Walsh Construction
- Based in
- Costa Mesa
- On San Francisco permits
- Jul 2004 to Apr 2014
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 1160 Mission St | #908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13Details
#908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13 | $55,000 |
| Feb 20, 2014 | Completed final sign-off Mar 2016 | 331 Panorama Dr | convert part of garage into master bath. relocate entry within extg stair enclosure and reconfigure interior stairs. replace footings to extg interior columns. new concrete slab at lower level.Details
convert part of garage into master bath. relocate entry within extg stair enclosure and reconfigure interior stairs. replace footings to extg interior columns. new concrete slab at lower level. | $106,000 |
| Nov 20, 2013 | Completed final sign-off Feb 2014 | 331 Panorama Dr | remodel (e) bathroom- relocate toilet, move (e) non-bearing wall; replace and reconfigure bathroom window not visible from street.Details
remodel (e) bathroom- relocate toilet, move (e) non-bearing wall; replace and reconfigure bathroom window not visible from street. | $20,000 |
| Aug 12, 2013 | Completed final sign-off Jul 2014 | 930 Noriega St | new exterior finishes at facade, new steel post, and new windows in existing openings. new gas fireplace.Details
new exterior finishes at facade, new steel post, and new windows in existing openings. new gas fireplace. | $50,000 |
| Mar 8, 2013 | Completed final sign-off May 2013 | 674 Clarendon Av | replace existing cabinets with new. put in new lighting fixtures, new plumbing fixtures & new appliances. no structural workDetails
replace existing cabinets with new. put in new lighting fixtures, new plumbing fixtures & new appliances. no structural work | $30,000 |
| May 27, 2011 | Completed final sign-off Sep 2011 | 930 Noriega St | replace cabinets, electrical & plumbing @ kitchen. add door to kitchen, replace (e) exterior doors & window at lightwell, new window @ lightwell, not visible to street.Details
replace cabinets, electrical & plumbing @ kitchen. add door to kitchen, replace (e) exterior doors & window at lightwell, new window @ lightwell, not visible to street. | $20,000 |
| Dec 10, 2009 | Completed final sign-off Feb 2010 | 146 Sears St | replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work.Details
replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work. | $5,000 |
| Nov 12, 2009 | Completed final sign-off Nov 2009 | 300 Beale St | replace damaged sheetrock on ceiling in office/loft area.Details
replace damaged sheetrock on ceiling in office/loft area. | $4,000 |
| Sep 16, 2009 | Completed final sign-off Apr 2010 | 3701 Clement St | remove (e) non-bearing walls and replace with new. replace (e) 3 windows. replace (e) cabinets and appliances with new. new kitchen lighting and new finishes.Details
remove (e) non-bearing walls and replace with new. replace (e) 3 windows. replace (e) cabinets and appliances with new. new kitchen lighting and new finishes. | $50,000 |
| Jul 2, 2009 | Completed final sign-off Jul 2009 | 1012 Scott St | buttress existing foundation along east and south wall per drawingDetails
buttress existing foundation along east and south wall per drawing | $8,832 |
| Jun 10, 2009 | Completed final sign-off Oct 2009 | 15 Gladeview Wy | remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den.Details
remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den. | $30,000 |
| May 18, 2009 | Completed final sign-off Jun 2009 | 301 Folsom St | replace damaged insulation & sheetrock, cabinets. paint new sheetrock. all work at unit #404.Details
replace damaged insulation & sheetrock, cabinets. paint new sheetrock. all work at unit #404. | $28,000 |
| Apr 27, 2009 | Expired or cancelled expired Jun 2010 | 476 Diamond St | refer/revision to pa #200608230294s1 & #200801253306, proposed spiral staircase remove from scope of work and upper deck shortened to line up w/ building.Details
refer/revision to pa #200608230294s1 & #200801253306, proposed spiral staircase remove from scope of work and upper deck shortened to line up w/ building. | |
| Mar 27, 2009 | Expired or cancelled expired Apr 2011 | 3441 26th St | renew pa# 2008/04/29/0889 to obtain final inspection. all work has been completed.Details
renew pa# 2008/04/29/0889 to obtain final inspection. all work has been completed. | |
| Mar 24, 2009 | Expired or cancelled expired May 2010 | 476 Diamond St | install new garage door same size opening as original door openingDetails
install new garage door same size opening as original door opening | $1,500 |
| Jul 3, 2008 | Completed final sign-off Nov 2008 | 71 Garcia Av | demolish & remodel kitchen, replace/move 2 windows and 1 door, repair outside wall, rebuild top portion of back stairs, remove non-load wall between dining room and kitchenDetails
demolish & remodel kitchen, replace/move 2 windows and 1 door, repair outside wall, rebuild top portion of back stairs, remove non-load wall between dining room and kitchen | $100,000 |
| Mar 31, 2008 | Completed final sign-off May 2008 | 18 Worth St | remodel existing 1 bathroom. new tub, toilet, sink, new tile,new plumbing fixtures. same location.Details
remodel existing 1 bathroom. new tub, toilet, sink, new tile,new plumbing fixtures. same location. | $23,000 |
| Jan 29, 2008 | Completed final sign-off Jun 2009 | 159 Middlefield Dr | horizontal addition of deck on 1st and 2nd level. addition of ground floor habitable space, interior remodeling, replacement of existing window and addition of some new windows. replace ex. roof with new roof.Details
horizontal addition of deck on 1st and 2nd level. addition of ground floor habitable space, interior remodeling, replacement of existing window and addition of some new windows. replace ex. roof with new roof. | $285,000 |
| Nov 2, 2007 | Completed final sign-off Mar 2008 | 146 Sears St | replace (e) single pane wood windows at front of house with new double pane wood windows to match (e). re-shingle front of house with new pre-painted shingles. replace (e) porch door with new door with sidelite. cut down (e) side walls of front steps & replace with open rail with turned newels &Details
replace (e) single pane wood windows at front of house with new double pane wood windows to match (e). re-shingle front of house with new pre-painted shingles. replace (e) porch door with new door with sidelite. cut down (e) side walls of front steps & replace with open rail with turned newels & | $8,000 |
| Aug 10, 2007 | Never finaled issued Aug 2007, no final | 660 02nd Av | replace (e) third floor window with new double glazed marvin clad windows, same size. remove (e) stucco, replace with shingles, add dental moulding at rake of roofDetails
replace (e) third floor window with new double glazed marvin clad windows, same size. remove (e) stucco, replace with shingles, add dental moulding at rake of roof | $1,500 |
| Jun 15, 2007 | Completed final sign-off Aug 2007 | 300 Beale St | replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural.Details
replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural. | $13,000 |
| Jun 15, 2007 | Completed final sign-off Jul 2007 | 146 Sears St | replace existing windows (sashes)with new insert windows at the back of the house (10) total same size and location.Details
replace existing windows (sashes)with new insert windows at the back of the house (10) total same size and location. | $3,000 |
| Jun 1, 2007 | Completed final sign-off Jun 2007 | 930 Noriega St | renew pa# 200606305482 for final inspectionDetails
renew pa# 200606305482 for final inspection | |
| Jan 22, 2007 | Completed final sign-off May 2007 | 40 Tulane St | renew pa#2006058109158 for final inspection.Details
renew pa#2006058109158 for final inspection. | |
| Jan 22, 2007 | Completed final sign-off May 2007 | 46 Tulane St | renew pa#2006058109159 for final inspection.Details
renew pa#2006058109159 for final inspection. | |
| Oct 27, 2006 | Completed final sign-off Jun 2007 | 930 Noriega St | conversion of (e) storage space to office. enlarging (e) windows and adding new windows on east wall to satisfy light & ventilation required. adding outlets & lights.Details
conversion of (e) storage space to office. enlarging (e) windows and adding new windows on east wall to satisfy light & ventilation required. adding outlets & lights. | $10,000 |
| Aug 10, 2006 | Expired or cancelled expired Oct 2007 | 40 Tulane St | replacement opf all windows on occupied level. 5 total. 2 at front in kind. aluminium to wood cladDetails
replacement opf all windows on occupied level. 5 total. 2 at front in kind. aluminium to wood clad | $5,000 |
| Aug 10, 2006 | Expired or cancelled expired Jul 2007 | 46 Tulane St | replacement of front (2) windows in kind. aluminum to wood clad.Details
replacement of front (2) windows in kind. aluminum to wood clad. | $2,000 |
| Jun 30, 2006 | Expired or cancelled expired Jan 2008 | 930 Noriega St | addition of new retaining wall and lowering of nerw slab behind existing garage. deletioin of grade beam at garage dsur & surar wall from voluntary sesmic upgrade. permit 200604128802, which is a renewal of 20508301574. original work 200303260740Details
addition of new retaining wall and lowering of nerw slab behind existing garage. deletioin of grade beam at garage dsur & surar wall from voluntary sesmic upgrade. permit 200604128802, which is a renewal of 20508301574. original work 200303260740 | |
| Feb 13, 2006 | Completed final sign-off Jun 2006 | 331 Panorama Dr | remodel kitchen new cabs/new windows at side, new plumbing, electrical.Details
remodel kitchen new cabs/new windows at side, new plumbing, electrical. | $30,000 |
| Nov 7, 2005 | Completed final sign-off Dec 2005 | 146 Sears St | reroof house strip existing shingles off roof & install new shingles asphautlDetails
reroof house strip existing shingles off roof & install new shingles asphautl | $8,000 |
| Oct 7, 2005 | Completed final sign-off Sep 2006 | 301 Folsom St | remodel 2 baths, new tub,sins, shower,plumb fix, cntrtps. new elec, shtrk,painting. no structural work, provide fl lightingDetails
remodel 2 baths, new tub,sins, shower,plumb fix, cntrtps. new elec, shtrk,painting. no structural work, provide fl lighting | $10,000 |
| Jul 26, 2005 | Completed final sign-off Dec 2005 | 1458 24th Av | revision to pa 200506215602, m=new stgs at perimeter of one story & two story additions.Details
revision to pa 200506215602, m=new stgs at perimeter of one story & two story additions. | $10,000 |
| Jun 21, 2005 | Completed final sign-off Dec 2005 | 1458 24th Av | kitchen and bath remodel, level floors, rebuild (e) deckDetails
kitchen and bath remodel, level floors, rebuild (e) deck | $60,000 |
| Jan 31, 2005 | Completed final sign-off Jun 2005 | 300 Beale St | install new tile countertops & hardwood cap and hardwood bartop/install new sink & disposalDetails
install new tile countertops & hardwood cap and hardwood bartop/install new sink & disposal | $10,000 |
| Jul 13, 2004 | Completed final sign-off Nov 2004 | 3561 Sacramento St | top unit hardwood floors in two back bedrms + hallway tobe replaced.need to replace subfloor. middelDetails
top unit hardwood floors in two back bedrms + hallway tobe replaced.need to replace subfloor. middel | $60,000 |