Yerba Buena Engineering & Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2006 to May 2025
- Last 24 months
- 1 permit filed
14 permits since 2000: 3 completed, 1 in progress, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2025 | In progress issued Jun 2025 | 693 Vermont St | relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site.Details
relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site. | $250,000 |
| Mar 18, 2022 | Never finaled issued Apr 2022, no final | 1201 Mason St | in-kind replacement of 3 exterior rollup doors for cable car barn. project is categorically exempt from the california environmental quality act. ceqa# 2021-006989env. cpa# 2021-006989coa.Details
in-kind replacement of 3 exterior rollup doors for cable car barn. project is categorically exempt from the california environmental quality act. ceqa# 2021-006989env. cpa# 2021-006989coa. | $199,999 |
| Nov 17, 2020 | Completed final sign-off Nov 2023 | 1849 Harrison St | ada upgrades to facility which include restroom renovation, hand rails, signage, removal of drinking fountains and door replacement.Details
ada upgrades to facility which include restroom renovation, hand rails, signage, removal of drinking fountains and door replacement. | $330,000 |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 708 Buchanan St | excavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540.Details
excavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540. | $20,000 |
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 401 Van Ness Av | ada upgrades at site path of travel, site drainageimprovements & electrical improvements.Details
ada upgrades at site path of travel, site drainageimprovements & electrical improvements. | $360,000 |
| Jul 11, 2013 | Never finaled issued Aug 2013, no final | 1800 Jerrold Av | site improvements including new water & sewer utilities, new concrete pads, minor regrading & paving. new fencing.Details
site improvements including new water & sewer utilities, new concrete pads, minor regrading & paving. new fencing. | $150,000 |
| Nov 2, 2012 | Never finaled issued Nov 2012, no final | 1001 Potrero Av | grading permit per mayors office on disability-barrier removal ada complaint landing, crosswalk & parking (repairs & grading-ada compliance)Details
grading permit per mayors office on disability-barrier removal ada complaint landing, crosswalk & parking (repairs & grading-ada compliance) | $125,000 |
| Jul 23, 2010 | Never finaled issued Jul 2010, no final | 1001 Potrero Av | revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit.Details
revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit. | $1,500 |
| Jun 7, 2010 | Never finaled issued Jul 2010, no final | 1001 Potrero Av | building 80 & 90: modify existing parking lot to create a van accessible passenger drop-off and loading zone with an accessible pedestrian path of travel to the rear entrance of building 80 & 90.Details
building 80 & 90: modify existing parking lot to create a van accessible passenger drop-off and loading zone with an accessible pedestrian path of travel to the rear entrance of building 80 & 90. | $200,000 |
| May 18, 2010 | Expired or cancelled cancelled Jan 2026 | 131 Lenox Wy | replace e tbar acoustical tile system in corridor and offices after a new design build mechanical system to be installed under separate permit. title-24 lighting compliance under separate permit.Details
replace e tbar acoustical tile system in corridor and offices after a new design build mechanical system to be installed under separate permit. title-24 lighting compliance under separate permit. | $20,000 |
| Jun 23, 2009 | Completed final sign-off Mar 2010 | 851 38th Av | demo existing concrete retaining wall, concrete curb, acpaving. install new concrete retaining wall, fencing, concrete curb, ac paving.Details
demo existing concrete retaining wall, concrete curb, acpaving. install new concrete retaining wall, fencing, concrete curb, ac paving. | $300,000 |
| Jun 11, 2009 | Completed final sign-off Sep 2009 | 1 Zoo Rd | site improvements, gate improvements, animal exhibit improvements to an existing animal exhibit, previously approved pa #200701192132.Details
site improvements, gate improvements, animal exhibit improvements to an existing animal exhibit, previously approved pa #200701192132. | $350,000 |
| Aug 6, 2008 | Never finaled issued Sep 2008, no final | 95 Justin Dr | installation of prefabricated restroom building in public park (using piers for foundation)Details
installation of prefabricated restroom building in public park (using piers for foundation) | |
| Oct 2, 2006 | Never finaled issued Jan 2007, no final | 1 Zoo Rd | pathway regarding ramps/handrail, ada improvement work at various sites st s.f. zoo. site work only and no bldngs.Details
pathway regarding ramps/handrail, ada improvement work at various sites st s.f. zoo. site work only and no bldngs. |