Weese Construction
- Based in
- Turlock
- On San Francisco permits
- Jan 2019 to Feb 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 482 Alvarado St | rehabilitate 2 bathrooms. replace tilem vanity sink, replace toilets and run electrical to fireplace. in kind.Details
rehabilitate 2 bathrooms. replace tilem vanity sink, replace toilets and run electrical to fireplace. in kind. | $20,000 |
| Jan 25, 2019 | Completed final sign-off May 2019 | 167 Maywood Dr | relocate kitchen sink, relocate electrical switches and plugs. remove dividing wall.Details
relocate kitchen sink, relocate electrical switches and plugs. remove dividing wall. | $26,000 |