Bathroom remodel contractors in San Francisco
8,733 contractors have filed bathroom remodel permits in San Francisco since 2000. By permit record, the leaders are: Brady Construction (86 of 86 completed), Camp Roofing Ltd Dba Camp Construction (353 of 415 completed) and Chl Construction Company (49 of 52 completed).
Ranked across every bathroom remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the bathroom remodel contractors, the 400 that lead on this sort were read; the rest are not in this list. Showing contractors with a bathroom remodel permit in the last 5 years. Include inactive contractors
- 1Brady ConstructionLicense 539362 86 permits: 86 completed. Last filed May 2026. Typically 78 days from permit to final inspection.
- 2Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 415 permits: 353 completed, 56 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection. Never finaled: 4 are 3 to 5 years old.
- 3Chl Construction CompanyLicense 960561 52 permits: 49 completed, 3 in progress. Last filed Jun 2026. Typically 249 days from permit to final inspection.
- 4William Gregory ClauseLicense 831583 109 permits: 107 completed, 2 expired or cancelled. Last filed Jul 2024. Typically 181 days from permit to final inspection.
- 5Jason Liu Construction CompanyLicense 662067 41 permits: 40 completed, 1 in progress. Last filed Aug 2026. Typically 243 days from permit to final inspection.
- 6Dunros ConstructionLicense 977841 42 permits: 39 completed, 3 in progress. Last filed May 2026. Typically 158 days from permit to final inspection.
- 7Chongson Construction Co.License 642065 39 permits: 39 completed. Last filed Mar 2025. Typically 125 days from permit to final inspection.
- 8Mr UngerLicense 982722 41 permits: 38 completed, 3 in progress. Last filed Aug 2026. Typically 58 days from permit to final inspection.
- 9Valex ConstructionLicense 809059 65 permits: 62 completed, 2 in progress, 1 never finaled. Last filed Jul 2026. Typically 82 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 10Be Home Remodeling IncLicense 1115373 49 permits: 36 completed, 13 in progress. Last filed Aug 2026. Typically 63 days from permit to final inspection.
- 11Steven Liao Construction CompanyLicense 690964 38 permits: 35 completed, 3 in progress. Last filed Sep 2026. Typically 189 days from permit to final inspection.
- 12Hang C Construction IncLicense 760153 36 permits: 35 completed, 1 in progress. Last filed May 2025. Typically 180 days from permit to final inspection.
- 13Sean M O'reillyLicense 812877 34 permits: 34 completed. Last filed May 2026. Typically 84 days from permit to final inspection.
- 14We Do Construction Inc.License 1096552 95 permits: 74 completed, 19 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 98 days from permit to final inspection.
- 15Sure, Inc.License 561658 727 permits: 673 completed, 11 in progress, 25 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection. Never finaled: 10 are 5 to 10 years old, 15 are over 10 years old.
- 16Hong Shink ConstructionLicense 758888 57 permits: 54 completed, 2 in progress, 1 never finaled. Last filed Jun 2026. Typically 142 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 17B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Dec 2025. Typically 102 days from permit to final inspection.
- 18Bay Metro CorporationLicense 850352 54 permits: 52 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 119 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 19S H C ILicense 887172 30 permits: 30 completed. Last filed Sep 2023. Typically 129 days from permit to final inspection.
- 20Yefa Construction IncLicense 1047719 31 permits: 29 completed, 2 in progress. Last filed Nov 2025. Typically 310 days from permit to final inspection.
- 21Jin Qing Construction Corp.License 1030182 30 permits: 29 completed, 1 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 22Yiu's Construction CoLicense 802681 85 permits: 81 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 105 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old.
- 23Toni's Construction IncLicense 551504 67 permits: 65 completed, 2 expired or cancelled. Last filed Apr 2025. Typically 141 days from permit to final inspection.
- 24Great Ocean Construction Inc.License 1103304 32 permits: 28 completed, 4 in progress. Last filed Jul 2026. Typically 138 days from permit to final inspection.
- 25Darc Ventures Inc Dba Spl Construction SLicense 938513 80 permits: 74 completed, 3 in progress, 3 expired or cancelled. Last filed Aug 2026. Typically 178 days from permit to final inspection.
- 26Landmark Construction Inc.License 907832 45 permits: 44 completed, 1 never finaled. Last filed Apr 2023. Typically 148 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 27Nelson T Lewis Const Co Inc.License 195866 94 permits: 87 completed, 3 in progress, 4 expired or cancelled. Last filed Sep 2026. Typically 88 days from permit to final inspection.
- 28At6 Design BuildLicense 283485 45 permits: 43 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 288 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 29Kenneth ChiuLicense 817869 26 permits: 25 completed, 1 in progress. Last filed Jul 2026. Typically 93 days from permit to final inspection.
- 30T T General ConstructionLicense 927524 26 permits: 25 completed, 1 in progress. Last filed Feb 2026. Typically 184 days from permit to final inspection.
- 31J. Ho Construction IncLicense 680425 142 permits: 133 completed, 1 in progress, 4 never finaled, 4 expired or cancelled. Last filed Apr 2026. Typically 89 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
- 32Bai Yuan LiLicense 923824 42 permits: 41 completed, 1 never finaled. Last filed Dec 2025. Typically 147 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 33Lee And Son Construction Inc.License 961053 64 permits: 55 completed, 7 in progress, 1 never finaled, 1 expired or cancelled. Last filed Jun 2026. Typically 200 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 34Winder Construction Inc.License 1033654 28 permits: 24 completed, 4 in progress. Last filed Jun 2026. Typically 350 days from permit to final inspection.
- 35Elisha MayostLicense 881789 41 permits: 39 completed, 1 in progress, 1 expired or cancelled. Last filed Apr 2025. Typically 128 days from permit to final inspection.
- 36Ly Green Construction IncLicense 1056878 29 permits: 23 completed, 6 in progress. Last filed Sep 2026. Typically 127 days from permit to final inspection.
- 37C & L Builders Inc.License 860328 25 permits: 23 completed, 2 in progress. Last filed Sep 2026. Typically 206 days from permit to final inspection.
- 38Freemodel Inc.License 1066986 25 permits: 23 completed, 2 in progress. Last filed Sep 2026. Typically 117 days from permit to final inspection.
- 39Reliable Construction IncLicense 983658 132 permits: 109 completed, 16 in progress, 4 never finaled, 3 expired or cancelled. Last filed Aug 2026. Typically 167 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 3 are 5 to 10 years old.
- 40Flores General BuildingLicense 976557 82 permits: 74 completed, 4 in progress, 4 never finaled. Last filed Aug 2026. Typically 102 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old, 1 is over 10 years old.
How long bathroom remodel permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent bathroom remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1515 Underwood Av | interior remodeling in lower level: relocate (e) bathroom, repair damaged foundation footing and slab and new interior footing and shearwall (in lower level).Details
interior remodeling in lower level: relocate (e) bathroom, repair damaged foundation footing and slab and new interior footing and shearwall (in lower level). | $13,500 | |
| Oct 2, 2026 | In progress issued Oct 2026 | 2127 26th Av | bathroom remodel. no structural modificationsDetails
bathroom remodel. no structural modifications | $6,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 63 Escondido Av | interior remodeling & partial garage conversion to add one bedroom & 1 bathroom. scope includes bathroom & laundry reconfiguration, replacement of all existing windows with new aluminum double pane windows. windows & doors modification, hydorgen heated flooring, tankless water heater installationDetails
interior remodeling & partial garage conversion to add one bedroom & 1 bathroom. scope includes bathroom & laundry reconfiguration, replacement of all existing windows with new aluminum double pane windows. windows & doors modification, hydorgen heated flooring, tankless water heater installation | $300,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 519 Arkansas St | convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use.Details
convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use. | $125,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2298 Pacific Av | provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent.Details
provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent. | $98,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 3126 Santiago St | horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom.Details
horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom. | $180,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 522 Edinburgh St | interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansionDetails
interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansion | $50,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 762 Treat Av | 2/f: renovation of (e) bathroom, replace tub w/ shower.Details
2/f: renovation of (e) bathroom, replace tub w/ shower. | $5,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 75 Santa Ana Av | Del Rio Stone Dba: Del Rio Stone Constr. | kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room.Details
kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. | $180,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 259 17th Av | Sunset Remodeling And Design Inc | 2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into aDetails
2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into a | $20,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1307 04th Av | Remodeling Heroes Inc. | work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sfDetails
work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sf | $28,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | Cs Construction Co | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 842 Edinburgh St | Zhong Yuan Inc | interior remodel: convert part of existing 1st fl" 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet barDetails
interior remodel: convert part of existing 1st fl" 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet bar | $35,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 745 Lakeview Av | addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition.Details
addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition. | $199,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 465 Harkness Av | fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades.Details
fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades. | $80,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 148 Caine Av | to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl).Details
to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl). | $180,000 | |
| Oct 1, 2026 | In progress issued Oct 2026 | 1447 Palou Av | removal of unpermitted oven/stove and replacement with two-burner stovetop. legalize full bathroom including addition of shower.Details
removal of unpermitted oven/stove and replacement with two-burner stovetop. legalize full bathroom including addition of shower. | $1,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.Details
1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family areaDetails
units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1972 Green St | add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic.Details
add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic. | $85,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit.Details
1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress issued Oct 2026 | 250 King St | Brenes Construction | remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintainedDetails
remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintained | $9,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodelDetails
demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 55 Balceta Av | Modl Construction | remove bathtub & plumbing connections, remove bathroom finishes, fixtures accessaries & trims. demo wall, install new shower compartment, shower pan, shower plumbing, valve, shower head & drain. replace water closet, vanity. new electrical-receptacles, lights,switches, and exhaust fan. switchesDetails
remove bathtub & plumbing connections, remove bathroom finishes, fixtures accessaries & trims. demo wall, install new shower compartment, shower pan, shower plumbing, valve, shower head & drain. replace water closet, vanity. new electrical-receptacles, lights,switches, and exhaust fan. switches | $20,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 267 Bright St | new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry.Details
new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry. | $85,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1519 28th Av | revision to pa#202508122788: 1) reduce the width of new door 1 in bedroom #1. 2)relocate the sink in new bath #2. 3) window 3 like for like replacement on the 2nd floor livingroom.Details
revision to pa#202508122788: 1) reduce the width of new door 1 in bedroom #1. 2)relocate the sink in new bath #2. 3) window 3 like for like replacement on the 2nd floor livingroom. | ||
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access...Details
vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 2450 Van Ness Av | construction of a 2-unit detached adu building, type v-b, 2 story, with 1 bedroom and 1 bathroom per unit per the state programDetails
construction of a 2-unit detached adu building, type v-b, 2 story, with 1 bedroom and 1 bathroom per unit per the state program | $225,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Avila St | expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance.Details
expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance. | $744,000 |