Yuri Painting & Remodeling Dba Future Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Nov 2008
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2008 | Completed final sign-off Nov 2008 | 2161 Grove St | change siding on back side wall of the house. approx 800 sq. ft. area.Details
change siding on back side wall of the house. approx 800 sq. ft. area. | $22,000 |
| Jan 30, 2006 | Never finaled issued Jan 2006, no final | 2818 Taraval St | replacement of all windows (retrofit) total of 32 windows from aluminum single pane to vinyl double pane -in same sizesDetails
replacement of all windows (retrofit) total of 32 windows from aluminum single pane to vinyl double pane -in same sizes | $19,440 |