Angelo Obertello
- Listed as
- architect, engineer
- Firm
- Carlson, Barbee& Gibson, Inc
- Based in
- San Ramon
- On San Francisco permits
- Dec 2018 to Jul 2026
15 permits since 2000 (engineer on 10 permits, architect on 5 permits): 7 completed, 2 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: block 9- prequel park- potrero power station development agreement- exterior work, landscape and architectural work to support temporary park use including (n) pathways, play equipment, railings, paving, planting areas and lighting (deferred).Details
mayor dir ed13-01: block 9- prequel park- potrero power station development agreement- exterior work, landscape and architectural work to support temporary park use including (n) pathways, play equipment, railings, paving, planting areas and lighting (deferred). | $4,000,000 | |
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.Details
mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab. | $1,500,000 | |
| Apr 3, 2023 | Never finaled issued Jun 2023, no final | 420 23rd St | De Silva Gates Construction Llc | mayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511.Details
mayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511. | |
| Oct 28, 2022 | Never finaled issued Apr 2023, no final | 420 23rd St | mayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...Details
mayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &... | ||
| Oct 28, 2022 | Never finaled issued Apr 2023, no final | 1201 Illinois St | De Silva Gates Construction | mayor ed 13-01/17-02. rev. to pa# 202006198947, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...Details
mayor ed 13-01/17-02. rev. to pa# 202006198947, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &... | |
| May 19, 2022 | Never finaled filed May 2022, never issued | 151 Humboldt St | mayor dir 17-02 priority project: erect a 13-story over 2-basement, type 1a, residential/mixed use building, with 342 residential units, parking, retail, assembly, child care, office, bwtp. (block 8)Details
mayor dir 17-02 priority project: erect a 13-story over 2-basement, type 1a, residential/mixed use building, with 342 residential units, parking, retail, assembly, child care, office, bwtp. (block 8) | $175,000,000 | |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 420 23rd St | rough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented.Details
rough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented. | $816,325 | |
| Jul 22, 2020 | Completed final sign-off May 2022 | 1201 Illinois St | De Silva Gates Construction | bldg# 4-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas meter shop on the dwgs)Details
bldg# 4-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas meter shop on the dwgs) | $16,500 |
| Jul 22, 2020 | Expired or cancelled expired Apr 2022 | 1201 Illinois St | De Silva Gates Construction | bldg# 1-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as fire pump house on the dwgs)Details
bldg# 1-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as fire pump house on the dwgs) | $19,250 |
| Jul 22, 2020 | Completed final sign-off Feb 2022 | 1201 Illinois St | De Silva Gates Construction | bldg# 3-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as carpenter building on the dwgs)Details
bldg# 3-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as carpenter building on the dwgs) | $27,500 |
| Jul 22, 2020 | Completed final sign-off May 2022 | 1201 Illinois St | De Silva Gates Construction | bldg# 5-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas compressor bldg on the dwgs)Details
bldg# 5-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas compressor bldg on the dwgs) | $82,500 |
| Jun 19, 2020 | Completed final sign-off Nov 2025 | 1201 Illinois St | De Silva Gates Construction | rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4175/017 & 4175/002 also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.*Details
rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4175/017 & 4175/002 also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.* | $8,798,092 |
| May 27, 2020 | Completed final sign-off Nov 2025 | 420 23rd St | De Silva Gates Construction | rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.Details
rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented. | $11,357,014 |
| Dec 7, 2018 | Completed final sign-off Nov 2023 | 301 Mission St | Shimmick Construction Co. Inc. | **paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402Details
**paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402 | $4,800,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2025 | 301 Mission St | Shimmick Construction Co. Inc. | parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity.Details
parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. | $30,000,000 |