Xintek Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Jul 2017
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2017 | Completed final sign-off Sep 2017 | 1325 Mason St | work in unit 302: kitchen remodel: replace (e) plaster to 5/8 type "x" sheetrock, replace kitchen cabinets and countertop, no structural or walla changeDetails
work in unit 302: kitchen remodel: replace (e) plaster to 5/8 type "x" sheetrock, replace kitchen cabinets and countertop, no structural or walla change | $12,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2017 | 1419 15th Av | remodel one kitchen, replace (e) plaster to type "x" sheetrock, replace kitchen cabinets, sink, counter, electrical receptacles. non structural change.Details
remodel one kitchen, replace (e) plaster to type "x" sheetrock, replace kitchen cabinets, sink, counter, electrical receptacles. non structural change. | $15,000 |
| Jul 13, 2015 | Completed final sign-off Oct 2015 | 72 Newton St | dry rot repair: replace rotten wood & stucco approximately 150 sq. ft. at front house, repair stucco in kind.Details
dry rot repair: replace rotten wood & stucco approximately 150 sq. ft. at front house, repair stucco in kind. | $2,800 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 1325 Mason St | work on top floor: unit #301: kitchen remodel: replace existing plaster to 5/8" type "x" sheetrock. replace kitchen cabinets and counter top. no structure or wall change. no doors/windows/walls under this scope. electrical and plumbing under separate permit.Details
work on top floor: unit #301: kitchen remodel: replace existing plaster to 5/8" type "x" sheetrock. replace kitchen cabinets and counter top. no structure or wall change. no doors/windows/walls under this scope. electrical and plumbing under separate permit. | $12,000 |
| Sep 6, 2013 | Completed final sign-off Dec 2013 | 264 Sadowa St | remodel (e) kitchen: replace cabinets, countertop, electrical receptacles, remodel (e) bathroom: replace toilet, lavatory, bath tub, non-structural changes, no change in wall, window and doorDetails
remodel (e) kitchen: replace cabinets, countertop, electrical receptacles, remodel (e) bathroom: replace toilet, lavatory, bath tub, non-structural changes, no change in wall, window and door | $18,000 |
| Feb 13, 2013 | Completed final sign-off Mar 2013 | 383 Crestlake Dr | dry rot repair, re-stucco 90 sq.ft. on right side of garage; not visible from streetDetails
dry rot repair, re-stucco 90 sq.ft. on right side of garage; not visible from street | $5,500 |
| Jun 22, 2012 | Completed final sign-off Aug 2012 | 667 14th Av | replace kitchen cabinets only at one side. no. electrical or plumbing work. no. structural work.Details
replace kitchen cabinets only at one side. no. electrical or plumbing work. no. structural work. | $5,000 |
| Apr 12, 2012 | Completed final sign-off Mar 2013 | 15 Santa Clara Av | kitchen remodel: replace existing plaster to 5/8 sheetrock, replace kitchen cabinet & counter top, no structure or wall change. new lighting comply with cec150(k)Details
kitchen remodel: replace existing plaster to 5/8 sheetrock, replace kitchen cabinet & counter top, no structure or wall change. new lighting comply with cec150(k) | $18,000 |
| Jul 17, 2006 | Completed final sign-off Oct 2006 | 2331 Rivera St | bathroom remodeling (main floor) no structural change new lighting to be flourescent or occupance sensorDetails
bathroom remodeling (main floor) no structural change new lighting to be flourescent or occupance sensor | $10,000 |