Water Damage Solutions Inc
- Based in
- Fremont
- On San Francisco permits
- Nov 2025 to Apr 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2026 | Completed final sign-off Jun 2026 | 720 Fell St | unit #4: revision to building permit #202603278464. in master bathroom, convert tub to prefab shower and replacing two outlet with gfci. replace tub in hallway bath. two bathrooms remodel.Details
unit #4: revision to building permit #202603278464. in master bathroom, convert tub to prefab shower and replacing two outlet with gfci. replace tub in hallway bath. two bathrooms remodel. | $37,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 141 Robinhood Dr | replace drywall, replace flooring in home, all work is interior. due to water damage.Details
replace drywall, replace flooring in home, all work is interior. due to water damage. | $35,000 |
| Mar 27, 2026 | Completed final sign-off Jun 2026 | 720 Fell St | unit 4: repairing drywall insulation in bathroom. had to remove toilet to fix insulation. putting toilet back like for like. no plumbing work to be done.Details
unit 4: repairing drywall insulation in bathroom. had to remove toilet to fix insulation. putting toilet back like for like. no plumbing work to be done. | $37,000 |
| Nov 14, 2025 | Completed final sign-off Mar 2026 | 755 Monterey Bl | water damage, dry wall repair, replace carpets, bathroom tile install, kitchen cabinet install, painting and trim install. in kind.Details
water damage, dry wall repair, replace carpets, bathroom tile install, kitchen cabinet install, painting and trim install. in kind. | $239,000 |