Wk Construction Inc
- Based in
- Albany
- On San Francisco permits
- Oct 2016 to May 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2022 | Completed final sign-off Jul 2022 | 1482 23rd Av | convert 1 full bathroom into 2 full bathrooms.Details
convert 1 full bathroom into 2 full bathrooms. | $20,000 |
| May 17, 2022 | Completed final sign-off Aug 2025 | 2762 Filbert St | foundation upgradeDetails
foundation upgrade | $55,000 |
| Jan 25, 2021 | Completed final sign-off Aug 2021 | 54 Stanyan St | unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street.Details
unit #56: remodel kitchen, 1 full bathroom, powder room with new cabinets, fixtures & finish. add recessed led light fixtures throuthout. replace (e) windows not visible from street. | $42,000 |
| Oct 27, 2020 | Completed final sign-off Jun 2021 | 78 Cotter St | remodel kitchen with new cabinets, counter tops, plumbing and lighting fixtures, and finishes.Details
remodel kitchen with new cabinets, counter tops, plumbing and lighting fixtures, and finishes. | $20,000 |
| Oct 7, 2020 | Completed final sign-off Dec 2020 | 789 Buena Vista Ave West Av | remodel 1 full bath in 102 2nd fl replace toilet, lavatgory and fixtures with newDetails
remodel 1 full bath in 102 2nd fl replace toilet, lavatgory and fixtures with new | $10,000 |
| Oct 7, 2020 | Completed final sign-off Dec 2020 | 2327 39th Av | remodel kitchen with new cabinets, counter tops and fixturesDetails
remodel kitchen with new cabinets, counter tops and fixtures | $13,000 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 162 Carl St | street spaceDetails
street space | |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 1829 Fulton St | kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath)Details
kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath) | $43,000 |
| Oct 4, 2019 | Completed final sign-off May 2020 | 678 09th Av | revision to pa 2017-0914-8099 - replace brick footings under structural with concrete.Details
revision to pa 2017-0914-8099 - replace brick footings under structural with concrete. | $6,000 |
| Feb 8, 2019 | Completed final sign-off Mar 2019 | 105 Joost Av | repair damaged exterior stucco wall next to garage door. approx. 30" l x 7 ft high.Details
repair damaged exterior stucco wall next to garage door. approx. 30" l x 7 ft high. | $8,500 |
| Jan 4, 2019 | Completed final sign-off May 2020 | 110 15th Av | build new deck at family room at second flr level.Details
build new deck at family room at second flr level. | $15,000 |
| Apr 17, 2018 | Completed final sign-off Oct 2018 | 20 San Antonio Pl | unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/dDetails
unit 2b: rehabilite (e) kitchen, & (e) bathroom. install w/d | $37,000 |
| Sep 14, 2017 | Completed final sign-off May 2020 | 678 09th Av | seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4.Details
seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4. | $25,000 |
| Oct 31, 2016 | Completed final sign-off Jan 2023 | 162 Carl St | demolish (e) rear extension on 1st & 2nd flrs; rebuild (e) internal stair; remodel 3rd flr bath, closets & master bdrm; horizontal addition on three flrs.Details
demolish (e) rear extension on 1st & 2nd flrs; rebuild (e) internal stair; remodel 3rd flr bath, closets & master bdrm; horizontal addition on three flrs. | $350,000 |