Wtam Builder
- Based in
- El Cerrito
- On San Francisco permits
- Apr 2023 to Jul 2025
- Last 24 months
- 2 permits filed
8 permits since 2000: 4 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2025 | Completed final sign-off Jan 2026 | 2298 Lombard St | interior alterations for a sweathouz (wellness center), including new partitions and ceilings, new restroom, select mep withing (e) building.Details
interior alterations for a sweathouz (wellness center), including new partitions and ceilings, new restroom, select mep withing (e) building. | $320,000 |
| Dec 17, 2024 | In progress issued Aug 2025 | 2298 Lombard St | demo only at ground floor commerical space. removal of interior window, portition walls, plumbing fixtures. no affect on ceiling.Details
demo only at ground floor commerical space. removal of interior window, portition walls, plumbing fixtures. no affect on ceiling. | $5,000 |
| Sep 30, 2024 | Completed final sign-off Nov 2025 | 1438 39th Av | 2nd/f: remodel e) kitchen, dining, bedroom and bathroom; infill 2 lightwell, new skylights & windows.Details
2nd/f: remodel e) kitchen, dining, bedroom and bathroom; infill 2 lightwell, new skylights & windows. | $87,000 |
| Aug 2, 2024 | Completed final sign-off Nov 2025 | 1438 39th Av | remove interior drywall in living room & insulate w/ safe & rockwoul insulation for sound dampening. replace drywall w/ 5/8"Details
remove interior drywall in living room & insulate w/ safe & rockwoul insulation for sound dampening. replace drywall w/ 5/8" | $1,000 |
| Feb 6, 2024 | In progress issued Feb 2024 | 125 Northwood Dr | patch and replace loose plastor at ceiling in living room less then 75 sqft, remove and replace water damage floor and drywall if nessary less then 100 sq ft. repaint water stained ceiling or walls.Details
patch and replace loose plastor at ceiling in living room less then 75 sqft, remove and replace water damage floor and drywall if nessary less then 100 sq ft. repaint water stained ceiling or walls. | $2,000 |
| Jan 26, 2024 | Completed final sign-off Jun 2024 | 250 Burrows St | remove awning from 2nd flr. to backyard (originally unpermitted) remove room in garage -remove interior partition only. both items to correct under violation#: 202308526Details
remove awning from 2nd flr. to backyard (originally unpermitted) remove room in garage -remove interior partition only. both items to correct under violation#: 202308526 | $2,500 |
| Jul 6, 2023 | Expired or cancelled cancelled Jan 2025 | 2147 29th Av | remodel downstairs bathroom. replace finishes only. remove built in cabiets and replace with new drywall and cabinets. redo wet wall and shower pan.Details
remodel downstairs bathroom. replace finishes only. remove built in cabiets and replace with new drywall and cabinets. redo wet wall and shower pan. | $6,500 |
| Apr 24, 2023 | Never finaled issued Jul 2023, no final | 2675 Geary Bl | ste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub.Details
ste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub. | $250,000 |