Wright Brothers Builders Inc
- Based in
- Fremont
- On San Francisco permits
- Mar 2019 to Sep 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 2250 24th St | suite 224: remodel kitchen and bathroom like for like. cabinet and counter replacement, flooring, and baseboard, vanity, and tub replacement, prime and paint. no alteration of wall, window and doorDetails
suite 224: remodel kitchen and bathroom like for like. cabinet and counter replacement, flooring, and baseboard, vanity, and tub replacement, prime and paint. no alteration of wall, window and door | $69,000 |
| Mar 12, 2019 | Completed final sign-off Apr 2019 | 99 Magellan Av | install a natural gas heater electrical 110 lines 5" diameter vent on roof of first floor, drywall repair in the living room. gas vent shall comply w/ sfmc 802.6.2. gas heater shall be direct vent min 78% afue or 80% .Details
install a natural gas heater electrical 110 lines 5" diameter vent on roof of first floor, drywall repair in the living room. gas vent shall comply w/ sfmc 802.6.2. gas heater shall be direct vent min 78% afue or 80% . | $5,644 |