W M B Financial Solutions Dba Wmb Gen
- Based in
- Oakland
- On San Francisco permits
- Apr 2015 to Apr 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 4 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 30 Sanchez St | remove minimal exterior concrete slab on grade at south side of building adjacent to property line, area not to exceed 4'x15' for electrical conduit upgrade, trench will be backfill and pour back with concrete to match existing. portion of slab replacement will be visible from street.Details
remove minimal exterior concrete slab on grade at south side of building adjacent to property line, area not to exceed 4'x15' for electrical conduit upgrade, trench will be backfill and pour back with concrete to match existing. portion of slab replacement will be visible from street. | $7,000 |
| Jun 21, 2016 | Expired or cancelled cancelled May 2017 | 3518 Webster St | demo kitchen & install new cabinets, update all switches, outlets, as needed. some plumbing replace stop valves, no walls moved removed, added or infilled.all (e) layouts to reamin unchangedDetails
demo kitchen & install new cabinets, update all switches, outlets, as needed. some plumbing replace stop valves, no walls moved removed, added or infilled.all (e) layouts to reamin unchanged | $20,000 |
| Jun 21, 2016 | Completed final sign-off Dec 2016 | 192 Noe St | demo kitchen, & instlal new cabinets, update al lswitches outlets as neede, some plumbing replace stop vallve, no wall moved, removed added or infilled. all (e) layouts to reamin unchangedDetails
demo kitchen, & instlal new cabinets, update al lswitches outlets as neede, some plumbing replace stop vallve, no wall moved, removed added or infilled. all (e) layouts to reamin unchanged | $20,000 |
| Jun 21, 2016 | Completed final sign-off Sep 2016 | 752 Shotwell St | demo kitchen & install new cabinets ,update all switches, outlets, as needed, some plumbing replace stop valves, no walls moved, removed added or infilled, all (e) layouts to remain unchanged. all in unit # 3Details
demo kitchen & install new cabinets ,update all switches, outlets, as needed, some plumbing replace stop valves, no walls moved, removed added or infilled, all (e) layouts to remain unchanged. all in unit # 3 | $20,000 |
| Jun 2, 2016 | Never finaled issued Aug 2016, no final | 449 Panorama Dr | demo existing kitchen, install new cabinets, lighting, skylight, switches, outlets, plumbing, range hood. remove non loadbearing wall create passthrough in another wall.Details
demo existing kitchen, install new cabinets, lighting, skylight, switches, outlets, plumbing, range hood. remove non loadbearing wall create passthrough in another wall. | $20,000 |
| May 16, 2016 | Completed final sign-off Sep 2016 | 50 Jules Av | kitchen remodel. hang cabinets, plumbing, electrical and mechanical. demo non-load bearing wall, range hood.Details
kitchen remodel. hang cabinets, plumbing, electrical and mechanical. demo non-load bearing wall, range hood. | $20,000 |
| May 16, 2016 | Never finaled issued May 2016, no final | 1926 Folsom St | kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $18,000 |
| May 16, 2016 | Never finaled issued May 2016, no final | 32 Sanchez St | kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $18,000 |
| May 12, 2016 | Never finaled issued May 2016, no final | 124 Pfeiffer St | 2 bathrooms remodel, like for like, no walls to be added, removed and relocated.Details
2 bathrooms remodel, like for like, no walls to be added, removed and relocated. | $8,000 |
| Apr 13, 2015 | Completed final sign-off Jun 2016 | 1734 Bay St | install new kitchen cabinets, install recessed lighting, new sink and faucet.Details
install new kitchen cabinets, install recessed lighting, new sink and faucet. | $14,000 |