- 1 permit filed
63 permits since 2000: 51 completed, 2 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 2001 Ocean Av | to comply with nov: 202654718 - convert laundry to kitchenette with hood, 2burners stove (no oven) sink, refgrigerator and cabinets. relocate washer, dryer, sink to garage on ground floor.Details
to comply with nov: 202654718 - convert laundry to kitchenette with hood, 2burners stove (no oven) sink, refgrigerator and cabinets. relocate washer, dryer, sink to garage on ground floor. | $2,500 |
| Oct 4, 2024 | Completed final sign-off Oct 2024 | 67 Inverness Dr | rev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear.Details
rev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear. | |
| Jun 12, 2024 | Completed final sign-off Jul 2024 | 337 Noe St | replacing siding in kind ~500 sqft. left side of building frontageDetails
replacing siding in kind ~500 sqft. left side of building frontage | $10,000 |
| May 13, 2024 | Completed final sign-off Aug 2024 | 1718 27th Av | replace backyard siding 20 x 25Details
replace backyard siding 20 x 25 | $1,800 |
| May 13, 2024 | Completed final sign-off Jul 2024 | 4763 19th St | interior remodel - kitchen remodel on 2/f. add one half bathroom on 2/f and add one bathroom on 3/f. no exterior change.Details
interior remodel - kitchen remodel on 2/f. add one half bathroom on 2/f and add one bathroom on 3/f. no exterior change. | $20,000 |
| Mar 15, 2024 | In progress issued Mar 2024 | 4200 Moraga St | relocate existing furnace and revise duct layout. ref pm20240205176. min. efficiency 81%.Details
relocate existing furnace and revise duct layout. ref pm20240205176. min. efficiency 81%. | $1,500 |
| Mar 12, 2024 | Completed final sign-off Apr 2024 | 232 Point Lobos Av | remove extg partition wall at ground floor.Details
remove extg partition wall at ground floor. | $2,000 |
| Feb 12, 2024 | In progress issued Feb 2024 | 60 Clipper Cove Wy | revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinksDetails
revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinks | |
| Feb 5, 2024 | Completed final sign-off May 2024 | 4200 Moraga St | remodel (1) e. kitchen, (1) e. bathroom & e. half bathroom. replace in-kind. kitchen: replace cabinets, countertops, and appliances. bathroom: replace tiles, fixtures, and tub. half bathroom: replace tiles and fixtures.Details
remodel (1) e. kitchen, (1) e. bathroom & e. half bathroom. replace in-kind. kitchen: replace cabinets, countertops, and appliances. bathroom: replace tiles, fixtures, and tub. half bathroom: replace tiles and fixtures. | $18,500 |
| Dec 29, 2023 | Completed final sign-off Apr 2024 | 3226 Geary Bl | to comply with compliant #202317238 in kind replacement of (e) extractor fan unit connected to type i hood. approved pa#: 377246/1. also comply with eid: 202317489. like for like w/isolation dapeners.Details
to comply with compliant #202317238 in kind replacement of (e) extractor fan unit connected to type i hood. approved pa#: 377246/1. also comply with eid: 202317489. like for like w/isolation dapeners. | $2,000 |
| Dec 27, 2023 | Completed final sign-off Jan 2024 | 1712 La Salle Av | to obtain final inspection for work approved under 201909121402 and 202001212309. all work is complete.Details
to obtain final inspection for work approved under 201909121402 and 202001212309. all work is complete. | |
| Dec 26, 2023 | Completed final sign-off Mar 2024 | 250 West Portal Av | relocate cashier table & replace (e) fryer/burner w/ new in same location in-kind.Details
relocate cashier table & replace (e) fryer/burner w/ new in same location in-kind. | $20,000 |
| Nov 3, 2023 | Completed final sign-off Apr 2024 | 1838 Irving St | revision to 202306099689 and 201912311119, voluntary installation of (n) footings at property frontageDetails
revision to 202306099689 and 201912311119, voluntary installation of (n) footings at property frontage | $15,000 |
| Aug 23, 2023 | Completed final sign-off Apr 2024 | 1838 Irving St | reference to pa# 201912311119 & pa# 202306099689. exterior front remodel from tile to wood, (e) stucco repair.Details
reference to pa# 201912311119 & pa# 202306099689. exterior front remodel from tile to wood, (e) stucco repair. | $12,000 |
| Jul 18, 2023 | Completed final sign-off Nov 2023 | 263 Sadowa St | construct new wall between hallway/(e) storage & install kitchentte at g/f.Details
construct new wall between hallway/(e) storage & install kitchentte at g/f. | $15,000 |
| Jun 20, 2023 | Completed final sign-off Dec 2023 | 160 Delta St | replace front siding and paint. approx 50sf all work in kindDetails
replace front siding and paint. approx 50sf all work in kind | $1,000 |
| Jun 20, 2023 | Completed final sign-off Jun 2024 | 1209 37th Av | replace backyard (e) wood siding with hardie plank siding. approx 500 sfDetails
replace backyard (e) wood siding with hardie plank siding. approx 500 sf | $3,000 |
| Jun 16, 2023 | Expired or cancelled cancelled Dec 2023 | 1737 Post St | #368 tenant improvement for remodel (e) cafe to boba tea restaurant (no change of use)Details
#368 tenant improvement for remodel (e) cafe to boba tea restaurant (no change of use) | $16,900 |
| Jun 9, 2023 | Completed final sign-off Apr 2024 | 1838 Irving St | construction revision on 20191231119, new floor layout for kitchen and dinning area. new ada restroomDetails
construction revision on 20191231119, new floor layout for kitchen and dinning area. new ada restroom | |
| Jun 5, 2023 | Completed final sign-off Mar 2024 | 1639 Polk St | establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain.Details
establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain. | $100,000 |
| Apr 24, 2023 | Completed final sign-off Jan 2024 | 1712 La Salle Av | convert (e) deck to bedroom, additional approx. 95 sf. convert space below (e) deck to office, additional approx. 120 sf.Details
convert (e) deck to bedroom, additional approx. 95 sf. convert space below (e) deck to office, additional approx. 120 sf. | $35,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 534 11th Av | revision to pa# 201512316234, 1st flr and 2nd flr layout (interior only), other details no change, shall be follow previous approved plans.Details
revision to pa# 201512316234, 1st flr and 2nd flr layout (interior only), other details no change, shall be follow previous approved plans. | |
| Feb 28, 2023 | Never finaled issued Oct 2023, no final | 60 Clipper Cove Wy | new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit)Details
new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit) | $80,000 |
| Dec 21, 2022 | Completed final sign-off Feb 2023 | 300 Somerset St | (6) window replacements: (e) on eastside and northside. all street facing. wood hung to wood hungDetails
(6) window replacements: (e) on eastside and northside. all street facing. wood hung to wood hung | $5,500 |
| Dec 20, 2022 | Never finaled issued Jan 2023, no final | 2032 Polk St | ref- complaint# 202293573: repair existing damage non- bearing wall and ceilingDetails
ref- complaint# 202293573: repair existing damage non- bearing wall and ceiling | $2,000 |
| Dec 2, 2022 | Completed final sign-off Sep 2023 | 60 Clipper Cove Wy | new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment.Details
new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment. | $50,000 |
| Jun 28, 2022 | Completed final sign-off Oct 2024 | 67 Inverness Dr | remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl.Details
remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl. | $150,000 |
| Apr 28, 2022 | Completed final sign-off Jul 2022 | 406 Girard St | remodel 2 bathrooms in kind. no str. work.Details
remodel 2 bathrooms in kind. no str. work. | $27,800 |
| Mar 23, 2022 | Completed final sign-off May 2023 | 1519 22nd Av | structural revision to pa 201807124417. sister new joists above garage area. new footing at tradesmanDetails
structural revision to pa 201807124417. sister new joists above garage area. new footing at tradesman | |
| Mar 14, 2022 | Completed final sign-off May 2024 | 577 37th Av | addition of one adu unit at the first floor under the state adu program.Details
addition of one adu unit at the first floor under the state adu program. | $50,000 |
| Oct 5, 2021 | Completed final sign-off Nov 2023 | 206 Leland Av | a.d.u. (unit d) per ordinance 162-16 on 1st floor 1st floor 1) add two bedrooms, one kitchen and living/dining room; 2) relocate w.h. and w & d.Details
a.d.u. (unit d) per ordinance 162-16 on 1st floor 1st floor 1) add two bedrooms, one kitchen and living/dining room; 2) relocate w.h. and w & d. | $50,000 |
| Sep 29, 2021 | Completed final sign-off Sep 2022 | 1809 26th Av | replace back wall (e) siding with james hardie siding. 500 sq ft.Details
replace back wall (e) siding with james hardie siding. 500 sq ft. | $2,500 |
| Aug 11, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | foundation repair / replacement. no changes to floor layoutDetails
foundation repair / replacement. no changes to floor layout | $40,000 |
| May 11, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | 1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structuralDetails
1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structural | $50,000 |
| Apr 21, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | remodel 3 bathrooms on 2/f & 1 kitchen.Details
remodel 3 bathrooms on 2/f & 1 kitchen. | $30,000 |
| Dec 15, 2020 | Completed final sign-off Jan 2021 | 1567 33rd Av | replace 6 windows in the back and replace backwall (e) siding with hardie siding (625 sqft)Details
replace 6 windows in the back and replace backwall (e) siding with hardie siding (625 sqft) | $3,000 |
| Dec 15, 2020 | Completed final sign-off Oct 2022 | 1807 26th Av | to comply with physical inspection report #cc-8447Details
to comply with physical inspection report #cc-8447 | $2,000 |
| Jan 2, 2020 | Completed final sign-off Aug 2020 | 267 Holyoke St | 1) demolish 2nd fl dry wall 2) install insulation 3) install drywall. ref application 2019-1226-0727Details
1) demolish 2nd fl dry wall 2) install insulation 3) install drywall. ref application 2019-1226-0727 | $5,000 |
| Dec 26, 2019 | Completed final sign-off Aug 2020 | 267 Holyoke St | remodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows.Details
remodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows. | $15,000 |
| Oct 28, 2019 | Completed final sign-off Mar 2021 | 1846 38th Av | remodel bath, add full bath on d 2nd fl, add bedroom, family room, full bath, storage on 1st fl. replace water heater, furnace upgrade elec and plumbing systemDetails
remodel bath, add full bath on d 2nd fl, add bedroom, family room, full bath, storage on 1st fl. replace water heater, furnace upgrade elec and plumbing system | $100,000 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 251 Minerva St | to comply with nov 201983031, 201920412, 201920411 and 201919561 - 1st fl - legalize 1 bedrrm and full bath. new windows @ front in-kind with aluminum cladDetails
to comply with nov 201983031, 201920412, 201920411 and 201919561 - 1st fl - legalize 1 bedrrm and full bath. new windows @ front in-kind with aluminum clad | $20,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 577 37th Av | 1)remodel 2 extg bathrooms, change extg closet to be laundry closet. change extg kitchen to be new bedroom. change extg dining to be new kitchen at 3rd floor. 2)remodel 2 extg bathrooms and change extg closet to be laundry closet at 2nd floor. 3)install new lighting fixtures at 2nd and 3rd floor.Details
1)remodel 2 extg bathrooms, change extg closet to be laundry closet. change extg kitchen to be new bedroom. change extg dining to be new kitchen at 3rd floor. 2)remodel 2 extg bathrooms and change extg closet to be laundry closet at 2nd floor. 3)install new lighting fixtures at 2nd and 3rd floor. | $82,000 |
| Aug 27, 2019 | Expired or cancelled expired Mar 2025 | 714 Monterey Bl | to obtain final inspection for work approved under pa#201303252940 (convert (e) vacant full service bar into an art studio; convert (e) toilet to accessible toilet.). all work is complete.Details
to obtain final inspection for work approved under pa#201303252940 (convert (e) vacant full service bar into an art studio; convert (e) toilet to accessible toilet.). all work is complete. | |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 2183 Mission St | amend 201709077211 relocating tenant space doorway no cost revisionDetails
amend 201709077211 relocating tenant space doorway no cost revision | |
| Jul 18, 2019 | Completed final sign-off Nov 2019 | 716 Monterey Bl | remodel ada bath. new lounge and store officeDetails
remodel ada bath. new lounge and store office | $20,000 |
| Jun 3, 2019 | Completed final sign-off May 2021 | 2243 31st Av | legalize bedroom & family room, add a full bath, replace foundation at 1st flr. replace rear windows w/ vinyl windows. replace water heater, furnace, upgrade electrical & plumbing system.Details
legalize bedroom & family room, add a full bath, replace foundation at 1st flr. replace rear windows w/ vinyl windows. replace water heater, furnace, upgrade electrical & plumbing system. | $50,000 |
| May 14, 2019 | Completed final sign-off Mar 2020 | 395 Joost Av | revision to pa 201905039741. 1st flr -reconfigure cantilever deck at rear. add glass guardrail.Details
revision to pa 201905039741. 1st flr -reconfigure cantilever deck at rear. add glass guardrail. | |
| May 7, 2019 | Never finaled issued May 2019, no final | 2183 Mission St | relocate 2 meters, 2 electrical panels to hallway as per plansDetails
relocate 2 meters, 2 electrical panels to hallway as per plans | |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 716 Monterey Bl | comply w/ n.o.v no. 201387963. remove covering above lightwell. add smoke alarms and relocate water heaterDetails
comply w/ n.o.v no. 201387963. remove covering above lightwell. add smoke alarms and relocate water heater | $500 |
| Mar 4, 2019 | Completed final sign-off Mar 2020 | 395 Joost Av | revision to app#201809069252. basement reconfigure layout per plans. 1st floor: relocate kitchen and dining. new cantilever deck and deck at rear.Details
revision to app#201809069252. basement reconfigure layout per plans. 1st floor: relocate kitchen and dining. new cantilever deck and deck at rear. | $20,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2018 | 1742 36th Av | add a 3-fixtuers bathroom on 2nd floor. in-fill light well and add skylight.Details
add a 3-fixtuers bathroom on 2nd floor. in-fill light well and add skylight. | $20,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2020 | 395 Joost Av | remodel e kitchen at gr fl. convert e bedroom to dining rm, remove e bth, laundry room convert back to garage at gr fl. remodel e 2 bedroom and 1 bath at 2nd fl. construct 1 bedroom, family rm, 1 full bath at basementDetails
remodel e kitchen at gr fl. convert e bedroom to dining rm, remove e bth, laundry room convert back to garage at gr fl. remodel e 2 bedroom and 1 bath at 2nd fl. construct 1 bedroom, family rm, 1 full bath at basement | $82,000 |
| Aug 21, 2018 | Completed final sign-off Feb 2023 | 300 Somerset St | comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg.Details
comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg. | $15,000 |
| Jul 12, 2018 | Completed final sign-off May 2023 | 1519 22nd Av | two story rear addition & raise 2nd fl roof to match adjacent neighbor. addition of dwelling unit on ground fl per ordiance no. 95-17 section 207(1)(6) & comply with info sht g-23. 1st fl (adu) add 1 bed,1 bath, 1 media, 1 living, kitchen & laundry. 2nd fl add 1 study and 1 bath, new deckDetails
two story rear addition & raise 2nd fl roof to match adjacent neighbor. addition of dwelling unit on ground fl per ordiance no. 95-17 section 207(1)(6) & comply with info sht g-23. 1st fl (adu) add 1 bed,1 bath, 1 media, 1 living, kitchen & laundry. 2nd fl add 1 study and 1 bath, new deck | $80,000 |
| Jun 26, 2018 | Completed final sign-off Sep 2018 | 1742 36th Av | add deck & stairs at rear of building per plan.Details
add deck & stairs at rear of building per plan. | $15,000 |
| Sep 7, 2017 | Completed final sign-off May 2021 | 2183 Mission St St | install accessible entries/ramps at entrances, provide new 1 hr fire rated passageway. install (n) accessible toilet room; install (n) handrails on (e) stairs; renovate (e) storefront to make accessible; both tenant space are vacant and will remain vacant until spaces have been leasedDetails
install accessible entries/ramps at entrances, provide new 1 hr fire rated passageway. install (n) accessible toilet room; install (n) handrails on (e) stairs; renovate (e) storefront to make accessible; both tenant space are vacant and will remain vacant until spaces have been leased | $100,000 |
| Sep 7, 2017 | Completed final sign-off Feb 2020 | 128 Venus St | horizontal addition and new/replaced deck in the rear. scope to include adding one additional dwelling unit to existing single home family pursuant to planning code section 207(c)(6)- 2 bedrooms, 1 kitchen, 1 bathroom. structural deferred under separate permit.Details
horizontal addition and new/replaced deck in the rear. scope to include adding one additional dwelling unit to existing single home family pursuant to planning code section 207(c)(6)- 2 bedrooms, 1 kitchen, 1 bathroom. structural deferred under separate permit. | $30,000 |
| May 19, 2017 | Completed final sign-off Dec 2017 | 122 Venus St | 1st floor: add 2 bedrooms and one full bath. 2nd floor: remodel kitchen and bath, and add 1 bedroom, 1 bath and deck at rear.Details
1st floor: add 2 bedrooms and one full bath. 2nd floor: remodel kitchen and bath, and add 1 bedroom, 1 bath and deck at rear. | $80,000 |
| Apr 19, 2017 | Completed final sign-off Sep 2017 | 171 Ledyard St | 1/f: add 2 bedrooms, 1 media room and 2 full bathrooms. 2/f: convert dining to bedroom.Details
1/f: add 2 bedrooms, 1 media room and 2 full bathrooms. 2/f: convert dining to bedroom. | $70,000 |
| Dec 8, 2016 | Completed final sign-off Dec 2017 | 123 Precita Av | to comply with complaint 201639701: repair (e) exterior staircase at rear of building in kind per planDetails
to comply with complaint 201639701: repair (e) exterior staircase at rear of building in kind per plan | $5,000 |
| Oct 24, 2016 | Never finaled issued Oct 2016, no final | 374 Valley St | demolition sheetrock for 2 rooms, insulated and put in back sheetrock.Details
demolition sheetrock for 2 rooms, insulated and put in back sheetrock. | $2,400 |
| Mar 25, 2016 | Completed final sign-off Jun 2016 | 52 Alvarado St | replace (e) rear stairs do not block exitsDetails
replace (e) rear stairs do not block exits | $15,000 |
| Dec 31, 2015 | Never finaled issued Dec 2019, no final | 534 11th Av | horizontal & vertical extension & interior renovation to a 3 stories + attic. single family bldg to become 4 stories 2 units residential dwelling.Details
horizontal & vertical extension & interior renovation to a 3 stories + attic. single family bldg to become 4 stories 2 units residential dwelling. | $200,000 |