Wah Wong Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to Aug 2026
- Last 24 months
- 5 permits filed
44 permits since 2000: 37 completed, 3 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 2358 Lombard St | work in rooms #105, 106, 107, 108, 109. bathroom repair leaks, replace in kind. repair tiles work after plumbing work. ref. to the plumbing # pw20260829666.Details
work in rooms #105, 106, 107, 108, 109. bathroom repair leaks, replace in kind. repair tiles work after plumbing work. ref. to the plumbing # pw20260829666. | $8,000 |
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 2358 Lombard St | rooms 114,115,116,117,118: bathroom repair leaks, replace in kind, repair tiles, plumbing permit has been pulled separately.Details
rooms 114,115,116,117,118: bathroom repair leaks, replace in kind, repair tiles, plumbing permit has been pulled separately. | $8,000 |
| Feb 24, 2026 | Completed final sign-off May 2026 | 2358 Lombard St | bathroom repair - repair leaks, replace tubs in kind, repair tile work after plumbing work under pw20260224867.all work kind for room#119, 120, 121, 122,123Details
bathroom repair - repair leaks, replace tubs in kind, repair tile work after plumbing work under pw20260224867.all work kind for room#119, 120, 121, 122,123 | $8,000 |
| May 1, 2025 | Completed final sign-off Jan 2026 | 739 27th Av | repair and replace existing front stucco (500 sq ft) and repair and replace existing siding at rear (800 sq ft) to hardie plank siding.Details
repair and replace existing front stucco (500 sq ft) and repair and replace existing siding at rear (800 sq ft) to hardie plank siding. | $5,000 |
| Feb 10, 2025 | Completed final sign-off May 2025 | 545 Niagara Av | replace 9 existing windows visible from the street. aluminum/aluminum clad wood material; double hung. same size, same locations, max u-factor 0.30.Details
replace 9 existing windows visible from the street. aluminum/aluminum clad wood material; double hung. same size, same locations, max u-factor 0.30. | $8,000 |
| Sep 26, 2024 | Completed final sign-off Apr 2025 | 1369 Plymouth Av | add a new full bath with a new skylight at 2nd fl, infill 5 window openings. in kin ro remodel e ktichen and bath 2nd fl. in kind 2nd fl windows with dbl pane vinyl on both side and rear. replace with anderson alum clad wood in front. upgrade elec service to 200 amp, rewire whole houseDetails
add a new full bath with a new skylight at 2nd fl, infill 5 window openings. in kin ro remodel e ktichen and bath 2nd fl. in kind 2nd fl windows with dbl pane vinyl on both side and rear. replace with anderson alum clad wood in front. upgrade elec service to 200 amp, rewire whole house | $40,000 |
| Sep 9, 2024 | Completed final sign-off Oct 2024 | 301 18th Av | siding work: install one lay of hardie plank lap siding ontop of the existing siding around 1500 sq ft at rear.Details
siding work: install one lay of hardie plank lap siding ontop of the existing siding around 1500 sq ft at rear. | $15,000 |
| Sep 5, 2024 | Completed final sign-off Jun 2025 | 276 Seneca Av | add mech room, mug room, enlarge (e) full bath on 1/f. infill (e) light-well, relocate kitchen area, new master suite, like-to-like remodel common bathroom on 2/f. cosmetically remodel 2 bedroom & full bath w/ new lighting on 3/f.Details
add mech room, mug room, enlarge (e) full bath on 1/f. infill (e) light-well, relocate kitchen area, new master suite, like-to-like remodel common bathroom on 2/f. cosmetically remodel 2 bedroom & full bath w/ new lighting on 3/f. | $100,000 |
| Jul 31, 2024 | Completed final sign-off Oct 2024 | 146 Victoria St | replace/repair (e) stucco for the front building 500 sq ft.Details
replace/repair (e) stucco for the front building 500 sq ft. | $8,000 |
| Jul 24, 2024 | In progress issued Jul 2024 | 1711 Eucalyptus Dr | in-kind remodeling of 1 kitchen(s) in 2nd fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl installing gas line. | $5,000 |
| May 24, 2024 | Completed final sign-off Sep 2024 | 1467 32nd Av | replace windows in kind, replace kitchen in kind, upgrade electrical to code. minor renovation of existing bathroom into two bathrooms. windows to be replaced frmo wood to aluminum cladDetails
replace windows in kind, replace kitchen in kind, upgrade electrical to code. minor renovation of existing bathroom into two bathrooms. windows to be replaced frmo wood to aluminum clad | $60,000 |
| May 24, 2024 | In progress issued May 2024 | 470 25th Av | work for patching and repair, drywall at garage ceiling area after plumbing work. approx. 100 sq ft. patch with 5/8" type x sheet rock.Details
work for patching and repair, drywall at garage ceiling area after plumbing work. approx. 100 sq ft. patch with 5/8" type x sheet rock. | $1,000 |
| Apr 24, 2024 | Completed final sign-off May 2024 | 148 Wetmore St | repair back stair in kind less 50%. repair dryrot wood, damage railing and steps, painting stairs.Details
repair back stair in kind less 50%. repair dryrot wood, damage railing and steps, painting stairs. | $8,500 |
| Sep 7, 2023 | Completed final sign-off Jan 2025 | 1711 Eucalyptus Dr | interior remodel of existing 2 bathrooms and kitchen at 2nd flr as per plan.Details
interior remodel of existing 2 bathrooms and kitchen at 2nd flr as per plan. | $50,000 |
| Nov 4, 2022 | Completed final sign-off Dec 2023 | 753 Jackson St | (e) retail store t.i., response to health insp report. provide new mop sink, replace (e) handsink, (e) tankless hot water heater, replace shelving. new health application formsDetails
(e) retail store t.i., response to health insp report. provide new mop sink, replace (e) handsink, (e) tankless hot water heater, replace shelving. new health application forms | $2,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 862 38th Av | repair/replace stucco and dryrot in the front of the bldg. to comply with violation # 202179658 issued 7/15/21Details
repair/replace stucco and dryrot in the front of the bldg. to comply with violation # 202179658 issued 7/15/21 | $8,000 |
| Jun 11, 2021 | Completed final sign-off Mar 2022 | 1200 32nd Av | no structural work.repair & replace siding w/ haradie plank due to dry rot damage. 1600 sq ft irving side & back yard. repair & replace stucco @ the front bldg & lincoln way side due to dry rot damage 1600 sq ft.Details
no structural work.repair & replace siding w/ haradie plank due to dry rot damage. 1600 sq ft irving side & back yard. repair & replace stucco @ the front bldg & lincoln way side due to dry rot damage 1600 sq ft. | $45,000 |
| Mar 24, 2021 | Completed final sign-off Dec 2022 | 538 34th Av | nail siding on the right hand side of the building 1500 sq ft (balboa side). replace windows in the front of the building, same size.Details
nail siding on the right hand side of the building 1500 sq ft (balboa side). replace windows in the front of the building, same size. | $12,000 |
| Mar 24, 2021 | Completed final sign-off Mar 2022 | 1200 32nd Av | repair the exterior stair leak. install waterproof plastic and tiles on top of surface. visible.Details
repair the exterior stair leak. install waterproof plastic and tiles on top of surface. visible. | $3,000 |
| Mar 5, 2021 | Completed final sign-off May 2021 | 580 37th Av | add siding (hardie plank) at the rear of the bldg wall. 25x10 and the front right side of the wall 200 sq ft. not visible from street. no stucco replacement, no removal of structural sheathingDetails
add siding (hardie plank) at the rear of the bldg wall. 25x10 and the front right side of the wall 200 sq ft. not visible from street. no stucco replacement, no removal of structural sheathing | $6,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 175 Grand View Av | repair/replace exterior siding at side of rear approx 35 sq ft @ rear & side (north & south) w/ approx 25 sq ft. overall less than 50% repair/replace like-to-like to match w/ (e) condition & colorDetails
repair/replace exterior siding at side of rear approx 35 sq ft @ rear & side (north & south) w/ approx 25 sq ft. overall less than 50% repair/replace like-to-like to match w/ (e) condition & color | $5,000 |
| Mar 13, 2020 | Never finaled issued Jun 2020, no final | 591 Monterey Bl | comply with nov #201768302. restore as-built floor plan to existing approved floor plan per bpa #201110076332.Details
comply with nov #201768302. restore as-built floor plan to existing approved floor plan per bpa #201110076332. | $20,000 |
| Feb 13, 2020 | Completed final sign-off Jul 2023 | 370 02nd Av | replace non code compliant stair (interior) at all 3 lvls. provide (n) exterior stair per plans. minor interior remodel work at all levels, bath and kitchen renovation work, replacement of select windowsDetails
replace non code compliant stair (interior) at all 3 lvls. provide (n) exterior stair per plans. minor interior remodel work at all levels, bath and kitchen renovation work, replacement of select windows | $150,000 |
| Nov 12, 2019 | Completed final sign-off Mar 2020 | 2366 27th Av | repair siding and nail hardieplack siding @ rear of building. 650 sq.ft.Details
repair siding and nail hardieplack siding @ rear of building. 650 sq.ft. | $5,000 |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 370 02nd Av | demo fireplace and chimney at all 3 levels. demo level 2 bath and level 2 kitchen. demo/remove part of wall at level 2 kitchen to analyze possible structural and remove if possible. n/a for maherDetails
demo fireplace and chimney at all 3 levels. demo level 2 bath and level 2 kitchen. demo/remove part of wall at level 2 kitchen to analyze possible structural and remove if possible. n/a for maher | $2,000 |
| Jul 29, 2019 | Completed final sign-off Oct 2019 | 687 44th Av | remodel (e) kitchen & (e) bathroom. same location in kindDetails
remodel (e) kitchen & (e) bathroom. same location in kind | $16,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 175 Rolph St | voluntary structural strengthening at rear bldgDetails
voluntary structural strengthening at rear bldg | $10,000 |
| May 20, 2019 | Completed final sign-off Nov 2019 | 2791 16th St | 20% rule of ada expending for the seismic retrofit of soft story building under 201809180707Details
20% rule of ada expending for the seismic retrofit of soft story building under 201809180707 | $18,000 |
| May 3, 2019 | Completed final sign-off Jul 2019 | 1370 South Van Ness Av | correction to comply w/ complaint 201939571 & 201942671, including remodel/repair 10'x10' kitchen & 5'x8' bathroom for unit #201. drywall(5/8" type) for the garage area, light switch & outlet repair.Details
correction to comply w/ complaint 201939571 & 201942671, including remodel/repair 10'x10' kitchen & 5'x8' bathroom for unit #201. drywall(5/8" type) for the garage area, light switch & outlet repair. | $12,000 |
| Apr 9, 2019 | Completed final sign-off Jun 2019 | 302 20th Av | repair railings for the (3) stairs inside the buildingDetails
repair railings for the (3) stairs inside the building | $1,000 |
| Apr 9, 2019 | Completed final sign-off Jun 2019 | 275 Sweeny St | replace siding at the rear of the buildingDetails
replace siding at the rear of the building | $6,000 |
| Mar 5, 2019 | Completed final sign-off Nov 2019 | 2797 16th St | to comply w/ n.o.v 201809741. repair (e) damange store front entranceDetails
to comply w/ n.o.v 201809741. repair (e) damange store front entrance | $60,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 1850 40th Av | remodel (e) kitchen and bathroom at 1st flr.Details
remodel (e) kitchen and bathroom at 1st flr. | $20,000 |
| Jan 9, 2019 | Completed final sign-off Mar 2019 | 1679 40th Av | remodel existing kitchen . in kind. non structural.Details
remodel existing kitchen . in kind. non structural. | $5,000 |
| Jan 2, 2019 | Completed final sign-off Jun 2019 | 226 10th Av | repair the damaged stucco @ the front building (for the damage part only)Details
repair the damaged stucco @ the front building (for the damage part only) | $3,000 |
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 707 12th Av | widen driveway curb cut from 8'0" to 10'-0".Details
widen driveway curb cut from 8'0" to 10'-0". | $2,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2018 | 1226 Ortega St | legalize work on 2nd floor enclose side deck & convert space to home office use. relocate kitchen. new bath in bedroomDetails
legalize work on 2nd floor enclose side deck & convert space to home office use. relocate kitchen. new bath in bedroom | $40,000 |
| Oct 20, 2017 | Completed final sign-off Dec 2017 | 716 07th Av | the replacement of three existing windows on the upper floor with new aluminum clad wood windows to match in size, location, and operation.Details
the replacement of three existing windows on the upper floor with new aluminum clad wood windows to match in size, location, and operation. | $5,000 |
| Sep 6, 2017 | Completed final sign-off Oct 2017 | 515 05th Av | install hardie plank siding at the rear wall of the building, around 1000 sq ft. repair the existing rear stair in kind, less 50%Details
install hardie plank siding at the rear wall of the building, around 1000 sq ft. repair the existing rear stair in kind, less 50% | $20,000 |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 707 12th Av | replace windows in front (9 total) in kind. marvin aluminum-clad wood. grid patterns to match. repair stucco surrrounding windows.Details
replace windows in front (9 total) in kind. marvin aluminum-clad wood. grid patterns to match. repair stucco surrrounding windows. | $4,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 707 12th Av | revision to permit 201102251006. interior layout changes on second floor. no changes to strctural.Details
revision to permit 201102251006. interior layout changes on second floor. no changes to strctural. | |
| Jun 19, 2017 | Completed final sign-off Sep 2017 | 742 07th Av | add hardie plank siding to the existing lightwell 150 sq ft.Details
add hardie plank siding to the existing lightwell 150 sq ft. | $2,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2017 | 539 20th Av | replace siding @ the rear of the building. replace in kingDetails
replace siding @ the rear of the building. replace in king | $3,000 |
| Apr 21, 2017 | Completed final sign-off Jul 2018 | 210 Divisadero St | soft story seismic retrofit per chapter 4d. install shear walls and moment frames per 2016 cebc appendix a-4. n/a for maherDetails
soft story seismic retrofit per chapter 4d. install shear walls and moment frames per 2016 cebc appendix a-4. n/a for maher | $65,000 |