- 8 permits filed
42 permits since 2000: 33 completed, 5 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 2922 Irving St | remove and install 700 sqft of interior drywall (less than 50%).Details
remove and install 700 sqft of interior drywall (less than 50%). | $5,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 1642 31st Av | revision to pa# 202604300368. relocate (n) bath & (n) bar at 1st floor. relocate washer & dryer to garage. revise detail 4,5 on sheet s2.2 per site. reduce media room size for (n) wine cellar constructionDetails
revision to pa# 202604300368. relocate (n) bath & (n) bar at 1st floor. relocate washer & dryer to garage. revise detail 4,5 on sheet s2.2 per site. reduce media room size for (n) wine cellar construction | $10,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 1642 31st Av | add (n) deck 171 sqft at 2nd floor. revision to bpa: 202604300368Details
add (n) deck 171 sqft at 2nd floor. revision to bpa: 202604300368 | $20,000 |
| Apr 30, 2026 | In progress issued May 2026 | 1642 31st Av | partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heaterDetails
partially convert garage to 2 bedrms, 2 baths, (n) media; relocate (e) stairway from 1st to 2nd fl; kitchen remodel; upgrade elecrical panel to 200 amp; add (n) radiant floor heating; relocate washer, dryer & water heater | $2,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 1642 31st Av | 2/f: drywall in living rm, dining rm, bedroom and install (n) 5/8"xgyp. no wall to be demo/remove layout remain unchanged.Details
2/f: drywall in living rm, dining rm, bedroom and install (n) 5/8"xgyp. no wall to be demo/remove layout remain unchanged. | $6,000 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 685 25th Av | kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house.Details
kitchen remodel: replace kitchen cabinets and countertop. upgrade electrical wiring for the whole house. (2) bathroom remodel: replace tiles and plumbing fixtures for bathrooms. (11) window replacement; like for like - at back of house. | $55,000 |
| Jul 14, 2025 | Completed final sign-off Dec 2025 | 1750 42nd Av | remodel 2 baths in kind - replace plumbing fixture & floor tile. upgrade electrical panel and wires at select locations - minor wall/ceiling drywall removal. no change to floor layout. no change to wall layout. no structural work. all replacement gypboard at walls and ceilings to be 5/8" type x. maiDetails
remodel 2 baths in kind - replace plumbing fixture & floor tile. upgrade electrical panel and wires at select locations - minor wall/ceiling drywall removal. no change to floor layout. no change to wall layout. no structural work. all replacement gypboard at walls and ceilings to be 5/8" type x. mai | $2,600 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 466 Liberty St | bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural.Details
bathroom and kitchen remodel. replace kitchen cabinets and acountertop, non structural. remodel 2 full bath and 1 powder room, non structural. | $38,000 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 3527 Sacramento St | kitchen remodel in kind - replace kitchen cabinets and countertop. no structural work. no change to floor layout. no change to wall layout.Details
kitchen remodel in kind - replace kitchen cabinets and countertop. no structural work. no change to floor layout. no change to wall layout. | $12,000 |
| Jun 17, 2024 | Completed final sign-off Sep 2024 | 650 Lake St | bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11.Details
bathroom remodel for unit# 7 and #11. replace bathtub with shower pan and replace tile. replace kitchen cabinets and countertop only for unit# 11. | $26,500 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 304 Brazil Av | remove existing 2 front windows and replace with wood aluminum clad windows in the existing openings. single/double hung operation.Details
remove existing 2 front windows and replace with wood aluminum clad windows in the existing openings. single/double hung operation. | $3,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 304 Brazil Av | replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpanDetails
replace kitchen cabinets and countertop. upgrade electrical outlets and add 8 recess lights in kitchen. no other work in kitchen. bathroom remodel, replace bathtub with showerpan | $20,000 |
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 2191 32nd Av | one bathroom and one powder room remodel. non structuralDetails
one bathroom and one powder room remodel. non structural | $12,000 |
| Jul 21, 2023 | Completed final sign-off Jan 2024 | 66 Cleary Ct | replace kitchen cabinets and countertops. install vinyl floor.no layout changeDetails
replace kitchen cabinets and countertops. install vinyl floor.no layout change | $12,000 |
| Apr 13, 2023 | Completed final sign-off Aug 2023 | 650 Lake St | remove stucco and replace stucco like for like. one side of bldg. approx 600sfDetails
remove stucco and replace stucco like for like. one side of bldg. approx 600sf | $8,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 218 Marietta Dr | replace kitchen cabinets and countertops. no new appliances. non structural.Details
replace kitchen cabinets and countertops. no new appliances. non structural. | $10,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2023 | 17 Hattie St | one kitchen remodel kitchen cabinets, countertops and appliances replacementDetails
one kitchen remodel kitchen cabinets, countertops and appliances replacement | $15,000 |
| Mar 7, 2022 | Completed final sign-off Mar 2022 | 4732 17th St | replace cabinets and countertop for kitchen at basement. no walls modified/moved for kitchen remodel.Details
replace cabinets and countertop for kitchen at basement. no walls modified/moved for kitchen remodel. | $5,000 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 4732 17th St | replace cabinets & counter top for kitchen in basement. no moving walls at remodel.Details
replace cabinets & counter top for kitchen in basement. no moving walls at remodel. | $10,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 1817 California St | replace cabinets only for kitchen and 2 bathrooms.Details
replace cabinets only for kitchen and 2 bathrooms. | $15,000 |
| Feb 18, 2021 | Completed final sign-off Mar 2021 | 215 Arguello Bl | like-kind kitchen remodelDetails
like-kind kitchen remodel | $17,058 |
| Dec 31, 2020 | Completed final sign-off Aug 2023 | 2300 Cesar Chavez St | to address city mandate for accessibility entrance, an ada enclosed 90 degree adjacent vertical platform. a designated ada parking area will be clearly noted with stripping and signage. the building does have sprinkler system in place.Details
to address city mandate for accessibility entrance, an ada enclosed 90 degree adjacent vertical platform. a designated ada parking area will be clearly noted with stripping and signage. the building does have sprinkler system in place. | $10,000 |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 135 Beverly St | kittchen remodel and add an electrical subpanelDetails
kittchen remodel and add an electrical subpanel | $12,500 |
| Jul 20, 2020 | Completed final sign-off Sep 2020 | 1495 Masonic Av | replace kitchen cabinets, countertops, tiles, sink, faucet, range, ventilation. moving gas valve a few inches to sit inside a cabinet.Details
replace kitchen cabinets, countertops, tiles, sink, faucet, range, ventilation. moving gas valve a few inches to sit inside a cabinet. | $15,440 |
| May 27, 2020 | Completed final sign-off Jun 2020 | 717 Corbett Av | replace kitchen countertop in knidDetails
replace kitchen countertop in knid | $10,000 |
| Oct 30, 2019 | Completed final sign-off Jan 2020 | 650 Lake St | supply & install 17 iwc aluminum windows & 16 iwc aluminum doors to match (e) design, double-pane, same size and same locationDetails
supply & install 17 iwc aluminum windows & 16 iwc aluminum doors to match (e) design, double-pane, same size and same location | $105,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 650 Lake St | unit #4 only, remove and replace three sliding doors and four windows in kind, in same openings. repair stucco around windows/doors only as needed. new windows and doors to be aluminum, as are existing and is appropriate for 1960s building.Details
unit #4 only, remove and replace three sliding doors and four windows in kind, in same openings. repair stucco around windows/doors only as needed. new windows and doors to be aluminum, as are existing and is appropriate for 1960s building. | $18,500 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 3730 Webster St | bathroom remodel - relocate sink, shower. replace all tile, replace bathtub, shower door, vanity cabinet, replace fan, add 8 recess lights and 5 wall mount lightsDetails
bathroom remodel - relocate sink, shower. replace all tile, replace bathtub, shower door, vanity cabinet, replace fan, add 8 recess lights and 5 wall mount lights | $9,500 |
| Mar 13, 2013 | Completed final sign-off May 2013 | 3410 Judah St | revision for pa# 201211264839. install two 3'x3' shower stall.Details
revision for pa# 201211264839. install two 3'x3' shower stall. | $1,200 |
| Mar 4, 2013 | Completed final sign-off Mar 2013 | 1290 Rhode Island St | bathroom remodel in unit # 21, change the fixtures in the bathroom , includes the toilet, shower and sink, the floor tiles & wall tiles will also be changed areas not covered by the tiles will be painted.Details
bathroom remodel in unit # 21, change the fixtures in the bathroom , includes the toilet, shower and sink, the floor tiles & wall tiles will also be changed areas not covered by the tiles will be painted. | $3,500 |
| Nov 26, 2012 | Completed final sign-off May 2013 | 3410 Judah St | t.i for (e) massage establishment with 7 therapy rooms. relocate waiting/reception areas. employee/office, & therapy rms. construct & install new showers, new accessiblity compliance-install accessible shower & reception counter. remove (e) stream & shower room & construct new acsblyDetails
t.i for (e) massage establishment with 7 therapy rooms. relocate waiting/reception areas. employee/office, & therapy rms. construct & install new showers, new accessiblity compliance-install accessible shower & reception counter. remove (e) stream & shower room & construct new acsbly | $20,000 |
| Aug 22, 2012 | Completed final sign-off Nov 2012 | 1998 Broadway | replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity topsDetails
replace kitchen cabinets, replace tiles in both master & guest bathrooms. replace vanity cabinets & vanity tops | $9,000 |
| Nov 15, 2011 | Never finaled issued Nov 2011, no final | 650 Lake St | three (3) windoww and three (3) doors replacement at front with double pan alumunum frame. replace in kind glass sliding door. no change in egress and no structural work - u factor = 0.40 maxDetails
three (3) windoww and three (3) doors replacement at front with double pan alumunum frame. replace in kind glass sliding door. no change in egress and no structural work - u factor = 0.40 max | $5,600 |
| Feb 7, 2011 | Completed final sign-off Jun 2012 | 937 Dolores St | revision to existing issued pa#2010-1112-4872 to include removal existing first floor wood floor assembly above existing 9 inch heigh inaccessibly crawl space new strip footing & concrete slab on grade new headers.Details
revision to existing issued pa#2010-1112-4872 to include removal existing first floor wood floor assembly above existing 9 inch heigh inaccessibly crawl space new strip footing & concrete slab on grade new headers. | $12,750 |
| Nov 15, 2010 | Completed final sign-off Nov 2010 | 685 25th Av | supply and install (6) windows (iwc white wood) in front. to comply with nov 201069166. u=.40 or less.Details
supply and install (6) windows (iwc white wood) in front. to comply with nov 201069166. u=.40 or less. | $1,800 |
| Nov 12, 2010 | Completed final sign-off Jun 2012 | 937 Dolores St | renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unitDetails
renovation to (e) seven dwelling unit apts include: replacement o fall ext. windows w/(n) insul units (in kind on facade). interior remodel of each unit including : reconfiguration of partitions within each unit, renovation of (e) bath & kitchen in each unit. addition of hardwired s/d' in each unit | $136,000 |
| May 4, 2010 | Completed final sign-off Jun 2010 | 650 Lake St | 6 windows replacement at front with double pan aluminum frame.Details
6 windows replacement at front with double pan aluminum frame. | $3,000 |
| Oct 20, 2009 | Completed final sign-off Nov 2009 | 4197 17th St | revision to appl #200908255508: provide temporary shoring - replace washed isolated footing (total 3).Details
revision to appl #200908255508: provide temporary shoring - replace washed isolated footing (total 3). | $3,000 |
| Aug 25, 2009 | Completed final sign-off Jan 2010 | 4187 17th St | repair water damaged exterior side walls ( wood siding and stucco) not visible from street. repair 2 level decks and stairs ( exterior on side of building. replace slab at garage/basement. retrofit grider and post above garage /basement.Details
repair water damaged exterior side walls ( wood siding and stucco) not visible from street. repair 2 level decks and stairs ( exterior on side of building. replace slab at garage/basement. retrofit grider and post above garage /basement. | $182,875 |
| May 19, 2008 | Completed final sign-off Sep 2008 | 650 Lake St | 10 window replacementDetails
10 window replacement | $8,500 |
| May 16, 2005 | Completed final sign-off Nov 2005 | 1482 18th Av | add ceiling fan in bathroom & replace window in bathroom in kind (reference app 200504129869)Details
add ceiling fan in bathroom & replace window in bathroom in kind (reference app 200504129869) | $1,250 |
| Apr 12, 2005 | Completed final sign-off Jun 2005 | 1482 18th Av | replace cabinets & counter top.Details