William A Larson Builder
- Based in
- Novato
- On San Francisco permits
- Jul 2009 to Mar 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2013 | Completed final sign-off Jun 2013 | 1593 Mcallister St | #206, #306- demo & replace sheetrock @ wall heater flues in residential units.Details
#206, #306- demo & replace sheetrock @ wall heater flues in residential units. | $3,000 |
| Jan 7, 2013 | Never finaled issued Jan 2013, no final | 201 El Camino Del Mar | repair and replace upper floor decking and waterproofing repair & repl existing shingles less than 50% of project, repair in kind less than 50% of deck structureDetails
repair and replace upper floor decking and waterproofing repair & repl existing shingles less than 50% of project, repair in kind less than 50% of deck structure | $15,000 |
| Sep 6, 2012 | Completed final sign-off Dec 2012 | 305 Juanita Wy | bathroom repair and remodel.top floor living level. add fan, vent to outside/roof, 3' (bldg opening), add fluorescent lighting, in kind window replacement max u factor 0.40 (not visible to the street)Details
bathroom repair and remodel.top floor living level. add fan, vent to outside/roof, 3' (bldg opening), add fluorescent lighting, in kind window replacement max u factor 0.40 (not visible to the street) | $15,000 |
| Apr 15, 2010 | Never finaled filed Apr 2010, never issued | 138 25th Av | valuation increase of additional $300,000 for scope of work per inspector's instructions.Details
valuation increase of additional $300,000 for scope of work per inspector's instructions. | $300,000 |
| Aug 26, 2009 | Never finaled issued Aug 2009, no final | 144 25th Av | underpinning.Details
underpinning. | $80,000 |
| Jul 1, 2009 | Completed final sign-off Sep 2009 | 379 20th Av | cut holes for ductwork, framing non-bearing walls to enclose ductwork, repair sheetrock, trim. 1-hr. shaft(5/8" type "x" gyp. bd.)Details
cut holes for ductwork, framing non-bearing walls to enclose ductwork, repair sheetrock, trim. 1-hr. shaft(5/8" type "x" gyp. bd.) | $8,700 |