Abs Construction
- Based in
- Antioch
- On San Francisco permits
- Jan 2016 to Dec 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2017 | Completed final sign-off Jan 2018 | 815 Laguna Honda Bl | sheetrock (e) rooms, mechanical room and garage. all sheetrock/drywall to be 5/8" type-x spec'd. all rooms above 1st floor except garage & storage areaDetails
sheetrock (e) rooms, mechanical room and garage. all sheetrock/drywall to be 5/8" type-x spec'd. all rooms above 1st floor except garage & storage area | $8,000 |
| Jul 11, 2017 | Completed final sign-off Mar 2019 | 2250 Pine St | soft story retrofit per sfebc chapter 4d, fema p-807Details
soft story retrofit per sfebc chapter 4d, fema p-807 | $70,000 |
| Nov 28, 2016 | Completed final sign-off Jun 2017 | 1431 Baker St | unit a: replace kitchen cabinets as existing. install 1 sink, add 2 recept, unit aDetails
unit a: replace kitchen cabinets as existing. install 1 sink, add 2 recept, unit a | $8,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 825 Laguna Honda Bl | remove and replace countertops, cabinets, appliances and sink. replace electrical. put in led lights.Details
remove and replace countertops, cabinets, appliances and sink. replace electrical. put in led lights. | $5,000 |
| Jan 13, 2016 | Completed final sign-off Jan 2017 | 815 Laguna Honda Bl | 1st floor: add 2 bedrooms, 1 mud room, 1 full bath. 2nd floor: remodel kitchen and bathroom and convert nook into bedroom.Details
1st floor: add 2 bedrooms, 1 mud room, 1 full bath. 2nd floor: remodel kitchen and bathroom and convert nook into bedroom. | $75,000 |