Albert Seto
- Listed as
- architect, engineer
- Firm
- Seto & Associates
- Based in
- Pacifica
- On San Francisco permits
- Dec 2006 to Jul 2019
13 permits since 2000 (engineer on 11 permits, architect on 2 permits): 8 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2019 | Completed final sign-off Feb 2022 | 3434 Scott St | Macrobuild Corporation | 2nd and 3rd fl : relocate and remodel e kitchen, new powder rm, add bedrm/guest rm, add 1 full bath, relocate renew furnace,wtr htr. replace e window in kind side of rear building. remove struc roof at gr flDetails
2nd and 3rd fl : relocate and remodel e kitchen, new powder rm, add bedrm/guest rm, add 1 full bath, relocate renew furnace,wtr htr. replace e window in kind side of rear building. remove struc roof at gr fl | $150,000 |
| May 31, 2019 | Completed final sign-off Jan 2021 | 1695 Market St | Smarter Construction Inc | tenant improvement to remodel for new restaurant. dining area, kitchen upgrade, ada restrooms, elec, plumb & furnace.Details
tenant improvement to remodel for new restaurant. dining area, kitchen upgrade, ada restrooms, elec, plumb & furnace. | $120,000 |
| Jan 30, 2019 | Completed final sign-off Apr 2019 | 135 04th St | Mikeco Construction Company | unit #4536: replace extg equipment on a fast food shop. (e) hvac system to remain, @ (e) retail space @ metreonDetails
unit #4536: replace extg equipment on a fast food shop. (e) hvac system to remain, @ (e) retail space @ metreon | $8,000 |
| Sep 8, 2017 | Completed final sign-off Apr 2018 | 706 Sacramento St | Purev General Contracting | convert extg unisex restroom to an ada unisex bathroom(barrer removeal)n/a for maherDetails
convert extg unisex restroom to an ada unisex bathroom(barrer removeal)n/a for maher | $25,000 |
| Apr 17, 2012 | Completed final sign-off Aug 2012 | 1419 Stockton St | J B M Construction | install two steel frames in (e) bldg and shear collectors. modify the front entrance at ground floor. install 4-drill piers foundations. phase one of three- no exterior work.Details
install two steel frames in (e) bldg and shear collectors. modify the front entrance at ground floor. install 4-drill piers foundations. phase one of three- no exterior work. | $45,000 |
| May 13, 2008 | Expired or cancelled expired Sep 2010 | 142 Saturn St | excavate a portion of the ex. ground floor and legalize ex. family room and den. remodel bathroom, add and replace ex. lighting, replace side door and window on the ground floor. replace ex. retaining wall at the front yard.Details
excavate a portion of the ex. ground floor and legalize ex. family room and den. remodel bathroom, add and replace ex. lighting, replace side door and window on the ground floor. replace ex. retaining wall at the front yard. | $38,000 | |
| Dec 28, 2007 | Never finaled issued Dec 2007, no final | 136 Saturn St | revision to pa# 2006/12/14/9897/s1r2. to change interior stair orientation, bathroom layout. revise window sizes and convert 2 windows to 1 large window on the side of the bldg. reduce some post sizes from 6x6 to 4x6.Details
revision to pa# 2006/12/14/9897/s1r2. to change interior stair orientation, bathroom layout. revise window sizes and convert 2 windows to 1 large window on the side of the bldg. reduce some post sizes from 6x6 to 4x6. | ||
| Nov 28, 2007 | Never finaled issued Nov 2007, no final | 142 Saturn St | underpinning the east side of house footing. ref. to appl. # 200612149879 si-r-2.Details
underpinning the east side of house footing. ref. to appl. # 200612149879 si-r-2. | $15,000 | |
| Aug 31, 2007 | Completed final sign-off Nov 2007 | 925 Vallejo St | add raincover over (e) landing. (n) 4' x 9'-6" roof. rear bldg not visible from street.comply with nov 200711535Details
add raincover over (e) landing. (n) 4' x 9'-6" roof. rear bldg not visible from street.comply with nov 200711535 | $1,500 | |
| Aug 23, 2007 | Expired or cancelled expired May 2009 | 2949 Sacramento St | excavation shoring required by 2006/0223/5320Details
excavation shoring required by 2006/0223/5320 | $40,000 | |
| Jan 3, 2007 | Completed final sign-off Apr 2007 | 4675 Mission St | Caico Development & Constr. | remove (e) partitions, add one handicap bathroom, change front door, relocate water heaterDetails
remove (e) partitions, add one handicap bathroom, change front door, relocate water heater | $26,000 |
| Jan 3, 2007 | Completed final sign-off Apr 2007 | 4681 Mission St | remove (e) partitions, add one handicap bathroomsDetails
remove (e) partitions, add one handicap bathrooms | $14,000 | |
| Dec 14, 2006 | Expired or cancelled expired Dec 2009 | 136 Saturn St | expand (e) 1 car to 2 car garage, (e) 1st & 2nd floor interior remodel interior remodel, (n) 2nd floor addition @ rear, (n) 3rd floor addition, (n) concrete stair to rear yard.Details
expand (e) 1 car to 2 car garage, (e) 1st & 2nd floor interior remodel interior remodel, (n) 2nd floor addition @ rear, (n) 3rd floor addition, (n) concrete stair to rear yard. | $200,000 |