Angelito Perez
- Listed as
- architect, engineer
- Firm
- Logar Designs Inc
- Based in
- Newman
- On San Francisco permits
- Apr 2021 to Jul 2026
23 permits since 2000 (engineer on 21 permits, architect on 2 permits): 7 completed, 13 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2026 | Expired or cancelled cancelled Aug 2026 | 315 Capistrano Av | A C Bonifacio Const Co | convert of (e) garage into adu (634sf). extension/addition at back of rear of strutcure (166sf)Details
convert of (e) garage into adu (634sf). extension/addition at back of rear of strutcure (166sf) | $159,000 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 2336 Quintara St | Axiom Renovation Inc | convert portion of (e) garage into habbitable space on 1st floor. new living space connected to main living area on 2nd floor, new bedroom, living room, half and full bath, laundry space replacing and increasing size of rear window and door.Details
convert portion of (e) garage into habbitable space on 1st floor. new living space connected to main living area on 2nd floor, new bedroom, living room, half and full bath, laundry space replacing and increasing size of rear window and door. | $62,000 |
| May 12, 2026 | In progress filed May 2026, not yet issued | 34 Houston St | Firm Construction Company | interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors.Details
interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors. | $125,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 213 06th Av | Reliable Construction Inc | revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stairDetails
revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stair | $3,000 |
| Mar 18, 2026 | In progress issued Jun 2026 | 332 Hill St | Reliable Construction Inc | revision to pa 202511109295 to add additional structural strengthening; add floor to the existing loft/mezzanine area above (e) master bedroom; interior remove (e) sprial stairs and install new stair to the mezzanine; add new skylight above the mezzanineDetails
revision to pa 202511109295 to add additional structural strengthening; add floor to the existing loft/mezzanine area above (e) master bedroom; interior remove (e) sprial stairs and install new stair to the mezzanine; add new skylight above the mezzanine | $30,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 1350 Ortega St | Reliable Construction Inc | convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hallDetails
convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hall | $80,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 474 02nd Av | Be Home Remodeling Inc | removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing.Details
removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing. | $30,000 |
| Jan 22, 2026 | Completed final sign-off Sep 2026 | 275 Christopher Dr | Reliable Construction Inc | convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade.Details
convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade. | $68,000 |
| Dec 11, 2025 | In progress issued Dec 2025 | 1477 09th Av | comply with board of appeals decision: 24-060 built in planter is 3 ft wide and 18 in high that runs the length of the deck from the house to approx within 38 in of the stairs. guard rail with min height of 42 in that is made either a tempered or laminate safety glass or b. with a metal frame andDetails
comply with board of appeals decision: 24-060 built in planter is 3 ft wide and 18 in high that runs the length of the deck from the house to approx within 38 in of the stairs. guard rail with min height of 42 in that is made either a tempered or laminate safety glass or b. with a metal frame and | $15,000 | |
| Dec 5, 2025 | In progress issued Dec 2025 | 481 Noe St | Be Home Remodeling Inc | reconstruction of exterior stairs like for like for like at rearDetails
reconstruction of exterior stairs like for like for like at rear | $20,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1307 Francisco St | Be Home Remodeling Inc | master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel.Details
master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel. | $85,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 332 Hill St | Reliable Construction Inc | new window installation in exterior east wall and structural strengthening.Details
new window installation in exterior east wall and structural strengthening. | $28,000 |
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 2067 20th Av | Zm Builders Inc | 2/f: kitchen and bathroom remodel. add (1) master bath, and (1) study room. relocate staircase. 1/f: add (2) beds, (2) baths, (1) media room with wetbar, and (1) laundry room (930 sq.ft) infill lightwell, replace all (e) windows in kind. replace water heater and furnace.Details
2/f: kitchen and bathroom remodel. add (1) master bath, and (1) study room. relocate staircase. 1/f: add (2) beds, (2) baths, (1) media room with wetbar, and (1) laundry room (930 sq.ft) infill lightwell, replace all (e) windows in kind. replace water heater and furnace. | $262,630 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2053 Golden Gate Av | Be Home Remodeling Inc | kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring.Details
kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring. | $150,000 |
| Jul 2, 2025 | Completed final sign-off Sep 2025 | 2538 Bryant St | Be Home Remodeling Inc | bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall.Details
bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall. | $22,000 |
| Jun 25, 2025 | In progress filed Jun 2025, not yet issued | 236 Silliman St | Regency Construction & Remodeling | rear addtion 203 sqft (sunroom & remodel), new bedroom & bathroom in the back, side addition 174 sqft (new bedroom, bathroom & wic) new carport 174 sqft.Details
rear addtion 203 sqft (sunroom & remodel), new bedroom & bathroom in the back, side addition 174 sqft (new bedroom, bathroom & wic) new carport 174 sqft. | $160,000 |
| May 22, 2025 | In progress filed May 2025, not yet issued | 2828 Folsom St | new bathroom of 49.92 sq ft in existing storage room at basement levelDetails
new bathroom of 49.92 sq ft in existing storage room at basement level | $50,000 | |
| Mar 31, 2025 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes.Details
revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes. | |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 4630 19th St | Gadi Construction Inc | revision to pa #2024-0329-8899 structural detail and calculation to be changedDetails
revision to pa #2024-0329-8899 structural detail and calculation to be changed | |
| Sep 25, 2024 | In progress issued Oct 2024 | 1477 09th Av | to comply with nov 202314238: 168 sf room addition @ rear, legalize rear fence replacement; convert (e) bedroom on 1st floor to officeDetails
to comply with nov 202314238: 168 sf room addition @ rear, legalize rear fence replacement; convert (e) bedroom on 1st floor to office | $60,000 | |
| Sep 6, 2024 | In progress issued Sep 2024 | 2238 46th Av | Bayside Builders Group Inc | rip and replace front stairs to entry. replace conc. treads in kind no structural work.Details
rip and replace front stairs to entry. replace conc. treads in kind no structural work. | $20,000 |
| Feb 17, 2023 | Never finaled issued Feb 2023, no final | 5650 Geary Bl | Pineda Construction Inc | install new door opener, abe# 201812132954Details
install new door opener, abe# 201812132954 | $3,500 |
| Apr 2, 2021 | Never finaled issued Jan 2023, no final | 69 Potomac St | Expert Home Builders Inc | repairing stairs like for like ; and repair rear deck 7.13 sqft.total up to 50%.Details
repairing stairs like for like ; and repair rear deck 7.13 sqft.total up to 50%. | $15,000 |