Woznak Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Mar 2010 to Mar 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 55 Grant Av | remodel existing hair salon on 6th fl. remove non bearing parition walls, no changes to structural components. remove old light fixtures, new lights and paintDetails
remodel existing hair salon on 6th fl. remove non bearing parition walls, no changes to structural components. remove old light fixtures, new lights and paint | $21,000 |
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 55 Grant Av | removing non-load bearing partition walls, and removing old incandescent light fixturesDetails
removing non-load bearing partition walls, and removing old incandescent light fixtures | $3,000 |
| May 9, 2016 | Completed final sign-off Nov 2017 | 234 Teresita Bl | change of use from church to single family home. new floor plan layout with new wall partitions, new windows and doors. all new kitchen and bathrooms and exterior sidings. automatic fire sprinkler system to be provided under separate permit per nfpa 13d.Details
change of use from church to single family home. new floor plan layout with new wall partitions, new windows and doors. all new kitchen and bathrooms and exterior sidings. automatic fire sprinkler system to be provided under separate permit per nfpa 13d. | $85,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2016 | 55 Grant Av | 5th floor: non structural partition wall relocationDetails
5th floor: non structural partition wall relocation | $6,000 |
| Mar 4, 2010 | Completed final sign-off Apr 2010 | 55 Grant Av | comply nov 201031111 dated 1/14/2010: remove & repalce cabients, install plugs in kitchen, install lights, install hair wash stations, painting, flooring, remove walls (partition only no structural.Details
comply nov 201031111 dated 1/14/2010: remove & repalce cabients, install plugs in kitchen, install lights, install hair wash stations, painting, flooring, remove walls (partition only no structural. | $16,000 |