Walker Construction**See Note***
- Based in
- San Pablo
- On San Francisco permits
- Jul 2004 to Sep 2004
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2004 | Completed final sign-off Mar 2005 | 70 Sanchez St | add toilet in existing bathroom. relocate door to bath. add sink in toilet room. work to be doneDetails
add toilet in existing bathroom. relocate door to bath. add sink in toilet room. work to be done | $8,000 |
| Jul 15, 2004 | Completed final sign-off Mar 2005 | 70 Sanchez St | add toilet in (e) bathroom. relocate door to bath. general cosmetic remodeling. work to be done onlyDetails
add toilet in (e) bathroom. relocate door to bath. general cosmetic remodeling. work to be done only | $15,000 |