Abby Banerjee

License
M29253
Look the license up with the state
Listed as
engineer
Firm
Optimun Energy Design
On San Francisco permits
Apr 2017 to Jul 2026

12 permits since 2000 (engineer on 12 permits): 4 completed, 2 in progress, 6 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 27, 2026In progress
filed Jul 2026, not yet issued
120 Stockton St1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures.
Details
Permit
202607275619
Status
filed
Filed
Jul 27, 2026
Declared cost
$750,000
Address
120 Stockton St

1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures.

Open the permit page

$750,000
Jul 23, 2026In progress
filed Jul 2026, not yet issued
120 Stockton St1/f: interior t.i to expand an (e) m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sqft. the adjacent space is under the same brand/ownership and filed in a seperate permit app. work includes nonloading partitions,...
Details
Permit
202607235449
Status
filed
Filed
Jul 23, 2026
Declared cost
$1,250,000
Address
120 Stockton St

1/f: interior t.i to expand an (e) m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sqft. the adjacent space is under the same brand/ownership and filed in a seperate permit app. work includes nonloading partitions,...

Open the permit page

$1,250,000
Dec 6, 2024Completed
final sign-off Apr 2025
331 Powell StTurner Construction Codeferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only
Details
Permit
202412066325
Status
complete
Filed
Dec 6, 2024
Permit issued
Feb 5, 2025
Final sign-off
Apr 1, 2025
Declared cost
$497,168
Address
331 Powell St

deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only

Open the permit page

$497,168
Apr 25, 2022Never finaled
issued Jul 2022, no final
2109 Fillmore StPremier Structures Increnovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural work
Details
Permit
202204252933
Status
issued
Filed
Apr 25, 2022
Permit issued
Jul 7, 2022
Declared cost
$148,000
Address
2109 Fillmore St

renovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural work

Open the permit page

$148,000
Apr 2, 2019Completed
final sign-off Jun 2019
350 Bush StControl Air North Inclevel b2: as-built mech drawings. ref to pa201808036431. maher n/a.
Details
Permit
201904026840
Status
complete
Filed
Apr 2, 2019
Permit issued
Apr 2, 2019
Final sign-off
Jun 20, 2019
Address
350 Bush St

level b2: as-built mech drawings. ref to pa201808036431. maher n/a.

Open the permit page

Aug 3, 2018Completed
final sign-off Jun 2019
350 Bush StControl Air North Inchvac build out of an (e) space ti - ref 201805118936, only for locker rooms, plan room, engineering shop. approx 1000 sq ft area for janitorial and building maintenance staff located in level 2 basement. 4 new fsd's. maher n/a.
Details
Permit
201808036431
Status
complete
Filed
Aug 3, 2018
Permit issued
Sep 27, 2018
Final sign-off
Jun 20, 2019
Declared cost
$120,000
Address
350 Bush St

hvac build out of an (e) space ti - ref 201805118936, only for locker rooms, plan room, engineering shop. approx 1000 sq ft area for janitorial and building maintenance staff located in level 2 basement. 4 new fsd's. maher n/a.

Open the permit page

$120,000
Oct 12, 2017Completed
final sign-off Mar 2018
1 Avenue Of The Palmsmechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13
Details
Permit
201710121141
Status
complete
Filed
Oct 12, 2017
Permit issued
Oct 27, 2017
Final sign-off
Mar 1, 2018
Address
1 Avenue Of The Palms

mechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13

Open the permit page

Jun 14, 2017Never finaled
issued Jul 2017, no final
500 Pine StControl Air North Increvision to title 24 compliance documentation. ref app#201704103545, 201704103546,201704103548, 201704103551.
Details
Permit
201706149359
Status
issued
Filed
Jun 14, 2017
Permit issued
Jul 10, 2017
Address
500 Pine St

revision to title 24 compliance documentation. ref app#201704103545, 201704103546,201704103548, 201704103551.

Open the permit page

Apr 10, 2017Never finaled
issued May 2017, no final
500 Pine StControl Air North Inc4th flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0228-0234
Details
Permit
201704103548
Status
issued
Filed
Apr 10, 2017
Permit issued
May 5, 2017
Declared cost
$150,000
Address
500 Pine St

4th flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0228-0234

Open the permit page

$150,000
Apr 10, 2017Never finaled
issued May 2017, no final
500 Pine StControl Air North Inc5th flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0214-9358
Details
Permit
201704103551
Status
issued
Filed
Apr 10, 2017
Permit issued
May 5, 2017
Declared cost
$150,000
Address
500 Pine St

5th flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0214-9358

Open the permit page

$150,000
Apr 10, 2017Never finaled
issued May 2017, no final
500 Pine StControl Air North Inc3rd flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0228-0233
Details
Permit
201704103546
Status
issued
Filed
Apr 10, 2017
Permit issued
May 5, 2017
Declared cost
$150,000
Address
500 Pine St

3rd flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0228-0233

Open the permit page

$150,000
Apr 10, 2017Never finaled
issued May 2017, no final
500 Pine StControl Air North Inc2nd flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0214-9356
Details
Permit
201704103545
Status
issued
Filed
Apr 10, 2017
Permit issued
May 5, 2017
Declared cost
$150,000
Address
500 Pine St

2nd flr: mechanical duct work, mechanical piping, mechanical controls ref 2017-0214-9356

Open the permit page

$150,000