Welch Construction
- Based in
- Placerville
- On San Francisco permits
- Jun 2014 to Jul 2014
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2014 | Expired or cancelled cancelled Jul 2014 | 2002 Pacific Av | repair wood deck less than 50% in kind, remove and replace dry rot wood boards as needed (rear deck)Details
repair wood deck less than 50% in kind, remove and replace dry rot wood boards as needed (rear deck) | $2,400 |
| Jun 12, 2014 | Completed final sign-off Jul 2014 | 650 Delancey St | remove & replace (e) skylight in-kind. no alterations to openings. reinstall operational skylight. flue terminations w/in 10 feet of opening must extend 36" minimum above opening.Details
remove & replace (e) skylight in-kind. no alterations to openings. reinstall operational skylight. flue terminations w/in 10 feet of opening must extend 36" minimum above opening. | $1,800 |