Yes Construction
- Based in
- Pacifica
- On San Francisco permits
- Mar 2009 to Jul 2025
- Last 24 months
- 6 permits filed
49 permits since 2000: 40 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 1879 Oak St | unit 2: install 1 new bathroom fan. install 2 4" recessed lighting cans.Details
unit 2: install 1 new bathroom fan. install 2 4" recessed lighting cans. | $2,500 |
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 1879 Oak St | unit 4: install 1 new bathroom fan. install 2 recessed 4" lighting cans.Details
unit 4: install 1 new bathroom fan. install 2 recessed 4" lighting cans. | $2,500 |
| Jun 24, 2025 | In progress issued Jun 2025 | 998 Valencia St | mechanical permit: revision to pa#202304175888. modify hood exhaust, duct and blower location.Details
mechanical permit: revision to pa#202304175888. modify hood exhaust, duct and blower location. | $1,000 |
| May 13, 2025 | Completed final sign-off Jul 2025 | 695 03rd St | to obtain final inspection for work approved under pa # 202001162073. all work is complete.Details
to obtain final inspection for work approved under pa # 202001162073. all work is complete. | |
| Mar 20, 2025 | In progress issued Mar 2025 | 1799 Union St | g/f- exploratory demo for plumbing and dry rot investigation, remove 200sq ft in sheet rock and replace in kindDetails
g/f- exploratory demo for plumbing and dry rot investigation, remove 200sq ft in sheet rock and replace in kind | $200 |
| Dec 16, 2024 | Completed final sign-off May 2025 | 2550 Ocean Av | revision to pa#202406114242. change of occupancy from m-occupancy to b-vacational service business.Details
revision to pa#202406114242. change of occupancy from m-occupancy to b-vacational service business. | |
| Oct 4, 2024 | Completed final sign-off Apr 2025 | 2446 18th Av | to comply with complaint #201900991: to legalize infill storage area below (e) habitable space at rear at ground level.add kitchenette at ground floor.Details
to comply with complaint #201900991: to legalize infill storage area below (e) habitable space at rear at ground level.add kitchenette at ground floor. | $5,000 |
| Jun 11, 2024 | Completed final sign-off May 2025 | 2550 Ocean Av | (e) vacant retail tenant space at 2550 ocean ave. no change of use. all work limited to interior only. work involves upgrading toilet areas, crating new all gender bathrooms modify partitions for offices and storage within the space at 1st & 2nd levels. create new compliant stair and exit access.Details
(e) vacant retail tenant space at 2550 ocean ave. no change of use. all work limited to interior only. work involves upgrading toilet areas, crating new all gender bathrooms modify partitions for offices and storage within the space at 1st & 2nd levels. create new compliant stair and exit access. | $60,000 |
| Apr 26, 2024 | Completed final sign-off Oct 2024 | 2550 Ocean Av | exploratory demo permit to check for dry rot. vacant space ab-017Details
exploratory demo permit to check for dry rot. vacant space ab-017 | $500 |
| Jan 17, 2024 | Completed final sign-off Feb 2025 | 400 Crescent Av | exploritory demo < 400 sqft. preparation for washroom -nov 20188991 at 1st flr. level ref: 202111011574Details
exploritory demo < 400 sqft. preparation for washroom -nov 20188991 at 1st flr. level ref: 202111011574 | |
| Oct 27, 2023 | Completed final sign-off Sep 2025 | 695 03rd St | revision to 202001031240. remodel of (e) restaurant, mezzanine & bsement space to be modified into retail, art/furniture gallery. the (e) kitchen, bar & sotrage area to remain w/ minor reduction of equipment for occasional event space use for the retail.Details
revision to 202001031240. remodel of (e) restaurant, mezzanine & bsement space to be modified into retail, art/furniture gallery. the (e) kitchen, bar & sotrage area to remain w/ minor reduction of equipment for occasional event space use for the retail. | |
| Oct 12, 2023 | Completed final sign-off Dec 2023 | 1449 South Van Ness Av | comply with complaint 202288905 to build out storage area within existing garage. repair wall adjacent to 1/2 bath, remodel 1/2 bath. add wall at garage space for storage room.Details
comply with complaint 202288905 to build out storage area within existing garage. repair wall adjacent to 1/2 bath, remodel 1/2 bath. add wall at garage space for storage room. | $8,000 |
| Apr 17, 2023 | Never finaled issued Jul 2023, no final | 998 Valencia St | install new type i hood. noted previously approved under pa# 201702149403. later removed under pa# 202112144407.kitchen area onlyDetails
install new type i hood. noted previously approved under pa# 201702149403. later removed under pa# 202112144407.kitchen area only | $5,000 |
| May 3, 2022 | Completed final sign-off Aug 2022 | 857 Greenwich St | one kitchen and one bathroom remodel in-kind, non-structural.Details
one kitchen and one bathroom remodel in-kind, non-structural. | $39,000 |
| Nov 15, 2021 | Completed final sign-off Feb 2022 | 861 Greenwich St | kitchen and bath room remodel in kind. no moving walls.Details
kitchen and bath room remodel in kind. no moving walls. | $40,000 |
| Apr 27, 2021 | Completed final sign-off Jul 2021 | 156 Terra Vista Av | kitchen and bathroom remodel in-kind. no moving walls.Details
kitchen and bathroom remodel in-kind. no moving walls. | $25,000 |
| Oct 31, 2020 | Expired or cancelled withdrawn Nov 2025 | 695 03rd St | remove (e) awning/replace w/new sign, commercial storefront. (awning sq. ft. 105)Details
remove (e) awning/replace w/new sign, commercial storefront. (awning sq. ft. 105) | $8,000 |
| Jan 31, 2020 | Completed final sign-off Oct 2020 | 333 Randolph St | repair failing lower steps at interior east north stair from 2nd story level to 1st story lvel. all repairs in kindDetails
repair failing lower steps at interior east north stair from 2nd story level to 1st story lvel. all repairs in kind | $1,000 |
| Jan 17, 2020 | Expired or cancelled expired Jun 2025 | 1234 Capitol Av | comply with complaint #201935721 for wall electrical heater, replace bathroom fanDetails
comply with complaint #201935721 for wall electrical heater, replace bathroom fan | $500 |
| Jan 16, 2020 | Expired or cancelled expired Jul 2025 | 695 03rd St | exploratory demo at g/f limited to 100sf at front for dry rot investigation. repatch in-kind. dry installatoin & repair only.Details
exploratory demo at g/f limited to 100sf at front for dry rot investigation. repatch in-kind. dry installatoin & repair only. | $1,000 |
| Jan 3, 2020 | Completed final sign-off Sep 2025 | 695 03rd St | remodel existing restaurant & mezzanine stair modificcation . one story ground floor remodel. change of use from b-occupancy to a-occupancy.Details
remodel existing restaurant & mezzanine stair modificcation . one story ground floor remodel. change of use from b-occupancy to a-occupancy. | $40,000 |
| Apr 9, 2019 | Completed final sign-off May 2019 | 3563 Pierce St | remodel kitchen and bathroom. no change of existing floor planDetails
remodel kitchen and bathroom. no change of existing floor plan | $40,000 |
| Apr 5, 2019 | Completed final sign-off Apr 2019 | 517 Lyon St | administrative permit to document the legal use and occupancy of this building as a two story building containing two residential dwelling units, this determination is based on a review of records including building permit history sanborn map, assesor's records and a site visit by dbiDetails
administrative permit to document the legal use and occupancy of this building as a two story building containing two residential dwelling units, this determination is based on a review of records including building permit history sanborn map, assesor's records and a site visit by dbi | |
| Jan 4, 2019 | Completed final sign-off Mar 2019 | 145 Paloma Av | remodel existing two bathrooms. no change of existing floor planDetails
remodel existing two bathrooms. no change of existing floor plan | $30,000 |
| Nov 30, 2018 | Completed final sign-off Jul 2019 | 3559 Pierce St | revision to app#201611092382 and 201703131339 to clarify as-built conditions for ground floor units. maher n/a.Details
revision to app#201611092382 and 201703131339 to clarify as-built conditions for ground floor units. maher n/a. | |
| Oct 20, 2017 | Completed final sign-off Apr 2018 | 2542 Sacramento St | #201 - remodel kitchen. no wall removalDetails
#201 - remodel kitchen. no wall removal | $18,000 |
| Sep 25, 2017 | Completed final sign-off Oct 2017 | 234 Myrtle St | remodel (e) bathroom. replace tub, toilet, shower valve ,tiles, fan & light.Details
remodel (e) bathroom. replace tub, toilet, shower valve ,tiles, fan & light. | $10,000 |
| Jan 31, 2017 | Never finaled issued Feb 2017, no final | 215 Fremont St | #2b -modify existing floor plan layout. relocate food service equipment. create new service counter at lower level space 2b; not more than 4 employees. n/a ordinance #155-13Details
#2b -modify existing floor plan layout. relocate food service equipment. create new service counter at lower level space 2b; not more than 4 employees. n/a ordinance #155-13 | $2,000 |
| Oct 4, 2016 | Completed final sign-off Jan 2017 | 258 Judson Av | repair front facade in-kind due to auto accident. garage door & right side-repair framing & stuccoDetails
repair front facade in-kind due to auto accident. garage door & right side-repair framing & stucco | $2,000 |
| Aug 18, 2016 | Completed final sign-off Nov 2016 | 972 Mission St | 5th floor: title 24 restroom area. ref pa 201608034080 maher na; building is type iii-b construction; instead of i-b.Details
5th floor: title 24 restroom area. ref pa 201608034080 maher na; building is type iii-b construction; instead of i-b. | $2,500 |
| Aug 3, 2016 | Completed final sign-off Nov 2016 | 972 Mission St | 5th floor level only - barrier removal, remodel exisitng toilets & lunch room area & janitorial closet, kitchenette. n/a maher ordinanceDetails
5th floor level only - barrier removal, remodel exisitng toilets & lunch room area & janitorial closet, kitchenette. n/a maher ordinance | $40,000 |
| May 11, 2016 | Completed final sign-off Jun 2016 | 999 Valencia St | to comply with nov# 201576281 revision to pa# 201603010881Details
to comply with nov# 201576281 revision to pa# 201603010881 | |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 999 Valencia St | upgrade existing mechanical exhaust at basement level for (e) compressors. add insulation at adjoining wall & upgrade (e) wall w/ insulation & 5/8 gyp/bd. each side.Details
upgrade existing mechanical exhaust at basement level for (e) compressors. add insulation at adjoining wall & upgrade (e) wall w/ insulation & 5/8 gyp/bd. each side. | $1,000 |
| Feb 4, 2016 | Completed final sign-off Feb 2016 | 258 Divisadero St | need otc approval for title 24 reportand lightingDetails
need otc approval for title 24 reportand lighting | $4,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2015 | 363 Bocana St | two unit building: 363 bocana - remodel existing master bathroom in kind(replace tub w/ shower); bathroom two, replace tiles only. 365 bocana - remodel (2) bathrooms in kind; hall bathroom change to shower, replace cabinet and sink in kitchen.Details
two unit building: 363 bocana - remodel existing master bathroom in kind(replace tub w/ shower); bathroom two, replace tiles only. 365 bocana - remodel (2) bathrooms in kind; hall bathroom change to shower, replace cabinet and sink in kitchen. | $30,000 |
| Aug 14, 2015 | Completed final sign-off Feb 2016 | 258 Divisadero St | renovate (e) commercial space for new cafe; new accessible restroom; new bar & built in storage; new kitchen equipment & dish stationDetails
renovate (e) commercial space for new cafe; new accessible restroom; new bar & built in storage; new kitchen equipment & dish station | $40,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 401 Madrid St | remodeling and alteration extg bldg. add bathroom at 1st floor and 2nd floor. rebuild rear yard stairs in kind.Details
remodeling and alteration extg bldg. add bathroom at 1st floor and 2nd floor. rebuild rear yard stairs in kind. | $80,000 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 1 Daniel Burnham Ct | open shower wall just enough to replace tub & shower valve in bathroom. patch back in-kindDetails
open shower wall just enough to replace tub & shower valve in bathroom. patch back in-kind | $4,000 |
| Apr 6, 2012 | Never finaled issued Apr 2012, no final | 3100 24th St | administrative permit to document correction of information shown on pa # 201203216513. remove reference to complaint # 201189826 - eid - already abated and remove reference to complaint # 201036094 his - pa # 201010052255 issued for removal of kitchen unit 6 etc.Details
administrative permit to document correction of information shown on pa # 201203216513. remove reference to complaint # 201189826 - eid - already abated and remove reference to complaint # 201036094 his - pa # 201010052255 issued for removal of kitchen unit 6 etc. | |
| Mar 21, 2012 | Completed final sign-off Jul 2012 | 3100 24th St | remodel (e) retail liquor store into retail juice store, upgrade entry doors, upgrade (e) toilet. to comply with nov 2009-10801,2011-15021 and 201189826 and 201036094 (housing)Details
remodel (e) retail liquor store into retail juice store, upgrade entry doors, upgrade (e) toilet. to comply with nov 2009-10801,2011-15021 and 201189826 and 201036094 (housing) | $30,000 |
| Sep 1, 2010 | Completed final sign-off Oct 2010 | 3425 19th St | increase estimated cost to both pa# 2009-1201-2319 & 2009-1201-2317 by an additional cost of $80,000Details
increase estimated cost to both pa# 2009-1201-2319 & 2009-1201-2317 by an additional cost of $80,000 | $80,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 3425 19th St | kitchen and bath remodel. replace kitchen cabinets, countertop, floor, kitchen sink, tub, shower valve, vanity, sink, floorDetails
kitchen and bath remodel. replace kitchen cabinets, countertop, floor, kitchen sink, tub, shower valve, vanity, sink, floor | $8,300 |
| Aug 4, 2010 | Completed final sign-off Jul 2012 | 522 02nd St | tenant improvement-interior new parition walls, remodel & new restrooms, modify (e) lighting & mechanicalDetails
tenant improvement-interior new parition walls, remodel & new restrooms, modify (e) lighting & mechanical | $50,000 |
| May 27, 2010 | Completed final sign-off Apr 2011 | 25 Division St | ground floor tenant improvement of 2195 sq. ft. in a 2 story mixed use commercial building. scope of work includes bulding lobby, kitchen, serving area, bar, food prep area, seating area, hostess area & restrooms. (2 new ada restroom) to be added.Details
ground floor tenant improvement of 2195 sq. ft. in a 2 story mixed use commercial building. scope of work includes bulding lobby, kitchen, serving area, bar, food prep area, seating area, hostess area & restrooms. (2 new ada restroom) to be added. | $90,000 |
| Mar 8, 2010 | Completed final sign-off Jun 2010 | 3423 19th St | to comply with nov# 200848212 dated march 4, 2008 for documentation of (e) first floor plan showing (e) kitchen area within existing retail space. remove (e) front gate.Details
to comply with nov# 200848212 dated march 4, 2008 for documentation of (e) first floor plan showing (e) kitchen area within existing retail space. remove (e) front gate. | $10,000 |
| Dec 8, 2009 | Completed final sign-off Jan 2010 | 20 Germania St | new skylight (flat) @ 9e) repair structure revision to p.a.#2009/0812/4665.Details
new skylight (flat) @ 9e) repair structure revision to p.a.#2009/0812/4665. | $1,000 |
| Oct 27, 2009 | Completed final sign-off Jan 2010 | 20 Germania St | reroofingDetails
reroofing | $4,000 |
| Aug 12, 2009 | Completed final sign-off Jan 2010 | 20 Germania St | remodeling existing building changes all windows. add new bathroom at 1st floor. add redwood trim all around windows and garage door in front building. change the attic floor windows to 2-large windows. remodeling 2nd floor bathroom & bedrooms.Details
remodeling existing building changes all windows. add new bathroom at 1st floor. add redwood trim all around windows and garage door in front building. change the attic floor windows to 2-large windows. remodeling 2nd floor bathroom & bedrooms. | $68,000 |
| Mar 11, 2009 | Never finaled issued Mar 2009, no final | 45 Staples Av | complying with nov.#200872135, legalized electrical outlets, lighting, plumbing and mechanical works related to previous permit application no.200902031345 at garage level. repair and replace existing broken heating ductlines and raise up water heater 18" above finish floor with seismic strap ties.Details
complying with nov.#200872135, legalized electrical outlets, lighting, plumbing and mechanical works related to previous permit application no.200902031345 at garage level. repair and replace existing broken heating ductlines and raise up water heater 18" above finish floor with seismic strap ties. | $4,500 |