Alan Mark Waldman
- Listed as
- architect, engineer
- Firm
- P E C I
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to Apr 2026
20 permits since 2000 (engineer on 11 permits, architect on 9 permits): 10 completed, 10 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | In progress issued Jun 2026 | 2660 Ocean Av | Pacific Engineering & Construction Inc. | bathroom remodel ada compliant. (n) bathroom fan in ada bathroom. (n) bathroom fan in (e) non ada restroom.Details
bathroom remodel ada compliant. (n) bathroom fan in ada bathroom. (n) bathroom fan in (e) non ada restroom. | $5,000 |
| Apr 22, 2026 | In progress issued Aug 2026 | 681 48th Av | Newfield Construction | shoring plan for (n) retaining wall. ref pa# 202604179633 & 202604179647.Details
shoring plan for (n) retaining wall. ref pa# 202604179633 & 202604179647. | $2,500 |
| Apr 22, 2026 | In progress issued Aug 2026 | 679 48th Av | Newfield Construction | shoring plan for (n) retaining wall. ref pa# 202604179633 & 202604179647.Details
shoring plan for (n) retaining wall. ref pa# 202604179633 & 202604179647. | $2,500 |
| Apr 17, 2026 | In progress issued Aug 2026 | 679 48th Av | Newfield Construction | install (n) retaining wall, remove (e) retaining wall. grading maximum 15 yards. ref shoring permit# 202604229848Details
install (n) retaining wall, remove (e) retaining wall. grading maximum 15 yards. ref shoring permit# 202604229848 | $25,000 |
| Apr 17, 2026 | In progress issued Aug 2026 | 681 48th Av | Newfield Construction | remove (e) retaining wall replace with (w) retaining wall grading max 15 yards. share plans 202604179633Details
remove (e) retaining wall replace with (w) retaining wall grading max 15 yards. share plans 202604179633 | $500 |
| Feb 12, 2026 | Completed final sign-off Jul 2026 | 2660 Ocean Av | Pacific Engineering & Construction Inc. | demo interior partition walls. remove electrical conduit and lighting. remove floor tile, carpeting, etc. remove hvac equipment at ceiling, remove non-structural framing. ab-017Details
demo interior partition walls. remove electrical conduit and lighting. remove floor tile, carpeting, etc. remove hvac equipment at ceiling, remove non-structural framing. ab-017 | $5,000 |
| Oct 17, 2025 | In progress issued Jan 2026 | 303 12th Av | Pacific Engineering & Construction Inc. | comply with abe program #202207292679: sidewalk redesign (ramp to the entry, gutter, curb). (3) entry doorsDetails
comply with abe program #202207292679: sidewalk redesign (ramp to the entry, gutter, curb). (3) entry doors | $35,000 |
| Aug 28, 2025 | In progress issued Sep 2025 | 1911 20th St | Shamrock Engineering Concrete, Cht Properties Development | new rear landscape retaining walls. ref pa 2018.0618.2159Details
new rear landscape retaining walls. ref pa 2018.0618.2159 | $5,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | Ignacio Camarillo Reyes | studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | Ignacio Camarillo Reyes | studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Feb 28, 2025 | In progress filed Feb 2025, not yet issued | 1346 41st Av | Pacific Engineering & Construction Inc., Tachtook Tacktook Construction | remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall.Details
remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall. | $15,000 |
| Feb 6, 2025 | Completed final sign-off Oct 2025 | 32 Danvers St | Katz Group | replace finishes, cabinets, countertops & fixtures in mudroom bathroom. relocate laundry fixtures in same mudroomDetails
replace finishes, cabinets, countertops & fixtures in mudroom bathroom. relocate laundry fixtures in same mudroom | $10,000 |
| Oct 31, 2024 | Completed final sign-off Nov 2024 | 1644 Ocean Av | Pacific Engineering & Construction Inc. | comply with nov# 202303648 remove and replace in kind 3 3x4 and stuccoDetails
comply with nov# 202303648 remove and replace in kind 3 3x4 and stucco | $2,000 |
| Sep 5, 2023 | Completed final sign-off Jan 2025 | 1622 Polk St | Pacific Engineering & Construction Inc. | replace sidewalk approx. 30 ft to comply with abe ord 51-16. ref abe 201812273503Details
replace sidewalk approx. 30 ft to comply with abe ord 51-16. ref abe 201812273503 | $10,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2025 | 2580 Mcallister St | Pacific Engineering & Construction Inc. | proposed interior remodeling of (e) 3-story over basement bldg within (e) boundary. adding a deck at rear of attic level. rear only, stairs & bathroom. reference pa #202204122028, #202209142456, #202303163768Details
proposed interior remodeling of (e) 3-story over basement bldg within (e) boundary. adding a deck at rear of attic level. rear only, stairs & bathroom. reference pa #202204122028, #202209142456, #202303163768 | |
| May 30, 2023 | Completed final sign-off Jan 2025 | 1620 Polk St | Pacific Engineering & Construction Inc. | replace sidewalk, approx 30sf, to work to befored at 1618, 1620, 1622 polk street. to comply with abe ordinance 51-16 under abe#201812273539.Details
replace sidewalk, approx 30sf, to work to befored at 1618, 1620, 1622 polk street. to comply with abe ordinance 51-16 under abe#201812273539. | $10,000 |
| Mar 16, 2023 | Completed final sign-off Jul 2024 | 2580 Mcallister St | Pacific Engineering & Construction Inc. | structural revision to permit 202209142456. remove brick footing/foundation in garage. add concrete footing.Details
structural revision to permit 202209142456. remove brick footing/foundation in garage. add concrete footing. | $5,000 |
| Sep 14, 2022 | Completed final sign-off Aug 2025 | 2580 Mcallister St | Pacific Engineering & Construction Inc. | remodel (e) signgle family dwelling modify walls and rooms layout, remodel kitchen, bathrooms. add new bathrooms, relocate stairs. interior remodel only. basement work under separate permit 2022 0412 2028.Details
remodel (e) signgle family dwelling modify walls and rooms layout, remodel kitchen, bathrooms. add new bathrooms, relocate stairs. interior remodel only. basement work under separate permit 2022 0412 2028. | $200,000 |
| Aug 9, 2021 | Completed final sign-off Feb 2024 | 16 Dellbrook Av | Pacific Engineering & Construction Inc. | revision to pa 202106081941. change deck location.Details
revision to pa 202106081941. change deck location. | |
| Mar 16, 2021 | Completed final sign-off Mar 2021 | 437 Ellsworth St | R & D Construction Co Inc | revision to pa# 201807033727. relocate (e) skylights, reconfigure powder room & kitchen & stairway layout to 2nd floor per plan.Details
revision to pa# 201807033727. relocate (e) skylights, reconfigure powder room & kitchen & stairway layout to 2nd floor per plan. |