Welch Construction
- Based in
- Castro Valley
- On San Francisco permits
- Jun 2013 to Jun 2023
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2023 | Completed final sign-off Oct 2025 | 3340 Washington St | build a residential elevator in existing light wellDetails
build a residential elevator in existing light well | $150,000 |
| Sep 25, 2017 | Completed final sign-off Aug 2019 | 3340 Washington St | main floor of house: install (n) openings (2) in (e) load-bearing wall on study room & dining room.Details
main floor of house: install (n) openings (2) in (e) load-bearing wall on study room & dining room. | $20,000 |
| Apr 4, 2016 | Completed final sign-off Aug 2019 | 3340 Washington St | remodel kitchen and two bathrooms. replace flooring cabinets, plumbing fixtures, appliances, tile, upgrade lighting.Details
remodel kitchen and two bathrooms. replace flooring cabinets, plumbing fixtures, appliances, tile, upgrade lighting. | $125,000 |
| Jan 21, 2016 | Completed final sign-off Sep 2016 | 120 Seacliff Av | remodel kitchen, new cabinets & countertops, update lighting and plumbing, add a new sink. remodel bathrooms with new tiles, fixtures, vanity & countertops.Details
remodel kitchen, new cabinets & countertops, update lighting and plumbing, add a new sink. remodel bathrooms with new tiles, fixtures, vanity & countertops. | $150,000 |
| Oct 30, 2013 | Completed final sign-off Sep 2014 | 130 Seacliff Av | add structural details per soha engineer's plans dated july 16, 2013Details
add structural details per soha engineer's plans dated july 16, 2013 | $12,480 |
| Jun 5, 2013 | Completed final sign-off Sep 2014 | 130 Seacliff Av | exploratory demolition as per drawings for future interior works.Details
exploratory demolition as per drawings for future interior works. | $1,000 |