Zen Construction
- Based in
- Fairfax
- On San Francisco permits
- Jun 2012 to Feb 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 29, 2024 | Completed final sign-off Dec 2024 | 2081 Mission St | revision 202212138176- unit 2081 to replace dry rot wood floor with concrete slab on gradeDetails
revision 202212138176- unit 2081 to replace dry rot wood floor with concrete slab on grade | $64,000 |
| Dec 13, 2022 | Never finaled issued Apr 2023, no final | 2081 Mission St | ada toilet, entrance upgrades & tenant improvements. converting (e) non ada toilet to (n) ada toilet rm, (n) janitor's closet, (n) storefront system, (n) rear exit door, (n) ada stall parking, (n) flooring and paint, additional (n) lighting design build: mep and signage.Details
ada toilet, entrance upgrades & tenant improvements. converting (e) non ada toilet to (n) ada toilet rm, (n) janitor's closet, (n) storefront system, (n) rear exit door, (n) ada stall parking, (n) flooring and paint, additional (n) lighting design build: mep and signage. | $160,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 25 Baywood Ct | 1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall.Details
1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall. | |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 1503 Mckinnon Av | retaining wall replacementDetails
retaining wall replacement | $15,000 |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 107 24th Av | revise application number 2012/06/21/3084 install 1-1/2" combination fire service. domestic connection and fire and domestic bfp's installed within 25' of comb meter outside building.Details
revise application number 2012/06/21/3084 install 1-1/2" combination fire service. domestic connection and fire and domestic bfp's installed within 25' of comb meter outside building. | $15,000 |
| Jun 21, 2012 | Completed final sign-off Mar 2013 | 107 24th Av | installation of 1 1/2 inch water meter & 1 1/2 inch underground pipe for nfpa 13d fire sprinkler system. reference app #s 2012-0119-2571, 2012-0930-5844, overhead under #2012-0621-3084Details
installation of 1 1/2 inch water meter & 1 1/2 inch underground pipe for nfpa 13d fire sprinkler system. reference app #s 2012-0119-2571, 2012-0930-5844, overhead under #2012-0621-3084 | $1,500 |