Al Saadeh
- Listed as
- engineer
- Firm
- Aws
- On San Francisco permits
- May 2007 to May 2020
12 permits since 2000 (engineer on 12 permits): 11 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2020 | Completed final sign-off Dec 2020 | 1904 Baker St | 5 Elements Design | remove (e) 6ft high back yard fence & replace w/ (n) 10ft high back yard fence.Details
remove (e) 6ft high back yard fence & replace w/ (n) 10ft high back yard fence. | $17,000 |
| Dec 18, 2019 | Completed final sign-off Apr 2022 | 365 Castenada Av | A C Contracting | remove existing damaged foundation as per plan. reference pa #201306200076 for abatement of nov #201384702Details
remove existing damaged foundation as per plan. reference pa #201306200076 for abatement of nov #201384702 | $67,500 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 995 Clayton St | A C Contracting | remove & replace retain wall @ rear property line below grade.Details
remove & replace retain wall @ rear property line below grade. | $18,000 |
| Jul 11, 2017 | Completed final sign-off Mar 2019 | 2250 Pine St | Abs Construction | soft story retrofit per sfebc chapter 4d, fema p-807Details
soft story retrofit per sfebc chapter 4d, fema p-807 | $70,000 |
| May 2, 2016 | Completed final sign-off Sep 2016 | 1721 Clement St | Bay Metro Corporation | exterior 2/f stair landing at rear repair.Details
exterior 2/f stair landing at rear repair. | $9,000 |
| Jun 23, 2015 | Never finaled issued Aug 2015, no final | 1323 Noe St | Milan Construction | extend yard deck-garbage enclosureDetails
extend yard deck-garbage enclosure | $8,000 |
| May 15, 2015 | Completed final sign-off Sep 2015 | 130 Park St | Milan Construction | kitchen & bathroom remodel including removal of a wall between kitchen and family room.Details
kitchen & bathroom remodel including removal of a wall between kitchen and family room. | $75,000 |
| Jun 12, 2014 | Completed final sign-off Jun 2015 | 330 Brentwood Av | Commins Construction Co | addendum to pa#201304225103, construct interior storage room at basement per plan.Details
addendum to pa#201304225103, construct interior storage room at basement per plan. | $3,500 |
| Apr 1, 2013 | Completed final sign-off Sep 2013 | 700 05th Av | Bay Metro Corporation | fire damage repair, replace beam & few joist in garage area. demo smoke damage area to replace drywall.Details
fire damage repair, replace beam & few joist in garage area. demo smoke damage area to replace drywall. | $50,000 |
| May 12, 2011 | Completed final sign-off Jun 2011 | 80 Homestead St | A C Contracting | foundation replacement 36'6Details
foundation replacement 36'6 | $9,800 |
| Nov 19, 2008 | Completed final sign-off Mar 2010 | 901 Haight St | legalize sign a per planning general advertising sign in lieu request. 1-6x12 sign, lower east facing wallDetails
legalize sign a per planning general advertising sign in lieu request. 1-6x12 sign, lower east facing wall | $750 | |
| May 2, 2007 | Completed final sign-off Oct 2008 | 90 Saturn St | #90: remodel kitchen, master bedroom and bath, convert storage to living space, 1st fl, add rear door and stair to yard. replace ext deck. #92: add laundry and upgrade electric. remove (e) ext. stair. repair leaking roof.Details
#90: remodel kitchen, master bedroom and bath, convert storage to living space, 1st fl, add rear door and stair to yard. replace ext deck. #92: add laundry and upgrade electric. remove (e) ext. stair. repair leaking roof. | $100,000 |