Wing Cheung Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Aug 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 3906 Mission St | residential only. comply w/ mandatory soft story program per sfebc chapter 4-d. 2016 cebc a-4.Details
residential only. comply w/ mandatory soft story program per sfebc chapter 4-d. 2016 cebc a-4. | $20,000 |
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 3910 Mission St | commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom.Details
commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom. | $60,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 2088 Mission St | barrier removal work only, increase restroom size in salon to meet handicap requirements; relocate (e) restroom sink; replace toilet; install ceiling fan in restroom; relocate restroom lightDetails
barrier removal work only, increase restroom size in salon to meet handicap requirements; relocate (e) restroom sink; replace toilet; install ceiling fan in restroom; relocate restroom light | $1,050 |
| Mar 12, 2018 | Expired or cancelled cancelled Apr 2018 | 2088 Mission St | administrative change to correct address to 2088 mission st on pa# 201703091041Details
administrative change to correct address to 2088 mission st on pa# 201703091041 | |
| Feb 20, 2018 | Expired or cancelled withdrawn Mar 2018 | 2090 Mission St | admin revision to 201703091041 soft story & increase restroom size in beauty shop tp meet handicap reqs. relocate (e) restroom sink, replace toilet, install ceiling fan in restroom, relocate restroom lightDetails
admin revision to 201703091041 soft story & increase restroom size in beauty shop tp meet handicap reqs. relocate (e) restroom sink, replace toilet, install ceiling fan in restroom, relocate restroom light | $1,050 |
| Mar 9, 2017 | Completed final sign-off Apr 2018 | 2090 Mission St | soft story seismic retrofit- residentialDetails
soft story seismic retrofit- residential | $20,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2018 | 2090 Mission St | soft story seismic retrofit- commercialDetails
soft story seismic retrofit- commercial | $40,000 |
| Jul 8, 2016 | Completed final sign-off Sep 2016 | 418 25th Av | soft story seismic retrofitDetails
soft story seismic retrofit | $35,000 |
| Feb 3, 2016 | Completed final sign-off May 2016 | 2615 24th St | revision of shear walls location. ref. to pa#201506239666. n/a ordinance #155-13Details
revision of shear walls location. ref. to pa#201506239666. n/a ordinance #155-13 | |
| Jun 23, 2015 | Completed final sign-off Apr 2016 | 147 Lexington St | remove existing siding and replaceDetails
remove existing siding and replace | $4,000 |
| Jun 23, 2015 | Completed final sign-off Apr 2016 | 147 Lexington St | soft story seismic retrofit adding plywood to basement walls. remove and replace siding at front wallDetails
soft story seismic retrofit adding plywood to basement walls. remove and replace siding at front wall | $30,000 |
| Jun 23, 2015 | Completed final sign-off May 2016 | 2615 24th St | soft story seismic retrofit adding plywood and holdowns to 1st flDetails
soft story seismic retrofit adding plywood and holdowns to 1st fl | $25,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 207 Valencia St | seismic retrofitting- add anchor bolts & plywood sheathing at the 2 property-line walls; soft story : 2012 iebc appendix a-4 ;maher n/aDetails
seismic retrofitting- add anchor bolts & plywood sheathing at the 2 property-line walls; soft story : 2012 iebc appendix a-4 ;maher n/a | $4,000 |
| Oct 16, 2013 | Completed final sign-off Aug 2014 | 1788 32nd Av | change of use from grocery store to cafe. interior remodeling, electrical, plumbing.Details
change of use from grocery store to cafe. interior remodeling, electrical, plumbing. | $10,000 |
| Aug 17, 2011 | Completed final sign-off Mar 2012 | 4018 Mission St | to comply with nov# 201148887 dated july 4, 2011. repair and remodel fire damage building. replace interior sheet rock and all floors. replace all damage windows and doors. rebuild fire damaged walls, floors joists and plywood, subfloor on second floor. add 1/2 bathroom and 1 bdrm on 2nd and 3rd flrDetails
to comply with nov# 201148887 dated july 4, 2011. repair and remodel fire damage building. replace interior sheet rock and all floors. replace all damage windows and doors. rebuild fire damaged walls, floors joists and plywood, subfloor on second floor. add 1/2 bathroom and 1 bdrm on 2nd and 3rd flr | $150,000 |
| Jul 20, 2011 | Completed final sign-off Mar 2012 | 4018 Mission St | shoring design for existing structure damaged by fireDetails
shoring design for existing structure damaged by fire | $4,000 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 5238 Diamond Heights Bl | remove e parition wall within e office area at 2nd flDetails
remove e parition wall within e office area at 2nd fl | $15,000 |
| Nov 22, 2010 | Completed final sign-off Nov 2010 | 2090 Mission St | to comply with nov # 201079026. provide handrails at main stairs at all three floors; handrail to comply with 1012 and 1009 sfbc, height to be 34 to 38 min size of gripable area, 1.25 to 2 inch, provide hand rail extension 12 beyond top riser and @ bottomDetails
to comply with nov # 201079026. provide handrails at main stairs at all three floors; handrail to comply with 1012 and 1009 sfbc, height to be 34 to 38 min size of gripable area, 1.25 to 2 inch, provide hand rail extension 12 beyond top riser and @ bottom | $200 |
| Jul 1, 2010 | Completed final sign-off Aug 2010 | 5238 Diamond Heights Bl | revision to pa# 2010.03.15.8258. change (e) ceiling to gyp bd at 2nd fl. reconfigure men's and women's restroom per plan at 2nd flDetails
revision to pa# 2010.03.15.8258. change (e) ceiling to gyp bd at 2nd fl. reconfigure men's and women's restroom per plan at 2nd fl | $4,000 |
| Mar 15, 2010 | Completed final sign-off Aug 2010 | 5238 Diamond Heights Bl | tenant improvement for (e) restaurant at 2nd. flr. remodel (e) kitch replace (e) hood & cooking equipment, sinks. replace (e) clg. system. replace (e) wet bar per plan. reconfigure (e) men's & women's restrooms per plan replace entry doors. occupant load verification for fire p-142 assembly permit.Details
tenant improvement for (e) restaurant at 2nd. flr. remodel (e) kitch replace (e) hood & cooking equipment, sinks. replace (e) clg. system. replace (e) wet bar per plan. reconfigure (e) men's & women's restrooms per plan replace entry doors. occupant load verification for fire p-142 assembly permit. | $110,000 |
| Feb 24, 2009 | Completed final sign-off May 2009 | 230 Leland Av | revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor.Details
revision to pa #200901059529 to remove existing wood stair in lightwell & construct a hallway to rear yard, relocate full bathroom to left side of family on ground floor. | |
| Oct 16, 2008 | Completed final sign-off Sep 2012 | 1 Estero Av | vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor.Details
vertical & horizontal addition - add one new level on (e) one level bldg. remodel first floor. add a new stair & a half bathroom on basement and enlarge basement floor. | $300,000 |
| Oct 23, 2003 | Completed final sign-off Nov 2004 | 1931 21st Av | rear addition, interior remodel horizontal additionDetails
rear addition, interior remodel horizontal addition | $100,000 |