Westsun Electric Company
- Based in
- Santa Clara
- On San Francisco permits
- Mar 2006 to Mar 2006
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2006 | Expired or cancelled expired Aug 2007 | 728 Ashbury St | electric water heaters (3 units) have been installed to replace (e) gas water heater. plumbing inspection was conducted & approved. electric water heater replaced gas water heater in same location. at ground level room.Details
electric water heaters (3 units) have been installed to replace (e) gas water heater. plumbing inspection was conducted & approved. electric water heater replaced gas water heater in same location. at ground level room. | $3,000 |