible counterDetails
new inclined walkway with handrails, new door closers, new isa sign new isa sign at accessible counter, relocating pass thru and new br glass at accessible counter | $12,000 |
| Sep 6, 2017 | Never finaled issued Dec 2017, no final | 5454 Mission St | revision to permit #201703091064 to include (n) cash window, revision to parapet, and ada site revision.Details
revision to permit #201703091064 to include (n) cash window, revision to parapet, and ada site revision. | $30,000 | |
| Mar 13, 2017 | Completed final sign-off Aug 2018 | 1100 Fillmore St | Ybj Construction Services | new exterior facade upgrade, new refresh to dioning area & ceiling ada barrier removal within the bld footprint & siteDetails
new exterior facade upgrade, new refresh to dioning area & ceiling ada barrier removal within the bld footprint & site | $175,000 |
| Mar 9, 2017 | Completed final sign-off Jan 2019 | 5454 Mission St | Ybj Construction Services | new exterior facade upgrade. new refresh to dining area & ceiling ada barrier removal within the bld footprint & siteDetails
new exterior facade upgrade. new refresh to dining area & ceiling ada barrier removal within the bld footprint & site | $175,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2019 | 5411 03rd St | Ybj Construction Services | (n) exteropr facade upgrade. (n) refresh to dining area & ceiling, ada barrier removal within the building footprint & site. n/a ordinance #155-13Details
(n) exteropr facade upgrade. (n) refresh to dining area & ceiling, ada barrier removal within the building footprint & site. n/a ordinance #155-13 | $175,000 |
| Mar 3, 2017 | Completed final sign-off Apr 2019 | 345 Bay Shore Bl | Ybj Construction Services | new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher naDetails
new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher na | $375,000 |