Blake Dilsworth
- Listed as
- engineer
- Firm
- Kpff Consulting Engineers
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Sep 2024
21 permits since 2000 (engineer on 21 permits): 14 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2024 | Completed final sign-off May 2026 | 580 Beach St | Rdl Construction, Inc. | building 1 and 2 (west) building. selective store front replacment , art displays, lighting, cosmetic repairs, railing repairs and upgrade. sharing plans with 500 beach stDetails
building 1 and 2 (west) building. selective store front replacment , art displays, lighting, cosmetic repairs, railing repairs and upgrade. sharing plans with 500 beach st | $1,700,000 |
| Sep 20, 2024 | Completed final sign-off May 2026 | 500 Beach St | Rdl Construction, Inc. | garage (east) building. selective store front replacment , art displays, lighting, cosmetic repairs. sharing plans with 580 beach stDetails
garage (east) building. selective store front replacment , art displays, lighting, cosmetic repairs. sharing plans with 580 beach st | $1,700,000 |
| Nov 7, 2022 | In progress issued Sep 2024 | 2270 Mckinnon Av | Plant Construction Co, Lp | to erect a 5-story, type iiib & ia building. occupancy class b, s-1, f-1, s-2.Details
to erect a 5-story, type iiib & ia building. occupancy class b, s-1, f-1, s-2. | $20,000,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | 4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittalsDetails
4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittals | $2,000,000 |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 1012 Scott St | (n) bathroom @ l1, (e) remodel of bedroom and l1 and (n) partial stair extention interior.Details
(n) bathroom @ l1, (e) remodel of bedroom and l1 and (n) partial stair extention interior. | $60,000 | |
| Jan 24, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.Details
3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales. | $5,000,000 |
| Apr 8, 2021 | Never finaled issued Jan 2022, no final | 120 Stockton St | Plant Construction Co, Lp | addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str).Details
addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str). | $50,000 |
| Aug 13, 2020 | Never finaled issued Feb 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) revised dead and live loading at levels 2-5.Details
revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) revised dead and live loading at levels 2-5. | $250,000 |
| Dec 28, 2015 | Completed final sign-off Oct 2017 | 345 Spear St | Bcci Construction Company | 5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/aDetails
5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/a | $795,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | 7th floor: structural work associated with arch permit #201511031519. work includes nelson stud welding. also new floating slab for acoustic purpose only (not structural). n/a for maher.Details
7th floor: structural work associated with arch permit #201511031519. work includes nelson stud welding. also new floating slab for acoustic purpose only (not structural). n/a for maher. | $225,000 |
| Oct 7, 2015 | Completed final sign-off Sep 2016 | 4 Embarcadero Center | Gci, Inc | renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13Details
renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13 | $52,200 |
| Jun 24, 2015 | Never finaled issued Nov 2015, no final | 625 Market St | G Swanson Constr. Inc., Evans & Son Inc | remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate-Details
remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate- | $1,200,000 |
| Apr 23, 2015 | Completed final sign-off Dec 2016 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | revision to pa#201011084497 s2 to modify super structure design due to infield conditions. design evalution changes include modification to brace line, slabs for fuel tanks and mechanical equipment, elevator & escalator openings. n/a ordinance #155-13Details
revision to pa#201011084497 s2 to modify super structure design due to infield conditions. design evalution changes include modification to brace line, slabs for fuel tanks and mechanical equipment, elevator & escalator openings. n/a ordinance #155-13 | |
| Dec 17, 2014 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.Details
level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal. | $200,000 |
| Feb 12, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | Plant Construction Company Lp | convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.Details
convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab. | $210,000 |
| Dec 13, 2012 | Completed final sign-off Mar 2016 | 33 Powell St | The Hatch Group Inc | scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13Details
scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13 | $1,070,000 |
| Apr 17, 2012 | Completed final sign-off Oct 2012 | 400 Post St | Lorentz Bruun Co., Inc. | rev to pa# 2011/11/01/8054. 3539 sqft interior t.i for a retail banking center, this project was previously approved/permited, but client asked gensler to redesign. project includes 24 hr atm vestiblue, sliding glass nanwall system, lobby, hospitality area for customers, teller line, offices,Details
rev to pa# 2011/11/01/8054. 3539 sqft interior t.i for a retail banking center, this project was previously approved/permited, but client asked gensler to redesign. project includes 24 hr atm vestiblue, sliding glass nanwall system, lobby, hospitality area for customers, teller line, offices, | |
| Oct 21, 2011 | Never finaled issued Mar 2012, no final | 400 Post St | Lorentz Bruun Co., Inc. | building alteration - minor: replacement of storefront system, entrances & bulkhead, addition of canopy at corner of building. replace a portion of existing sidewalk in r.o.w. to meet accessibility codes.Details
building alteration - minor: replacement of storefront system, entrances & bulkhead, addition of canopy at corner of building. replace a portion of existing sidewalk in r.o.w. to meet accessibility codes. | $400,000 |
| Aug 24, 2011 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | new starbucks t-i build out inside an existing shell building.construction of cafe front bar & back. construction of new partition walls & overhead soffit. relocation of 2 (e) doors. painting. installation of new flooring,new wall covering finishes.new furniture & casework. installation of new floorDetails
new starbucks t-i build out inside an existing shell building.construction of cafe front bar & back. construction of new partition walls & overhead soffit. relocation of 2 (e) doors. painting. installation of new flooring,new wall covering finishes.new furniture & casework. installation of new floor | $300,000 | |
| Mar 5, 2007 | Completed final sign-off Oct 2007 | 67 Turk St | strucutral upgrade to existing parking lot, provide 3 handicap parking stalls 1 handicap van stall. modify handrails.Details
strucutral upgrade to existing parking lot, provide 3 handicap parking stalls 1 handicap van stall. modify handrails. | $60,000 | |
| Oct 11, 2005 | Completed final sign-off Jul 2006 | 345 California St | Gci, Inc | demolition of 33rd/fl. conference room space and construction of convenience/non egress stair connecting to 32nd/fl.Details
demolition of 33rd/fl. conference room space and construction of convenience/non egress stair connecting to 32nd/fl. | $200,000 |