Be Home Remodeling Inc
- Based in
- San Jose
- On San Francisco permits
- Jan 2020 to Sep 2026
- Last 24 months
- 75 permits filed
78 permits since 2000: 55 completed, 22 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 637 Mississippi St | update front door.Details
update front door. | $6,800 |
| Aug 18, 2026 | In progress issued Aug 2026 | 474 02nd Av | revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count.Details
revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count. | $5 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1979 28th Av | master bathroom remodel - relocating toilet, tub - walk-in shower; guest bathroom remodel, like for likeDetails
master bathroom remodel - relocating toilet, tub - walk-in shower; guest bathroom remodel, like for like | $50,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 2146 Great Hy | kitchen remodel: replace cabinets, appliances, kitchen sink, dishwasher, all in same location, like for like remodel. no removal of wallsDetails
kitchen remodel: replace cabinets, appliances, kitchen sink, dishwasher, all in same location, like for like remodel. no removal of walls | $30,000 |
| Jul 31, 2026 | In progress issued Jul 2026 | 136 Seal Rock Dr | kitchen remodel (in kind) and remove (e) window in kitchen, new window (4030) in kitchen.Details
kitchen remodel (in kind) and remove (e) window in kitchen, new window (4030) in kitchen. | $37,000 |
| Jul 17, 2026 | Completed final sign-off Sep 2026 | 2311 Scott St | unit#4: bathroom remodel-like for like. no structural changes. replace fan, tub, toilet and vanity. upgarde mep to code ad needed.Details
unit#4: bathroom remodel-like for like. no structural changes. replace fan, tub, toilet and vanity. upgarde mep to code ad needed. | $20,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 3300 Folsom St | kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan..Details
kitchen and (2) bathroom remodel (guest + master). replace kitchen sink + plumbing fixtures upgrade appliances and lights all in the same location, no change to plumbing or electrical layouts. no structural changes. no structural changes to bathroom(s) layout, replace toielt, vanity, tubs and fan.. | $15,000 |
| Jul 1, 2026 | Completed final sign-off Aug 2026 | 1081 Goettingen St | kitchenette to be added to ground floor living area, microwave with fan, two gfci receptacles, electric cooktop, sink and fridge.Details
kitchenette to be added to ground floor living area, microwave with fan, two gfci receptacles, electric cooktop, sink and fridge. | $15,000 |
| Jun 17, 2026 | Completed final sign-off Aug 2026 | 318 Ortega St | second floor bathroom remodel like for like.Details
second floor bathroom remodel like for like. | $25,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 770 Duncan St | kitchen remodel, like for like no structual changes. replace kitchen sink, dishwasher, range vent, upgrade mep to code. 200sfDetails
kitchen remodel, like for like no structual changes. replace kitchen sink, dishwasher, range vent, upgrade mep to code. 200sf | $25,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 1128 Pine St | reconstruction of roof deck. n.o.v. #202652226Details
reconstruction of roof deck. n.o.v. #202652226 | $40,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 4042 17th St | revision to permit 202605040598. adding 21" corner vanity. replacing sliding door to pocket door (no change to size)Details
revision to permit 202605040598. adding 21" corner vanity. replacing sliding door to pocket door (no change to size) | $15,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 4040 17th St | revision to permit 202605040601. adding 16" vanity. replacing sliding door to pocket door (no change to size)Details
revision to permit 202605040601. adding 16" vanity. replacing sliding door to pocket door (no change to size) | $15,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1924 Filbert St | unit 2: bathroom remodel like for like, tub to tub, replace toilet, vanity sink, fixtures, tub, upgrade meps, no structual changes.Details
unit 2: bathroom remodel like for like, tub to tub, replace toilet, vanity sink, fixtures, tub, upgrade meps, no structual changes. | $25,000 |
| May 14, 2026 | In progress issued May 2026 | 2548 14th Av | guest bathroom remodel like for like & kitchen remodel like for like.Details
guest bathroom remodel like for like & kitchen remodel like for like. | $62,700 |
| May 14, 2026 | In progress issued May 2026 | 7 Juanita Wy | 3 bathroom remodels and 1 is tub to shower. 2 master bathrooms 60 sq ft and 40 sq ft. 1 guest bathroom 40 sq ft. upgrade meps as needed, replace toilets, vanity, sinks, fans, fixtures, in bathroom.Details
3 bathroom remodels and 1 is tub to shower. 2 master bathrooms 60 sq ft and 40 sq ft. 1 guest bathroom 40 sq ft. upgrade meps as needed, replace toilets, vanity, sinks, fans, fixtures, in bathroom. | $60,000 |
| May 8, 2026 | Completed final sign-off Sep 2026 | 226 Clinton Pk | like for like replacement of e) deck, wood board and stais on the 1st/f. no work on 2nd/fDetails
like for like replacement of e) deck, wood board and stais on the 1st/f. no work on 2nd/f | $8,000 |
| May 8, 2026 | In progress issued May 2026 | 1601 Pacific Av | bathroom remodel: like for like, curbless shower. replace vanity sink, toilet, fixtures, upgrade fan all in same location upgrade mep to code as needed.Details
bathroom remodel: like for like, curbless shower. replace vanity sink, toilet, fixtures, upgrade fan all in same location upgrade mep to code as needed. | $20,000 |
| May 5, 2026 | Completed final sign-off Jun 2026 | 1715 Sanchez St | guest bathroom remodel like for like, no relocations or structural changes.Details
guest bathroom remodel like for like, no relocations or structural changes. | $20,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 4040 17th St | bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kindDetails
bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kind | $15,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 4042 17th St | bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kindDetails
bathroom remodel removing stand alone bath and creating walk in shower and adding toilet. water closet to include replace toilet in kind | $15,000 |
| May 1, 2026 | In progress issued Jun 2026 | 474 02nd Av | kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroomDetails
kitchen remodel, 3rd floor bathroom remodel, add laundry room, convert 4th floor room to bathroom | $60,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 200 Brannan St | like for like remodel of 2 (e) bathrooms. one with bathtub/shower, one with walk-in shower. replace fixtures, finishes and plumbing - same location- no change to structure or layout. all stays in same location.Details
like for like remodel of 2 (e) bathrooms. one with bathtub/shower, one with walk-in shower. replace fixtures, finishes and plumbing - same location- no change to structure or layout. all stays in same location. | $40,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 2342 48th Av | kitchen remodel - like for like. replace cabinets, fixtures in same location.Details
kitchen remodel - like for like. replace cabinets, fixtures in same location. | $30,000 |
| Apr 2, 2026 | Expired or cancelled cancelled Apr 2026 | 2362 48th Av | kitchen remodel: like for like, replace cabinets, fixtures in same location.Details
kitchen remodel: like for like, replace cabinets, fixtures in same location. | $30,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 1601 Pacific Av | unit 404: kitchen remodel like for like, replace cabinets, counter tops, sink. same location.Details
unit 404: kitchen remodel like for like, replace cabinets, counter tops, sink. same location. | $30,000 |
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 938 Market St | unit#403: kitchen remodel - like for like, upgrade mep to codeDetails
unit#403: kitchen remodel - like for like, upgrade mep to code | $25,000 |
| Mar 20, 2026 | Completed final sign-off May 2026 | 324 Arkansas St | bathroom remodel like for like ¿ shower to shower on first floor, upgrade mep to code, replace toilet, sink & vanity.Details
bathroom remodel like for like ¿ shower to shower on first floor, upgrade mep to code, replace toilet, sink & vanity. | $25,000 |
| Mar 20, 2026 | In progress issued Mar 2026 | 142 Clearfield Dr | first floor bathroom remodel like for like, relocate fan from wall to ceiling, upgrade mep to code. no removal of wallsDetails
first floor bathroom remodel like for like, relocate fan from wall to ceiling, upgrade mep to code. no removal of walls | $25,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 30 Constanso Wy | kitchen remodel: remove wall between kitchen area and dining room area. kitchen island remdeling, gas stove, update electrical and subpnael. replace sink in kitchenDetails
kitchen remodel: remove wall between kitchen area and dining room area. kitchen island remdeling, gas stove, update electrical and subpnael. replace sink in kitchen | $18,000 |
| Mar 3, 2026 | Completed final sign-off May 2026 | 3137 Washington St | 1)remove wall that seperates the kitchen from living room. 2)kitchen remodel. 3)remove closet in bedroom.Details
1)remove wall that seperates the kitchen from living room. 2)kitchen remodel. 3)remove closet in bedroom. | $30,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 1944 15th Av | creation of 2 (n) bathrooms. remodel (e) bathroom. creation of ground floor bedroom/office area. conventional framing changes.Details
creation of 2 (n) bathrooms. remodel (e) bathroom. creation of ground floor bedroom/office area. conventional framing changes. | $90,000 |
| Feb 26, 2026 | Completed final sign-off May 2026 | 451 Kansas St | unit # 316: guest bathroom remodel, like for like, replace tub, sink, vanity, toilet, fan upgrade mep to code.Details
unit # 316: guest bathroom remodel, like for like, replace tub, sink, vanity, toilet, fan upgrade mep to code. | $12,000 |
| Feb 19, 2026 | Completed final sign-off Feb 2026 | 1430 Hyde St | to obtain final inspection for work approved under 202501037699. all work is completeDetails
to obtain final inspection for work approved under 202501037699. all work is complete | |
| Feb 19, 2026 | In progress issued Feb 2026 | 200 Brannan St | bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208Details
bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208 | $50,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 1475 33rd Av | master bathroom remodel. like for like replace shower, toilet, vanity, sink, fan upgrade mep to code. 48 sqftDetails
master bathroom remodel. like for like replace shower, toilet, vanity, sink, fan upgrade mep to code. 48 sqft | $25,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 1587 Sanchez St | guest bathroom remodel like for like no structural changes replace tub, sink, vanity, toilet, fan upgrade mep to code 50 sq ft.Details
guest bathroom remodel like for like no structural changes replace tub, sink, vanity, toilet, fan upgrade mep to code 50 sq ft. | $30,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 623 Noriega St | bathroom remodel upstaires convert tub to shower, replace toilet, sink, vanity, fan, upgrade mep to code, 42 sq ft. bathroom remodel downstaires like for like, replace shower,toilet, sink, vanity, fan, upgrade mep to code, 37 sq ft.Details
bathroom remodel upstaires convert tub to shower, replace toilet, sink, vanity, fan, upgrade mep to code, 42 sq ft. bathroom remodel downstaires like for like, replace shower,toilet, sink, vanity, fan, upgrade mep to code, 37 sq ft. | $30,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 474 02nd Av | removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing.Details
removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing. | $30,000 |
| Dec 29, 2025 | Completed final sign-off Feb 2026 | 1834 38th Av | bathroom remodel like for like - remove walk in shower and convert to closet.Details
bathroom remodel like for like - remove walk in shower and convert to closet. | $15,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 490 34th Av | unit #202: master bathroom remodel shower like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. guest bathroom remodel tub like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft.Details
unit #202: master bathroom remodel shower like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. guest bathroom remodel tub like for like replace toilet, sink, vanity, fan, upgrade mep to code. 50 sq ft. | $30,000 |
| Dec 17, 2025 | Completed final sign-off Jan 2026 | 144 27th St | bathroom remodel tub to shower. replace toilet, vanity, sink, fan upgrade in kind. mep to code. 40 sq ft.Details
bathroom remodel tub to shower. replace toilet, vanity, sink, fan upgrade in kind. mep to code. 40 sq ft. | $20,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 620 Lake St | unit#4: bathroom remodel tub to shower replace toilet, sink, vanity, fan, upgrade mep to code.not walls to be remove or add.Details
unit#4: bathroom remodel tub to shower replace toilet, sink, vanity, fan, upgrade mep to code.not walls to be remove or add. | $20,000 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 2091 32nd Av | siding replacement from wood to james hardie 400 sq ft. back side non street visible.Details
siding replacement from wood to james hardie 400 sq ft. back side non street visible. | $12,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 481 Noe St | reconstruction of exterior stairs like for like for like at rearDetails
reconstruction of exterior stairs like for like for like at rear | $20,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 949 Hampshire St | 2nd floor remodeling. adding of interior staircase between 1st and 2nd floor.Details
2nd floor remodeling. adding of interior staircase between 1st and 2nd floor. | $25,000 |
| Nov 21, 2025 | Completed final sign-off Dec 2025 | 2087 23rd Av | tub to tub remodel like for like. replace (e) fan to new (not a full bathroom remodel).Details
tub to tub remodel like for like. replace (e) fan to new (not a full bathroom remodel). | $7,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1307 Francisco St | master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel.Details
master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel. | $85,000 |
| Nov 14, 2025 | Completed final sign-off Dec 2025 | 735 Madrid St | revision 202511079144 add to replace stucco section in front of the house apppx 10 by 10Details
revision 202511079144 add to replace stucco section in front of the house apppx 10 by 10 | $5,000 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 735 Madrid St | replace full siding on the back and sides of the house like for like james hardie not visible from street. replacement of plywood in-kind.Details
replace full siding on the back and sides of the house like for like james hardie not visible from street. replacement of plywood in-kind. | $35,000 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 1227 47th Av | replacing the siding of four sides of the building to hardie plans. total of 4400 sq ftDetails
replacing the siding of four sides of the building to hardie plans. total of 4400 sq ft | $25,000 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 949 Hampshire St | kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet.Details
kitchen and bathroom remodel: kitchen-demolish existing cabinets, island, pony wall 2" wall sigment, install new cabinets & island. bathroom: demolish existing vanity and toile, install enw double sink vanity and toilet. | $30,000 |
| Sep 19, 2025 | Completed final sign-off Nov 2025 | 466 Joost Av | guest bathroom remodel (partial) replace vanity, fan, toilet, floor tile, paint upgrade mep to code (like for like) 35 sqft. of work area. no work at tub and tub surround.Details
guest bathroom remodel (partial) replace vanity, fan, toilet, floor tile, paint upgrade mep to code (like for like) 35 sqft. of work area. no work at tub and tub surround. | $4,000 |
| Aug 29, 2025 | Completed final sign-off Jan 2026 | 300 Beale St | unit 504 - bathroom remodel, replace vanity, toilet, exhaust fan, security bars, mirror, light fixtures, new recessed light above shower and replace existing door for laundry closet & 2 recessed lights in bedroom. bathroom 50sqftDetails
unit 504 - bathroom remodel, replace vanity, toilet, exhaust fan, security bars, mirror, light fixtures, new recessed light above shower and replace existing door for laundry closet & 2 recessed lights in bedroom. bathroom 50sqft | $2,500 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 137 Congo St | kitchen remodel like for like, no structural changes 120 sqft.Details
kitchen remodel like for like, no structural changes 120 sqft. | $18,000 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 1506 Newcomb Av | bathroom remodel, convert walk in shower to a tub. new wall tiles, new vanity, and fan 40 sq ft. like for like, in kind remodel.Details
bathroom remodel, convert walk in shower to a tub. new wall tiles, new vanity, and fan 40 sq ft. like for like, in kind remodel. | $8,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 111 Topeka Av | bathroom remodel like for like. 33 sq ft. tub to shower.Details
bathroom remodel like for like. 33 sq ft. tub to shower. | $25,000 |
| Jul 25, 2025 | Completed final sign-off Dec 2025 | 2091 32nd Av | kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft.Details
kitchen and master bathroom remodel like for like. no structual changes. bathroom 80 sqft and kitchen 120 sqft. | $30,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2053 Golden Gate Av | kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring.Details
kitchen remodel. demolition of interior wall in kitchen area. bathroom remodel. new bathroom in master bedroom. house rewiring. | $150,000 |
| Jul 11, 2025 | Completed final sign-off Jan 2026 | 1310 Fulton St | kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floorDetails
kitchen remodel, no structural changes like for like 50 sq ft. guest bathroom remodel, no structural changes, like for like shower 45 sq ft. masterbathroom remodel, no structural changes like for like tub 55 sq ft. all on first floor | $50,000 |
| Jul 2, 2025 | Completed final sign-off Sep 2025 | 2538 Bryant St | bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall.Details
bathroom remodel on third floor. remove interior walls- non load bearing wall and load bearing wall. | $22,000 |
| Jul 2, 2025 | Completed final sign-off Sep 2025 | 2776 35th Av | bathroom remodel. remove non structural wall. move washer and dryer to the garage.Details
bathroom remodel. remove non structural wall. move washer and dryer to the garage. | $30,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2025 | 380 Valencia St | revision to pa #202502049646 to swap toddler and preschool classrooms.Details
revision to pa #202502049646 to swap toddler and preschool classrooms. | |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 423 Waller St | unit 1 - bathroom remodel like for like, no structural changes, walk-in shower.Details
unit 1 - bathroom remodel like for like, no structural changes, walk-in shower. | $25,000 |
| May 2, 2025 | Completed final sign-off Jun 2025 | 5175 Diamond Heights Bl | unit 109: bathroom remodel (not a full bathroom remodel) only shower remodel. replace fan.Details
unit 109: bathroom remodel (not a full bathroom remodel) only shower remodel. replace fan. | $8,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 555 Golden Gate Av | unit 601: convert tub to shower. install 1 recessed lights in the bathroom. not a full bathroom remodel.Details
unit 601: convert tub to shower. install 1 recessed lights in the bathroom. not a full bathroom remodel. | $10,000 |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 380 Valencia St | change of occupancy type e to i-4. update restrooms to ada compliance, remove partitions, move sinks,Details
change of occupancy type e to i-4. update restrooms to ada compliance, remove partitions, move sinks, | |
| Jan 24, 2025 | Completed final sign-off Apr 2025 | 750 Van Ness Av | unit 204: bathroom remodel convert tub to showerDetails
unit 204: bathroom remodel convert tub to shower | $30,000 |
| Jan 16, 2025 | Completed final sign-off May 2025 | 1978 Palou Av | remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls.Details
remodel kitchen & 1 bathroom, like for like. convert tub to shower in same location. no structural changes. no moving walls. | $40,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2026 | 1430 Hyde St | reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair.Details
reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair. | $100,000 |
| Dec 27, 2024 | Completed final sign-off Feb 2025 | 241 Victoria St | 10,000 sq ft siding replacement. from siding to fiber cement james hardie in the back, right & left side. no work to the front. both side walls(north and south) are existing wood siding.Details
10,000 sq ft siding replacement. from siding to fiber cement james hardie in the back, right & left side. no work to the front. both side walls(north and south) are existing wood siding. | $10,000 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 695 27th Av | bathroom remodel (117sf)Details
bathroom remodel (117sf) | $30,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 774 30th Av | remove (e) doors & window in bathroom. (n) window in bathroom. remove (e) bathtub, new showerDetails
remove (e) doors & window in bathroom. (n) window in bathroom. remove (e) bathtub, new shower | $40,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 4218 Lawton St | one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage).Details
one bathroom remodel like for like, one kitchen remodel like for like, rewire entire house (beside the garage). | $60,000 |
| Nov 15, 2024 | Completed final sign-off Jan 2025 | 626 Detroit St | bathroom remodel like for like no wall removal and no layout change.Details
bathroom remodel like for like no wall removal and no layout change. | $35,000 |
| Sep 10, 2024 | Completed final sign-off Feb 2026 | 670 Noe St | demo the (e) front stair and construction of (n) one. the front planter also changes to include a walkway.Details
demo the (e) front stair and construction of (n) one. the front planter also changes to include a walkway. | $40,000 |
| Oct 18, 2023 | Completed final sign-off Mar 2026 | 1227 47th Av | renovation (e) 2nd and 3rd levels. 0 sf added. new flat roof w/ deck at (e) 2nd fl roof. remove rear roof dormers and replace w/ pitch roof to match (e), new rear gable wall. new toilet and lav on 3rd lv, new laundry closet on 2nd level. replace roof. replace selectDetails
renovation (e) 2nd and 3rd levels. 0 sf added. new flat roof w/ deck at (e) 2nd fl roof. remove rear roof dormers and replace w/ pitch roof to match (e), new rear gable wall. new toilet and lav on 3rd lv, new laundry closet on 2nd level. replace roof. replace select | $300,000 |
| Jan 7, 2020 | In progress issued May 2024 | 552 Hill St | abate complaint #2018-002876enf;return (e) units as permit bybpa #200312313258 (2 legal units);(e) 1st+2nd/fl to be 1 unit (552),retain a 2nd kitchen on 1st floor;(e) 3rd/fl to be kept as a stand-alone unit,including (n) kitchen (554);legalize 72sf & deck + extension rear.Details
abate complaint #2018-002876enf;return (e) units as permit bybpa #200312313258 (2 legal units);(e) 1st+2nd/fl to be 1 unit (552),retain a 2nd kitchen on 1st floor;(e) 3rd/fl to be kept as a stand-alone unit,including (n) kitchen (554);legalize 72sf & deck + extension rear. | $50,000 |