Zhao Wei Lu Construction Co.
- Based in
- Daly City
- On San Francisco permits
- May 2008 to Aug 2017
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2017 | Never finaled issued Mar 2019, no final | 343 Rivera St | unit legalization ordinance 43-14. legalize in law apartment on ground floor as per ordinance 43-14.Details
unit legalization ordinance 43-14. legalize in law apartment on ground floor as per ordinance 43-14. | $10,000 |
| Apr 1, 2016 | Completed final sign-off Jul 2016 | 1007 Rhode Island St | revision to 201512306111, one new window (street side), change lower level room name to storage.Details
revision to 201512306111, one new window (street side), change lower level room name to storage. | $3,000 |
| Feb 4, 2016 | Completed final sign-off Jul 2016 | 1007 Rhode Island St | rev. to pa#201512306111, change wood beam to steel beam. update sizes of actual/(e) framing, 2/f framing.Details
rev. to pa#201512306111, change wood beam to steel beam. update sizes of actual/(e) framing, 2/f framing. | |
| Dec 30, 2015 | Completed final sign-off Jul 2016 | 1007 Rhode Island St | reconfigure master suite, guest suite and laundry; re-frame (correction stair to 2nd floor; add skulights and replace windows; new lighting at remokdel areas; new tank-less water heater.Details
reconfigure master suite, guest suite and laundry; re-frame (correction stair to 2nd floor; add skulights and replace windows; new lighting at remokdel areas; new tank-less water heater. | $70,000 |
| May 22, 2014 | Never finaled issued Jun 2014, no final | 163 Westgate Dr | revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter.Details
revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter. | $1,500 |
| Dec 30, 2013 | Completed final sign-off Feb 2015 | 163 Westgate Dr | legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windowsDetails
legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windows | $30,000 |
| Sep 30, 2013 | Completed final sign-off Dec 2013 | 89 Castenada Av | revision to app#201304195040 to enlarge extg stairwell. new guard wall.Details
revision to app#201304195040 to enlarge extg stairwell. new guard wall. | $4,000 |
| Aug 20, 2013 | Completed final sign-off Dec 2013 | 89 Castenada Av | replace extg windows in kind. 7 windows and 1 sliding door. door and windows not visible from street.Details
replace extg windows in kind. 7 windows and 1 sliding door. door and windows not visible from street. | $2,400 |
| Apr 19, 2013 | Completed final sign-off Dec 2013 | 89 Castenada Av | facade remodel includes chimney removal, enlarged 1 window, wall finish add-on. new awning, new entrance door & sidelitesDetails
facade remodel includes chimney removal, enlarged 1 window, wall finish add-on. new awning, new entrance door & sidelites | $20,000 |
| Jun 14, 2012 | Completed final sign-off Jul 2012 | 1365 Portola Dr | revision to appn 201202134051; revise canopy framing and detailsDetails
revision to appn 201202134051; revise canopy framing and details | |
| Feb 13, 2012 | Completed final sign-off Jul 2012 | 1365 Portola Dr | paint/color all 4 sides (exterior), landscape front yard-add gardening & entry stair remodelingDetails
paint/color all 4 sides (exterior), landscape front yard-add gardening & entry stair remodeling | $60,000 |
| Sep 1, 2011 | Never finaled issued Sep 2011, no final | 1365 Portola Dr | revision to pa# 2011-0712-0019-interior remodeling, (e) walls to remain at 1st floor, replace guardrail at 2nd floor, convert 2nd floor study room to master closet, master bathroom remodelingDetails
revision to pa# 2011-0712-0019-interior remodeling, (e) walls to remain at 1st floor, replace guardrail at 2nd floor, convert 2nd floor study room to master closet, master bathroom remodeling | $3,000 |
| Jul 14, 2011 | Completed final sign-off Aug 2011 | 747 Gates St | repair rear deck & stair:- replace guardrails at deck and stair.Details
repair rear deck & stair:- replace guardrails at deck and stair. | $3,000 |
| Jul 12, 2011 | Completed final sign-off Mar 2012 | 1365 Portola Dr | interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor.Details
interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor. | $14,500 |
| Mar 4, 2011 | Completed final sign-off Jul 2011 | 747 Gates St | remove front facade 4 bay windows:add new bath at 2nd floor.Details
remove front facade 4 bay windows:add new bath at 2nd floor. | $40,000 |
| May 19, 2008 | Completed final sign-off Aug 2008 | 1435 41st Av | remove existing deteriorated gypsum board sheathing and install new insulation and new gypsum board sheathing at 2 bedroom, dining room and living room on the 2/fl. approx 1000 sq ft of wall surface affected.Details
remove existing deteriorated gypsum board sheathing and install new insulation and new gypsum board sheathing at 2 bedroom, dining room and living room on the 2/fl. approx 1000 sq ft of wall surface affected. | $4,000 |
| May 15, 2008 | Completed final sign-off Aug 2008 | 1435 41st Av | remodel the kitchen & bathroom & painting the whole house.Details
remodel the kitchen & bathroom & painting the whole house. | $30,000 |