957 permits since 2000: 290 completed, 6 in progress, 485 never finaled, 176 expired or cancelled.
Of the 485 never-finaled permits, 34 are 3 to 5 years old, 54 are 5 to 10 years old, 397 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 957.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | Completed final sign-off Jul 2026 | 443 Harvard St | renewal of 202408068010. to obtain final inspection for work approved under pa#: 202408068010. all work is complete.Details
renewal of 202408068010. to obtain final inspection for work approved under pa#: 202408068010. all work is complete. | $26,850 |
| Jun 15, 2026 | Completed final sign-off Jul 2026 | 2625 Lincoln Wy | reroofing: all roofing marterial, clean up the roof deck. c/s roof: install #30 base sheet nail down as new underlayment. install new composite shingles as final surface. m/b flat areas: install #28 basesheeet apply modified bitumen torch down as final surface. all flashings will be replaced.Details
reroofing: all roofing marterial, clean up the roof deck. c/s roof: install #30 base sheet nail down as new underlayment. install new composite shingles as final surface. m/b flat areas: install #28 basesheeet apply modified bitumen torch down as final surface. all flashings will be replaced. | $19,850 |
| May 19, 2026 | Completed final sign-off Jun 2026 | 259 Cayuga Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| May 19, 2026 | Completed final sign-off May 2026 | 1534 09th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| May 19, 2026 | Completed final sign-off Jun 2026 | 3812 Divisadero St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,500 |
| May 14, 2026 | Completed final sign-off May 2026 | 2918 Van Ness Av | to obtain final inspection for work approved under pa# 202304145749. all work is completeDetails
to obtain final inspection for work approved under pa# 202304145749. all work is complete | |
| May 13, 2026 | Completed final sign-off Jun 2026 | 225 Fell St | reroofing hot worksDetails
reroofing hot works | $63,950 |
| May 7, 2026 | Completed final sign-off May 2026 | 416 31st Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,850 |
| Apr 18, 2026 | Completed final sign-off May 2026 | 31 Malta Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,850 |
| Mar 31, 2026 | Completed final sign-off Apr 2026 | 1630 Plymouth Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $28,357 |
| Mar 10, 2026 | Completed final sign-off Mar 2026 | 1255 Page St | re-roofing: tear off existing t/g roof approx 4,200 sq ft & clean up, install #28 base sheet nail down as the new underlayment. apply modified bitumen torch down sta smoot type. apply modified bitumen torch down gta granule type as final surface, replace all fashings.Details
re-roofing: tear off existing t/g roof approx 4,200 sq ft & clean up, install #28 base sheet nail down as the new underlayment. apply modified bitumen torch down sta smoot type. apply modified bitumen torch down gta granule type as final surface, replace all fashings. | $65,850 |
| Dec 1, 2025 | Completed final sign-off Dec 2025 | 55 Tioga Av | reroofing with torch downDetails
reroofing with torch down | $11,850 |
| Sep 8, 2025 | Completed final sign-off Sep 2025 | 150 San Benito Wy | re-roofing: tear off the existing old roofing materials approximately 2,350 sq/ft, install #30 base sheet nailed down as new underlayment, install new composite shingles nailed down as final surface, all flashings will be replaced new. no hot work.Details
re-roofing: tear off the existing old roofing materials approximately 2,350 sq/ft, install #30 base sheet nailed down as new underlayment, install new composite shingles nailed down as final surface, all flashings will be replaced new. no hot work. | $32,850 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 406 Clement St | re-roofing: tear off the existing old flatmain roofing materials approximately 4,000 sq/ft, apply #28 base sheet, nailed down as new underlayment. install new modified bitumen roofing materials granule type surface by torching as final roof surface (hot tarwork). all flashings will be replaced new.Details
re-roofing: tear off the existing old flatmain roofing materials approximately 4,000 sq/ft, apply #28 base sheet, nailed down as new underlayment. install new modified bitumen roofing materials granule type surface by torching as final roof surface (hot tarwork). all flashings will be replaced new. | $52,850 |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 2484 Mission St | reroof. torch downDetails
reroof. torch down | $35,850 |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 1728 Sacramento St | reroof. torch downDetails
reroof. torch down | $57,850 |
| Aug 13, 2025 | In progress issued Aug 2025 | 326 Funston Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,000 |
| Aug 4, 2025 | Completed final sign-off Aug 2025 | 175 Miraloma Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,750 |
| Aug 4, 2025 | Completed final sign-off Aug 2025 | 780 02nd Av | re-roofing with hot works.Details
re-roofing with hot works. | $17,850 |
| Jul 29, 2025 | Completed final sign-off Sep 2025 | 2110 Castro St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,700 |
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 53 Colonial Wy | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,000 |
| Jul 9, 2025 | Completed final sign-off Aug 2025 | 139 08th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,850 |
| Jul 8, 2025 | In progress issued Jul 2025 | 35 Allison St | tear off main roof , back lower roof +/- 200 sq ft and back storage roof +/- 300 sq ft. install #28 base sheet nail down as new underlayment. apply modified bitumen, torch down as final surface. all flashings will be replaced new. hot work.Details
tear off main roof , back lower roof +/- 200 sq ft and back storage roof +/- 300 sq ft. install #28 base sheet nail down as new underlayment. apply modified bitumen, torch down as final surface. all flashings will be replaced new. hot work. | $8,500 |
| Jul 3, 2025 | In progress issued Jul 2025 | 1468 La Playa | re-roofing w/ hot works.Details
re-roofing w/ hot works. | $23,000 |
| Jun 12, 2025 | Completed final sign-off Jul 2025 | 839 Broderick St | reroofing (hot works) tear off existing old roof 3000 sq ft and cleanup. install #28 base sheet nail down as new underlayment. apply modified bitumen torch down as final surface. all flashing will be replaced new.Details
reroofing (hot works) tear off existing old roof 3000 sq ft and cleanup. install #28 base sheet nail down as new underlayment. apply modified bitumen torch down as final surface. all flashing will be replaced new. | $43,850 |
| May 12, 2025 | Completed final sign-off Jun 2025 | 3351 Clay St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $36,850 |
| May 8, 2025 | Completed final sign-off Jun 2025 | 396 Lombard St | reroofing with hot works.Details
reroofing with hot works. | $33,850 |
| May 8, 2025 | Completed final sign-off Jun 2025 | 1806 Grant Av | reroofing with hot works. (front bldg only)Details
reroofing with hot works. (front bldg only) | $8,750 |
| Apr 14, 2025 | Completed final sign-off Jul 2025 | 1128 Bowdoin St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,850 |
| Apr 14, 2025 | Completed final sign-off Apr 2025 | 2155 Polk St | to obtain final inspection for work approved under pa#: 201710171443. all work is complete.Details
to obtain final inspection for work approved under pa#: 201710171443. all work is complete. | |
| Apr 10, 2025 | Completed final sign-off Apr 2025 | 1640 46th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 2320 Broadway | re-roofing no hot works.Details
re-roofing no hot works. | $67,850 |
| Feb 7, 2025 | Completed final sign-off Feb 2025 | 9 Aztec St | to obtain final inspection for work approved under pa# 201310048456. all work is completeDetails
to obtain final inspection for work approved under pa# 201310048456. all work is complete | $3,600 |
| Jan 27, 2025 | Completed final sign-off Mar 2025 | 444 03rd Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $45,150 |
| Jan 10, 2025 | Completed final sign-off Jan 2025 | 2275 Chestnut St | reroofing (w/ torch)Details
reroofing (w/ torch) | $15,350 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 329 23rd Av | re-roofing. no hot works.Details
re-roofing. no hot works. | $22,050 |
| Dec 3, 2024 | Completed final sign-off Jan 2025 | 198 Carl St | reroofing. (no hot tar)Details
reroofing. (no hot tar) | $6,380 |
| Oct 9, 2024 | Completed final sign-off Feb 2025 | 2075 Market St | reroof (torch down)Details
reroof (torch down) | $20,850 |
| Sep 25, 2024 | Completed final sign-off Jan 2025 | 4728 Balboa St | reroofing, modified bitumen, gravel covering.Details
reroofing, modified bitumen, gravel covering. | $12,250 |
| Sep 12, 2024 | Completed final sign-off Oct 2024 | 191 Robinhood Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,850 |
| Aug 30, 2024 | Completed final sign-off Oct 2024 | 1549 11th Av | re-roofingDetails
re-roofing | $23,850 |
| Aug 30, 2024 | In progress issued Aug 2024 | 959 Noe St | re-roofingDetails
re-roofing | $15,850 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 460 Melrose Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,850 |
| Aug 6, 2024 | Completed final sign-off Feb 2025 | 815 Goettingen St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,850 |
| Aug 6, 2024 | Completed final sign-off Feb 2025 | 53 Cora St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,650 |
| Aug 6, 2024 | Expired or cancelled expired Jul 2026 | 443 Harvard St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,850 |
| Jul 16, 2024 | In progress issued Jul 2024 | 2006 Powell St | reroofingDetails
reroofing | $14,650 |
| Jun 14, 2024 | Completed final sign-off Jun 2025 | 350 Union St | reroofingDetails
reroofing | $181,350 |
| Jun 14, 2024 | Completed final sign-off Jul 2025 | 530 Stockton St | reroofingDetails
reroofing | $88,850 |
| Jun 11, 2024 | Completed final sign-off Feb 2025 | 645 Cayuga Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,900 |
| May 20, 2024 | Completed final sign-off May 2024 | 51 Tioga Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,850 |
| May 16, 2024 | Completed final sign-off Jul 2024 | 75 Cook St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $42,850 |
| May 7, 2024 | Completed final sign-off May 2024 | 503 Cortland Av | reroofingDetails
reroofing | $35,250 |
| May 2, 2024 | Completed final sign-off May 2024 | 288 Connecticut St | reroofingDetails
reroofing | $27,000 |
| Apr 17, 2024 | Completed final sign-off Feb 2025 | 4320 California St | reroofingDetails
reroofing | $26,850 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 1055 Ellis St | reroofingDetails
reroofing | $19,415 |
| Mar 7, 2024 | Completed final sign-off Apr 2024 | 1736 Bryant St | reroofing install new composit shinglesDetails
reroofing install new composit shingles | $29,950 |
| Mar 6, 2024 | Completed final sign-off May 2024 | 65 Tucker Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,850 |
| Mar 4, 2024 | Completed final sign-off Apr 2024 | 1725 Taylor St | reroofingDetails
reroofing | $49,700 |
| Jan 2, 2024 | Completed final sign-off Apr 2024 | 315 Brazil Av | reroofingDetails
reroofing | $19,850 |
| Jan 2, 2024 | Completed final sign-off Jan 2024 | 1539 Kirkwood Av | reroofingDetails
reroofing | $16,850 |
| Nov 30, 2023 | Completed final sign-off Apr 2024 | 1323 11th Av | reroofingDetails
reroofing | $41,250 |
| Nov 6, 2023 | In progress issued Nov 2023 | 1720 Sacramento St | reroofing.Details
reroofing. | $29,850 |
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 1541 Kirkwood Av | to: obtain final inspection for work approved under pa# 202106071743. all work is completeDetails
to: obtain final inspection for work approved under pa# 202106071743. all work is complete | |
| Oct 24, 2023 | Completed final sign-off Dec 2023 | 1526 Kirkwood Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,850 |
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 3614 Taraval St | reroofingDetails
reroofing | $13,850 |
| Oct 5, 2023 | Completed final sign-off Nov 2023 | 2240 Pacific Av | reroofingDetails
reroofing | $63,850 |
| Sep 27, 2023 | Completed final sign-off Oct 2023 | 4381 17th St | reroofingDetails
reroofing | $13,850 |
| Sep 6, 2023 | Completed final sign-off Oct 2023 | 70 El Sereno Ct | reroofingDetails
reroofing | $24,000 |
| Sep 6, 2023 | Completed final sign-off Sep 2023 | 2355 Greenwich St | reroofingDetails
reroofing | $15,850 |
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 2355 Union St | reroofingDetails
reroofing | $34,850 |
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 1731 Chestnut St | reroofingDetails
reroofing | $37,850 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 264 Anzavista Av | re-roofingDetails
re-roofing | $10,850 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 3100 California St | re-roofing.Details
re-roofing. | $35,850 |
| Jul 13, 2023 | Completed final sign-off Feb 2025 | 139 Sutro Heights Av | re-roofingDetails
re-roofing | $12,200 |
| Jul 13, 2023 | Completed final sign-off Jul 2023 | 4100 Fulton St | re-roofingDetails
re-roofing | $82,507 |
| Jun 21, 2023 | Never finaled issued Jun 2023, no final | 168 Maddux Av | reroofing.Details
reroofing. | $15,000 |
| Jun 21, 2023 | Never finaled issued Jun 2023, no final | 642 Ashbury St | reroofing.Details
reroofing. | $22,850 |
| Jun 14, 2023 | Completed final sign-off Jul 2023 | 336 San Benito Wy | reroofingDetails
reroofing | $25,850 |
| Jun 14, 2023 | Never finaled issued Jun 2023, no final | 2079 31st Av | reroofingDetails
reroofing | $13,850 |
| May 18, 2023 | Never finaled issued May 2023, no final | 1055 Valencia St | reroofingDetails
reroofing | $29,850 |
| May 9, 2023 | Never finaled issued May 2023, no final | 676 Greenwich St | reroofingDetails
reroofing | $51,850 |
| May 9, 2023 | Never finaled issued May 2023, no final | 800 Huron Av | reroofingDetails
reroofing | $16,850 |
| Apr 14, 2023 | Never finaled issued Apr 2023, no final | 2918 Van Ness Av | reroofingDetails
reroofing | $32,850 |
| Mar 31, 2023 | Never finaled issued Mar 2023, no final | 737 Webster St | reroofingDetails
reroofing | $26,650 |
| Mar 31, 2023 | Never finaled issued Mar 2023, no final | 2659 37th Av | reroofingDetails
reroofing | $15,850 |
| Mar 6, 2023 | Completed final sign-off Mar 2023 | 715 Brazil Av | reroofingDetails
reroofing | $13,850 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 418 Nevada St | reroofingDetails
reroofing | $10,850 |
| Dec 12, 2022 | Never finaled issued Dec 2022, no final | 1123 Hampshire St | reroofingDetails
reroofing | $29,300 |
| Nov 2, 2022 | Completed final sign-off Dec 2022 | 431 Walnut St | reroofingDetails
reroofing | $42,850 |
| Oct 19, 2022 | Completed final sign-off Dec 2022 | 1160 Revere Av | reroofingDetails
reroofing | $21,600 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 905 Russia Av | re-roofingDetails
re-roofing | $13,600 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 22 Skyview Wy | re-roofingDetails
re-roofing | $12,850 |
| Sep 9, 2022 | Completed final sign-off Dec 2022 | 230 Dolores St | reroofing.Details
reroofing. | $210,850 |
| Sep 9, 2022 | Never finaled issued Sep 2022, no final | 230 Murray St | reroofingDetails
reroofing | $11,650 |
| Aug 16, 2022 | Never finaled issued Aug 2022, no final | 2160 Leavenworth St | reroofingDetails
reroofing | $33,000 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 2 Toledo Wy | reroofingDetails
reroofing | $43,850 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 796 23rd Av | reroofingDetails
reroofing | $22,850 |
| Jul 22, 2022 | Never finaled issued Jul 2022, no final | 1999 Green St | reroofingDetails
reroofing | $24,850 |
| Jul 22, 2022 | Never finaled issued Jul 2022, no final | 2255 North Point St | reroofingDetails
reroofing | $50,350 |