Wong Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to May 2026
- Last 24 months
- 15 permits filed
278 permits since 2000: 245 completed, 6 in progress, 10 never finaled, 17 expired or cancelled.
Of the 10 never-finaled permits, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 278.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Sep 2026 | 901 Irving St | revision to pa# 202603278474: add new ada bath and remove (e) posts in the ground floor.Details
revision to pa# 202603278474: add new ada bath and remove (e) posts in the ground floor. | $20,000 |
| Mar 27, 2026 | Completed final sign-off Sep 2026 | 901 Irving St | voluntary structural strengthening .replace front entry at commercial unitDetails
voluntary structural strengthening .replace front entry at commercial unit | $90,000 |
| Feb 13, 2026 | Completed final sign-off Feb 2026 | 1115 Taylor St | repair stair landing due to dryrot back of bldg, less than 50%, non street visible. repair and repalce guardrail two pieces on roof.Details
repair stair landing due to dryrot back of bldg, less than 50%, non street visible. repair and repalce guardrail two pieces on roof. | $2,500 |
| Nov 21, 2025 | Completed final sign-off Feb 2026 | 471 19th Av | add new anchor bolts in the existing concrete footings.Details
add new anchor bolts in the existing concrete footings. | $10,000 |
| Jun 20, 2025 | In progress issued Jun 2025 | 1178 Union St | to comply with nov 202536807, item #8 - remove stucco, repair dry rot, window trims and moulding, replace (15) windows. visible from street.Details
to comply with nov 202536807, item #8 - remove stucco, repair dry rot, window trims and moulding, replace (15) windows. visible from street. | $35,000 |
| Apr 17, 2025 | Completed final sign-off Apr 2026 | 2142 44th Av | at 1st floor, add (n) addition @ rear for (n) bedroom and new deck porch. modify (e) bedroom to bath and walk-in.Details
at 1st floor, add (n) addition @ rear for (n) bedroom and new deck porch. modify (e) bedroom to bath and walk-in. | $98,000 |
| Apr 14, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen.Details
replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen. | $18,000 |
| Apr 11, 2025 | Completed final sign-off Aug 2025 | 1115 Taylor St | unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leakDetails
unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leak | $20,000 |
| Mar 26, 2025 | Completed final sign-off May 2025 | 2380 Jackson St | plaster and paint walls and ceiling damaged by leak. tile shower walls.to abate nov. #202534423 items #3 and #5Details
plaster and paint walls and ceiling damaged by leak. tile shower walls.to abate nov. #202534423 items #3 and #5 | $3,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line. | $38,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 377 Bay St | volutary structrual strengthening in the buildlingDetails
volutary structrual strengthening in the buildling | $60,000 |
| Feb 28, 2025 | Completed final sign-off Apr 2025 | 2027 22nd Av | revision to pa 202404301100 remove wood beamDetails
revision to pa 202404301100 remove wood beam | |
| Dec 31, 2024 | Completed final sign-off Mar 2025 | 2239 29th Av | ref 201708286040 t0 abate nov 202429645 to include relocate the stairs and wood deck to the rear yard of building.Details
ref 201708286040 t0 abate nov 202429645 to include relocate the stairs and wood deck to the rear yard of building. | $8,000 |
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 2505 Sacramento St | add 2 doors @ corridor of 1st floorDetails
add 2 doors @ corridor of 1st floor | $8,000 |
| Nov 1, 2024 | Completed final sign-off Dec 2024 | 5830 Geary Bl | replace existing exhaust duct with new exhaust duct in the rear of the buildling. comply with complaint 202427114Details
replace existing exhaust duct with new exhaust duct in the rear of the buildling. comply with complaint 202427114 | $4,000 |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 1238 Stockton St | repair facade cladding in kind in front of bldg. no interior layout changeDetails
repair facade cladding in kind in front of bldg. no interior layout change | $30,000 |
| Apr 30, 2024 | Completed final sign-off Apr 2025 | 2027 22nd Av | replace (e) footing with new concrete footing and new wood beam in the second floor.Details
replace (e) footing with new concrete footing and new wood beam in the second floor. | $40,000 |
| Apr 11, 2024 | Completed final sign-off Jul 2024 | 2185 Fillmore St | enlarge ada bathroom in the 1st floor.Details
enlarge ada bathroom in the 1st floor. | $30,000 |
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 295 Divisadero St | install general ventilation system, remodel kitchen & bar.Details
install general ventilation system, remodel kitchen & bar. | $150,000 |
| Feb 16, 2024 | In progress issued Mar 2024 | 727 Jackson St | install new sidewalk basement roof slab and new retaining walls with shoring.Details
install new sidewalk basement roof slab and new retaining walls with shoring. | $100,000 |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 1255 09th Av | to comply with accessible business entrance ordinance at one business entrance. add door operator. abe# 202310278987Details
to comply with accessible business entrance ordinance at one business entrance. add door operator. abe# 202310278987 | $8,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 494 14th St | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313609Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313609 | $18,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 496 14th St | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313611Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313611 | $18,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 498 14th St | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313612Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313612 | $8,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 1810 Irving St | to comply with abe. add power door operator. abe 201812313632.Details
to comply with abe. add power door operator. abe 201812313632. | $10,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 1812 Irving St | to comply with abe. add power door operator. abe 201812313633.Details
to comply with abe. add power door operator. abe 201812313633. | $10,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 1816 Irving St | to comply with abe. add power door operator and concrete slab. abe 201812313634.Details
to comply with abe. add power door operator and concrete slab. abe 201812313634. | $20,000 |
| Apr 28, 2023 | Completed final sign-off Sep 2024 | 1650 Polk St | revision to pa 2020-0121-2426 relocate plywood shear walls in the 1st flDetails
revision to pa 2020-0121-2426 relocate plywood shear walls in the 1st fl | |
| Jan 10, 2023 | Completed final sign-off Aug 2023 | 566 Lombard St | unit #2: remodel kithchen and bathroom, removal of some interior walls reinforce floor due to removal of walls, add new bedroomDetails
unit #2: remodel kithchen and bathroom, removal of some interior walls reinforce floor due to removal of walls, add new bedroom | $60,000 |
| Oct 13, 2022 | Completed final sign-off Nov 2022 | 2195 Beach St | revision to pa# 2018-0712-4369: modify moment fram slystem at gl 4 reduce from 3 frames to 2 upgrade steel remove ply sheet wall (e) boiler roomDetails
revision to pa# 2018-0712-4369: modify moment fram slystem at gl 4 reduce from 3 frames to 2 upgrade steel remove ply sheet wall (e) boiler room | |
| Sep 30, 2022 | Completed final sign-off Apr 2023 | 301 Church St | to comply wiwth accessible business entrance ordinance at one business entrance. abe# 220207012263Details
to comply wiwth accessible business entrance ordinance at one business entrance. abe# 220207012263 | $6,000 |
| Aug 15, 2022 | Expired or cancelled cancelled Aug 2022 | 1152 Mason St | to obtain final inspection for work approved under pa#201709158520 and pa#202012070349 all work is completeDetails
to obtain final inspection for work approved under pa#201709158520 and pa#202012070349 all work is complete | |
| Aug 15, 2022 | Completed final sign-off Aug 2022 | 1152 Mason St | to obtain final inspection for work approved under pa#201709158520 and pa#202012070349 all work is completeDetails
to obtain final inspection for work approved under pa#201709158520 and pa#202012070349 all work is complete | |
| Jul 21, 2022 | Completed final sign-off Oct 2022 | 123 West Portal Av | interior remodel in the 1st floor retail spaceDetails
interior remodel in the 1st floor retail space | $55,000 |
| Jun 13, 2022 | Completed final sign-off Apr 2023 | 301 Church St | to comply with nov 202290872. repaint due to fire damage to building in-kind, exterior work. side of property approx area 2100 sqft.Details
to comply with nov 202290872. repaint due to fire damage to building in-kind, exterior work. side of property approx area 2100 sqft. | $23,000 |
| May 31, 2022 | Completed final sign-off Sep 2022 | 1293 Green St | remove wall in the kitchen and enlarge bathroom on the third floor.Details
remove wall in the kitchen and enlarge bathroom on the third floor. | $24,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| May 6, 2022 | Completed final sign-off Sep 2022 | 401 Columbus Av | revision to pa# 202101253221. relocate shear wall.Details
revision to pa# 202101253221. relocate shear wall. | |
| Apr 20, 2022 | Completed final sign-off Oct 2023 | 649 25th Av | seismic retrofit of soft story comply with sfebc 4d. mandatory seismic retrofit per 2016 cebc appendix a4.Details
seismic retrofit of soft story comply with sfebc 4d. mandatory seismic retrofit per 2016 cebc appendix a4. | $100,000 |
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 401 Columbus Av | add new concrete footing under the plywood shear wall in the first floor. revision to pa# 202101253221Details
add new concrete footing under the plywood shear wall in the first floor. revision to pa# 202101253221 | $6,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2022 | 260 West Portal Av | file permit toinclude detail sheet s41 that was not in the revision permit 2021-0621-2894 which revised pa 2017-0818-5325Details
file permit toinclude detail sheet s41 that was not in the revision permit 2021-0621-2894 which revised pa 2017-0818-5325 | |
| Jan 14, 2022 | Completed final sign-off Apr 2022 | 1287 Green St | revision to permit 202105210840. relocate new post.Details
revision to permit 202105210840. relocate new post. | |
| Jan 12, 2022 | Completed final sign-off Mar 2022 | 600 Irving St | repair dry rot under one bay window: in kind- facade work only.Details
repair dry rot under one bay window: in kind- facade work only. | $2,900 |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 1005 Irving St | seismic retrofit of soft story comply w/ sffc 4d mondatory seismic retrofit per 2016 cebc appendex a4. revision to 201812219038 to separate commercial and residential. (commercial only)Details
seismic retrofit of soft story comply w/ sffc 4d mondatory seismic retrofit per 2016 cebc appendex a4. revision to 201812219038 to separate commercial and residential. (commercial only) | |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 1005 Irving St | seismic retrofit of soft story comply w/ sffc 4d mondatory seismic retrofit per 2016 cebc appendex a4. revision to 201812219038 to separate commercial and residential. (residential only)Details
seismic retrofit of soft story comply w/ sffc 4d mondatory seismic retrofit per 2016 cebc appendex a4. revision to 201812219038 to separate commercial and residential. (residential only) | |
| Oct 15, 2021 | Completed final sign-off Dec 2021 | 1624 Bay St | recommencement and completion of work approved under pa#'s: 201605268458 and 201703272380.Details
recommencement and completion of work approved under pa#'s: 201605268458 and 201703272380. | $75,000 |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 566 Lombard St | work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framingDetails
work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framing | $120,000 |
| Jul 30, 2021 | Completed final sign-off Oct 2021 | 242 27th Av | groumd fl laateral upgrades to comply w/ sf ab-094 (per asce 7-16 standards) steel moment frame & plywood shearwlls and new conc. grade beamsDetails
groumd fl laateral upgrades to comply w/ sf ab-094 (per asce 7-16 standards) steel moment frame & plywood shearwlls and new conc. grade beams | $75,000 |
| Jun 21, 2021 | Completed final sign-off Jun 2022 | 260 West Portal Av | revision to app# 201708185325Details
revision to app# 201708185325 | |
| Jun 18, 2021 | Never finaled issued Jul 2021, no final | 1029 Jackson St | add mechanincal work in the buildingDetails
add mechanincal work in the building | $12,000 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 678 Green St | remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood.Details
remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood. | $75,000 |
| May 21, 2021 | Completed final sign-off Apr 2022 | 1287 Green St | remove walls on the 1st fl. remove wall to open up kitchen area. no changes to g/f except new post and foundationDetails
remove walls on the 1st fl. remove wall to open up kitchen area. no changes to g/f except new post and foundation | $25,000 |
| May 3, 2021 | Completed final sign-off Jun 2021 | 1830 Clement St | repair in kind like for like exterior backyard stair. less than 40%. repair only.Details
repair in kind like for like exterior backyard stair. less than 40%. repair only. | $5,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 1455 Greenwich St | revise steel moment frames and shear walls. revision to pa 202101293680.Details
revise steel moment frames and shear walls. revision to pa 202101293680. | |
| Apr 7, 2021 | Completed final sign-off Feb 2022 | 756 35th Av | new bldg: revision to app#201805159092. revise interior layouts, add 1 bathroom on 2nd floor. add 1 bedroom and 1 shower on 3rd floor.Details
new bldg: revision to app#201805159092. revise interior layouts, add 1 bathroom on 2nd floor. add 1 bedroom and 1 shower on 3rd floor. | |
| Jan 29, 2021 | Completed final sign-off Sep 2021 | 1455 Greenwich St | seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retroifix per 2016 cebc appendix a4.Details
seismic retrofit of soft-story. comply with sfebc 4d mandatory seismic retroifix per 2016 cebc appendix a4. | $100,000 |
| Jan 25, 2021 | Completed final sign-off Sep 2022 | 401 Columbus Av | voluntary seismic strengthening in the front of the building.Details
voluntary seismic strengthening in the front of the building. | $100,000 |
| Dec 18, 2020 | Completed final sign-off May 2021 | 673 47th Av | add new concrete tie beams in the basement level. to comply with nov 202011500.Details
add new concrete tie beams in the basement level. to comply with nov 202011500. | $15,000 |
| Dec 7, 2020 | Expired or cancelled expired Aug 2022 | 1152 Mason St | relocate plywood shear walls in the 1/f. revision to pa # 201709158520Details
relocate plywood shear walls in the 1/f. revision to pa # 201709158520 | |
| Nov 5, 2020 | Never finaled issued Nov 2020, no final | 1800 Irving St | repair kind for kind like for like, store front due to car accident. to comply with nov# 202061881 & 202061891.Details
repair kind for kind like for like, store front due to car accident. to comply with nov# 202061881 & 202061891. | $35,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 1295 39th Av | repair and replace corbels at top of the building. comply w/ notice of violation report 202045682Details
repair and replace corbels at top of the building. comply w/ notice of violation report 202045682 | $2,500 |
| Feb 19, 2020 | Completed final sign-off Oct 2020 | 2645 Franklin St | to comply with complaint 202012651 - soft story retrofit per sfevc chapter 4d engineering criteria 2016 cebc appendix a-4Details
to comply with complaint 202012651 - soft story retrofit per sfevc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| Dec 9, 2019 | Completed final sign-off Feb 2020 | 848 Cole St | to comply with complaint 201903181 remove (e) wood post and replace with new wood post and concrete footing in the rear of buildingDetails
to comply with complaint 201903181 remove (e) wood post and replace with new wood post and concrete footing in the rear of building | $9,000 |
| Nov 4, 2019 | Completed final sign-off Nov 2020 | 1828 Clement St | soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 (commercial)Details
soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 (commercial) | $30,000 |
| Nov 4, 2019 | Completed final sign-off Nov 2020 | 1828 Clement St | soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 (residential)Details
soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 (residential) | $60,000 |
| Oct 16, 2019 | Completed final sign-off Jan 2020 | 890 34th Av | rev to pa# 201709158629; replace a special moment frame to an ordinary moment frameDetails
rev to pa# 201709158629; replace a special moment frame to an ordinary moment frame | |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 1142 Washington St | revision to revised concrete footing reduce width from 3' to 2'6" on 1st fl refer to 201904057294Details
revision to revised concrete footing reduce width from 3' to 2'6" on 1st fl refer to 201904057294 | |
| Oct 3, 2019 | Completed final sign-off Jan 2020 | 1745 Washington St | revision to pa 2017-0914-8331 (soft story). relocate shear walls and footing on the 1st floorDetails
revision to pa 2017-0914-8331 (soft story). relocate shear walls and footing on the 1st floor | |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 536 Irving St | seismic retrofit of soft story. comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4. (residential only)Details
seismic retrofit of soft story. comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4. (residential only) | $60,000 |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 536 Irving St | seismic retrofit of soft story. comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4. (commerical)Details
seismic retrofit of soft story. comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4. (commerical) | $30,000 |
| Sep 19, 2019 | Completed final sign-off Jun 2020 | 1815 Leavenworth St | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4 revision to 201609289080Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4 revision to 201609289080 | $90,000 |
| Sep 18, 2019 | Completed final sign-off Feb 2023 | 1142 Mason St | in 1st floor: convert existing storage space to be an adu per ordinance no. 162-16.Details
in 1st floor: convert existing storage space to be an adu per ordinance no. 162-16. | $80,000 |
| Aug 6, 2019 | Completed final sign-off May 2023 | 2501 Van Ness Av | residential: seismic soft story retrofit per sfebc chapter 4d using engineering creiteria 2016 cebc appendix a-4.Details
residential: seismic soft story retrofit per sfebc chapter 4d using engineering creiteria 2016 cebc appendix a-4. | $60,000 |
| Aug 6, 2019 | Completed final sign-off May 2023 | 2501 Van Ness Av | commercial: seismic soft story retrofit per sfebc chapter 4d using engineering creiteria 2016 cebc appendix a-4.Details
commercial: seismic soft story retrofit per sfebc chapter 4d using engineering creiteria 2016 cebc appendix a-4. | $40,000 |
| Jun 27, 2019 | Completed final sign-off Aug 2019 | 1115 Taylor St | relocate shear walls and revised details. revision to 201709158555Details
relocate shear walls and revised details. revision to 201709158555 | |
| Jun 25, 2019 | Completed final sign-off Oct 2019 | 251 27th Av | rev to pa# 201709148194; to moment frame design for approved soft story permitDetails
rev to pa# 201709148194; to moment frame design for approved soft story permit | |
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 2230 Leavenworth St | rev to pa# 201709087447; relocate steel frame and shear walls in the 1st fl.Details
rev to pa# 201709087447; relocate steel frame and shear walls in the 1st fl. | |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 3333 24th St | street spaceDetails
street space | |
| Jun 18, 2019 | Completed final sign-off Feb 2022 | 754 35th Av | revision to pa 2018-0206-0470 & 2018-0502-7988 minor layout change bedroom closetDetails
revision to pa 2018-0206-0470 & 2018-0502-7988 minor layout change bedroom closet | |
| May 16, 2019 | Completed final sign-off Feb 2020 | 44 Leland Av | install powered door operator at laundry for accessible business entry.Details
install powered door operator at laundry for accessible business entry. | $2,000 |
| Apr 23, 2019 | Completed final sign-off Aug 2019 | 590 Sutter St | repair storefront marble at bulkhead and (1) storefront glass window in-kind. (on mason st side)Details
repair storefront marble at bulkhead and (1) storefront glass window in-kind. (on mason st side) | $25,000 |
| Apr 12, 2019 | Completed final sign-off Feb 2020 | 339 College Av | ground fl only replace (e) deterorated footing with new at living area & portion of footing at gargar area. remove 1 post at garage area and replace (e) wood beam with a new steel beamDetails
ground fl only replace (e) deterorated footing with new at living area & portion of footing at gargar area. remove 1 post at garage area and replace (e) wood beam with a new steel beam | $30,000 |
| Apr 5, 2019 | Completed final sign-off Dec 2019 | 1142 Washington St | soft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential)Details
soft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential) | $200,000 |
| Feb 22, 2019 | Completed final sign-off Apr 2019 | 1400 Jones St | revision to pa 201609147687 & 201901251288 revised details at (e) concrete wall and steel beams.Details
revision to pa 201609147687 & 201901251288 revised details at (e) concrete wall and steel beams. | |
| Feb 22, 2019 | Completed final sign-off Jul 2019 | 1533 15th St | revision to pa 201707101443. relocate plywood shear walls at 1st flrDetails
revision to pa 201707101443. relocate plywood shear walls at 1st flr | |
| Jan 28, 2019 | Completed final sign-off Jan 2019 | 5826 Geary Bl | rev to pa# 201707273061; to eliminate level landing and modify sidewalk permit requirements and construct automatic door opener per instruction on dwp inspector.Details
rev to pa# 201707273061; to eliminate level landing and modify sidewalk permit requirements and construct automatic door opener per instruction on dwp inspector. | |
| Jan 25, 2019 | Completed final sign-off Apr 2019 | 1400 Jones St | revision to pa 201609147687. relocate steel moment frames and revised details.Details
revision to pa 201609147687. relocate steel moment frames and revised details. | |
| Dec 3, 2018 | Completed final sign-off Apr 2019 | 1455 Leavenworth St | revision to pa 2016-0914-7688 (soft story) - replacce plywood hsear wall with steel moment frame. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
revision to pa 2016-0914-7688 (soft story) - replacce plywood hsear wall with steel moment frame. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $5,000 |
| Nov 27, 2018 | Completed final sign-off Jan 2019 | 1336 Green St | revision to app#201709158562. relocate plywood shear walls and new concrete footings.Details
revision to app#201709158562. relocate plywood shear walls and new concrete footings. | |
| Nov 7, 2018 | Completed final sign-off Jan 2019 | 1325 Mason St | add 2 ada bathrooms on the 1st fl.Details
add 2 ada bathrooms on the 1st fl. | $40,000 |
| Oct 29, 2018 | Completed final sign-off Dec 2020 | 566 Lombard St | at existing apartment unit #7: remodel existing non-load bearing walls; change entry door location and side windows; replace & reconfigure porch window & roof; dry rot repairs under unit & porch- required to meet sffc 1103.7.6.1 for fire alarm sounders through out buildingDetails
at existing apartment unit #7: remodel existing non-load bearing walls; change entry door location and side windows; replace & reconfigure porch window & roof; dry rot repairs under unit & porch- required to meet sffc 1103.7.6.1 for fire alarm sounders through out building | $75,000 |
| Oct 5, 2018 | Completed final sign-off May 2021 | 100 Shotwell St | soft storyretrofit ground level only per 2016iebc appendix a-kDetails
soft storyretrofit ground level only per 2016iebc appendix a-k | $160,000 |
| Sep 14, 2018 | Completed final sign-off Mar 2021 | 558 Broadway | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 appendix a4 commercial only. ref residential pa #201809140290Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 appendix a4 commercial only. ref residential pa #201809140290 | $40,000 |
| Sep 14, 2018 | Completed final sign-off Feb 2024 | 2500 Fillmore St | residential only soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commercial pa #201809140371)Details
residential only soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commercial pa #201809140371) | $60,000 |
| Sep 14, 2018 | Completed final sign-off Jul 2024 | 1501 Hyde St | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140362.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140362. | $80,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2022 | 1600 Vallejo St | commercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $40,000 |
| Sep 14, 2018 | Completed final sign-off Jul 2024 | 1501 Hyde St | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140363.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140363. | $40,000 |
| Sep 14, 2018 | Completed final sign-off Apr 2025 | 1551 Mission St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0249Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0249 | $37,848 |
| Sep 14, 2018 | Completed final sign-off Oct 2022 | 1600 Vallejo St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |