Y M Construction
- Based in
- Burlingame
- On San Francisco permits
- Mar 2023 to Aug 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2024 | In progress issued Aug 2024 | 2468 Filbert St | rev 202312223026 for revised guardrails at rear decks. see pa 202312223026 for structural details.Details
rev 202312223026 for revised guardrails at rear decks. see pa 202312223026 for structural details. | |
| Dec 22, 2023 | In progress issued Jun 2024 | 2468 Filbert St | front and rear facade work, west property line windows replacement, new roof terrace, window replacement throughout, new hvac and water heaters; interior renovation replacing interior finihes throughout with minimal interior layout changes. deferred: fire sprinklers for top unit (levels 3-4)Details
front and rear facade work, west property line windows replacement, new roof terrace, window replacement throughout, new hvac and water heaters; interior renovation replacing interior finihes throughout with minimal interior layout changes. deferred: fire sprinklers for top unit (levels 3-4) | $150,000 |
| Mar 30, 2023 | Never finaled issued Mar 2023, no final | 2468 Filbert St | rewire of 3/f unit, new outlets/lights/swithces, new panel boards & add car charger in garage; (4) bathroom remodels, (2) in each unit, replace plumbing lines, drywall, insulating, (4) shower pans; 2 kit remodels, 1 in each unitDetails
rewire of 3/f unit, new outlets/lights/swithces, new panel boards & add car charger in garage; (4) bathroom remodels, (2) in each unit, replace plumbing lines, drywall, insulating, (4) shower pans; 2 kit remodels, 1 in each unit | $40,000 |