- 21 permits filed
42 permits since 2000: 20 completed, 15 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 127 Northridge Rd | drywall repair in kitchen approx 2 square feet.Details
drywall repair in kitchen approx 2 square feet. | $3,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 772 Jerrold Av | replacing one foot of sheetrock in living room and one bedroom. replace water heater and outlet covers.Details
replacing one foot of sheetrock in living room and one bedroom. replace water heater and outlet covers. | $7,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 580 Capp St | install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connectionsDetails
install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connections | $9,000 |
| Jan 22, 2026 | Completed final sign-off Feb 2026 | 1201 Golden Gate Av | apt#420: new kitchen countertopDetails
apt#420: new kitchen countertop | $3,000 |
| Jan 22, 2026 | Completed final sign-off Feb 2026 | 1201 Golden Gate Av | apt#408: new kitchen countertopDetails
apt#408: new kitchen countertop | $3,000 |
| Dec 8, 2025 | In progress issued Dec 2025 | 1201 Golden Gate Av | unit 523: new kitchen countertops, adding electrical outlets and updated plumbing in kitchen.Details
unit 523: new kitchen countertops, adding electrical outlets and updated plumbing in kitchen. | $3,000 |
| Sep 29, 2025 | In progress issued Sep 2025 | 1066 Mission St | unit 209: remove & replace sheetrock, patch up work, kitchen in-kind. existing accessible features to be maintainedDetails
unit 209: remove & replace sheetrock, patch up work, kitchen in-kind. existing accessible features to be maintained | $5,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel.Details
unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel. | $5,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodelDetails
unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodel | $5,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 1066 Mission St | 1066 mission apt#209: remove and replace sheetrock to patch up work for electrical replacement (separate electrical permit by a c-10 contractor required)Details
1066 mission apt#209: remove and replace sheetrock to patch up work for electrical replacement (separate electrical permit by a c-10 contractor required) | $5,000 |
| Aug 25, 2025 | Completed final sign-off Feb 2026 | 1201 Golden Gate Av | unit #221: install new flooring, replace electrical wiring, new tub install, sheetrock and installation.Details
unit #221: install new flooring, replace electrical wiring, new tub install, sheetrock and installation. | $28,000 |
| Jul 10, 2025 | Expired or cancelled suspend Aug 2025 | 2770 Lombard St | unit 407: replace countertop in kitchen and bathroom.Details
unit 407: replace countertop in kitchen and bathroom. | $2,000 |
| Jun 16, 2025 | In progress issued Jun 2025 | 580 Capp St | #509: countertop replacement in kitchen.Details
#509: countertop replacement in kitchen. | $1,500 |
| Jun 16, 2025 | In progress issued Jun 2025 | 1201 Golden Gate Av | #403: countertop replacementin kitchen.Details
#403: countertop replacementin kitchen. | $1,500 |
| May 27, 2025 | In progress issued May 2025 | 580 Capp St | #208: remodel kitchen in kind.Details
#208: remodel kitchen in kind. | $1,500 |
| May 2, 2025 | In progress issued May 2025 | 580 Capp St | revision to 202504245185 (apt 208) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction cost valuation.Details
revision to 202504245185 (apt 208) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction cost valuation. | |
| May 2, 2025 | In progress issued May 2025 | 580 Capp St | revision to 202504245188 (apt 402) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction.Details
revision to 202504245188 (apt 402) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction. | |
| Apr 24, 2025 | In progress issued Apr 2025 | 580 Capp St | unit #208: drywall insulation and cabinetsDetails
unit #208: drywall insulation and cabinets | $1,500 |
| Apr 24, 2025 | In progress issued Apr 2025 | 580 Capp St | unit #402: drywall insulation and cabinetsDetails
unit #402: drywall insulation and cabinets | $1,500 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 1820 Post St | unit #1820a: replace kitchen countertop; no other work; no changes to appliances and fixtures.Details
unit #1820a: replace kitchen countertop; no other work; no changes to appliances and fixtures. | $2,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 1820 Post St | replace countertop and cabinet in apt #1901Details
replace countertop and cabinet in apt #1901 | $9,000 |
| Mar 21, 2019 | Completed final sign-off Apr 2019 | 25 Sanchez St | in ref to complaint #201811161, #5: relocate or provide galvanized metal. to line all garbage room walls and inside of garbage rooms with not less than no. 26 gauge, galvanized sheet metal.Details
in ref to complaint #201811161, #5: relocate or provide galvanized metal. to line all garbage room walls and inside of garbage rooms with not less than no. 26 gauge, galvanized sheet metal. | $2,400 |
| Nov 13, 2018 | Completed final sign-off Nov 2018 | 3001 Folsom St | to comply with nov# 201873481. repair existing concrete & damaged post. repair post with finished concrete base.Details
to comply with nov# 201873481. repair existing concrete & damaged post. repair post with finished concrete base. | $6,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 54 Mcallister St | no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls.Details
no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls. | $5,000 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 530 08th Av | to comply nov#201406731. dryer vent & bldg hall way electrical.Details
to comply nov#201406731. dryer vent & bldg hall way electrical. | $450 |
| Dec 30, 2014 | Completed final sign-off Jun 2017 | 1332 Anza St | horiz addition @ rear only, to average of neighbors' rear lines. no change to front facade. vertical (4th fl) addition matching both neighbors' 4th fl envelopes (front setback of 15ft to ensure not visible from public way & rear setback of 10 ft). infill lightwell w/c faces blank neighboring wallDetails
horiz addition @ rear only, to average of neighbors' rear lines. no change to front facade. vertical (4th fl) addition matching both neighbors' 4th fl envelopes (front setback of 15ft to ensure not visible from public way & rear setback of 10 ft). infill lightwell w/c faces blank neighboring wall | $235,000 |
| Nov 14, 2014 | Expired or cancelled withdrawn Jun 2017 | 1332 Anza St | interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope.Details
interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope. | $30,000 |
| Oct 9, 2014 | Never finaled issued Oct 2014, no final | 1974 43rd Av | termite repair in basement dry rot. report# 13590 4a 6a 1c,1b, 10a only less than 50% stair repair.Details
termite repair in basement dry rot. report# 13590 4a 6a 1c,1b, 10a only less than 50% stair repair. | $1,000 |
| Aug 28, 2014 | Completed final sign-off Sep 2014 | 734 Grant Av | electrical work and remove the storage rooms without permit to comply w/nov 201488552.Details
electrical work and remove the storage rooms without permit to comply w/nov 201488552. | $1,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| May 27, 2014 | Completed final sign-off Dec 2014 | 227 Farallones St | 1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan.Details
1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan. | $65,000 |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 279 Seneca Av | revision to 201112231263: relocate existing full bath and convert existing storage to new study room on gr floorDetails
revision to 201112231263: relocate existing full bath and convert existing storage to new study room on gr floor | $500 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 2131 Ortega St | change one window visible from street. no rough opening changes. window u-factor not to exceed 0.40.Details
change one window visible from street. no rough opening changes. window u-factor not to exceed 0.40. | $1,200 |
| Mar 19, 2012 | Completed final sign-off Dec 2012 | 2700 Ulloa St | add a guest room, a bedroom, a family room and bath on 1st floor for single family use. add side door off bedroom at 1st fl.Details
add a guest room, a bedroom, a family room and bath on 1st floor for single family use. add side door off bedroom at 1st fl. | $55,000 |
| Jan 12, 2012 | Completed final sign-off Jul 2013 | 2701 Pacheco St | to add 2 bedroom,2 full bathroom, and laundry area on extg ground floor per plans.Details
to add 2 bedroom,2 full bathroom, and laundry area on extg ground floor per plans. | $40,000 |
| Dec 23, 2011 | Completed final sign-off Jan 2013 | 279 Seneca Av | interior remodeling; adding two new bedrooms, two new bathrooms and storage at ground floor as per plan.Details
interior remodeling; adding two new bedrooms, two new bathrooms and storage at ground floor as per plan. | $48,000 |
| Dec 6, 2011 | Never finaled issued Mar 2012, no final | 2700 Ulloa St | slab and footing repair, per plans.Details
slab and footing repair, per plans. | $20,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2012 | 2121 Noriega St | interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan.Details
interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan. | $38,000 |
| Feb 28, 2011 | Completed final sign-off Mar 2011 | 442 Elizabeth St | to comply with nov #20191866: new sheet rock at ceiling, provide 1-layer 5/8" type x gypsum board at garage ceiling, nailed with 6d coated nails, 1 7/8" long at 6" o.c. for 1-hour fire separation, approx. 1800 sf of area.Details
to comply with nov #20191866: new sheet rock at ceiling, provide 1-layer 5/8" type x gypsum board at garage ceiling, nailed with 6d coated nails, 1 7/8" long at 6" o.c. for 1-hour fire separation, approx. 1800 sf of area. | $9,000 |
| Oct 6, 2010 | Never finaled issued Oct 2010, no final | 22 Scott Al | remove shower pan & tiles, replace bathtub, floor drain, vanity sink, faucet& tiles. high efficacy light or occupancy sensor.Details
remove shower pan & tiles, replace bathtub, floor drain, vanity sink, faucet& tiles. high efficacy light or occupancy sensor. | $2,500 |
| Mar 30, 2010 | Completed final sign-off Nov 2011 | 20 Hoffman Av | flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level.Details
flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level. | $82,000 |
| May 24, 2006 | Completed final sign-off Jun 2006 | 3855 California St | remove (e) stucco & refinish in kind at the rear on third floor.Details
remove (e) stucco & refinish in kind at the rear on third floor. | $6,000 |