Alexis Ng
- Listed as
- engineer
- On San Francisco permits
- May 2025 to Aug 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 425 07th St | replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system.Details
replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system. | $209,208 | |
| May 14, 2025 | In progress issued Jun 2025 | 693 Vermont St | Yerba Buena Engineering & Construction | relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site.Details
relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site. | $250,000 |