15 permits since 2000: 10 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1310 Alabama St | remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.ab112Details
remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.ab112 | $300,000 |
| Jun 29, 2026 | Completed final sign-off Aug 2026 | 4123 Ulloa St | bathroom remodel in-kind, replacing tile, toilet, vanity, light fixture. approx 40 sq ft. remodeling in kind.Details
bathroom remodel in-kind, replacing tile, toilet, vanity, light fixture. approx 40 sq ft. remodeling in kind. | $5,000 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 3180 San Bruno Av | to obtain final inspection for work approved under permit 201611042021. all work is complete.Details
to obtain final inspection for work approved under permit 201611042021. all work is complete. | |
| Nov 19, 2025 | In progress issued Nov 2025 | 40 Gaven St | to obtain final inspection for work approved under pa#201705055874. all work is completeDetails
to obtain final inspection for work approved under pa#201705055874. all work is complete | |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 519 Capp St | interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl spaceDetails
interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl space | $450,000 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 1099 Folsom St | to comply w/ nov# 202428524: repair damaged garage entrance including: garage door, plywood, siding. code/section# sfbc 102a. per nov "an emergency response inspection has revealed a car ran into building, minor structural damaged observed at garage (south)"Details
to comply w/ nov# 202428524: repair damaged garage entrance including: garage door, plywood, siding. code/section# sfbc 102a. per nov "an emergency response inspection has revealed a car ran into building, minor structural damaged observed at garage (south)" | $15,000 |
| Jul 18, 2024 | Completed final sign-off Dec 2024 | 52 Kirkwood Av | unit 226-converting 2 existing bathtubs into 2 (n) showers (include shower pan) including pipe re-configurration and tile work. accessible roll-in type.Details
unit 226-converting 2 existing bathtubs into 2 (n) showers (include shower pan) including pipe re-configurration and tile work. accessible roll-in type. | $10,000 |
| Dec 14, 2023 | Completed final sign-off Oct 2024 | 4596 Mission St | unit 1-accessible business entrance program per ordiance 51-16 abe#201912059342 add door bell and isa assistance sign at bldg entry install (n) landing extension, door threshold, door hardware, kickplate to comply remove (e) mail slot, door stop and door closerDetails
unit 1-accessible business entrance program per ordiance 51-16 abe#201912059342 add door bell and isa assistance sign at bldg entry install (n) landing extension, door threshold, door hardware, kickplate to comply remove (e) mail slot, door stop and door closer | $1,500 |
| Oct 19, 2021 | Never finaled issued Jan 2023, no final | 180 Granada Av | this project shall refer to permit app#201907297192 & 201907297193 to revise and add the following items: 1)add new deck at rear yard with fire-rated exterior walls at property lines. 2) add new sliding glass door & window at master bedroom. 3)add nw hand sink in laundry room.Details
this project shall refer to permit app#201907297192 & 201907297193 to revise and add the following items: 1)add new deck at rear yard with fire-rated exterior walls at property lines. 2) add new sliding glass door & window at master bedroom. 3)add nw hand sink in laundry room. | $10,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2023 | 180 Granada Av | addition of dwelling unit per ordinance 95-17.Details
addition of dwelling unit per ordinance 95-17. | $150,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2023 | 180 Granada Av | horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep.Details
horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep. | $200,000 |
| Apr 30, 2019 | Completed final sign-off Jun 2024 | 142 Holloway Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $80,000 |
| May 5, 2017 | Never finaled issued Jun 2022, no final | 40 Gaven St | add unit per ordinance no.162-16. convert 5 covered parking space into 5 new dwelling units. for a total of 13 units. n/a for maher ordinance no.155-13Details
add unit per ordinance no.162-16. convert 5 covered parking space into 5 new dwelling units. for a total of 13 units. n/a for maher ordinance no.155-13 | $60,000 |
| Nov 4, 2016 | Expired or cancelled expired Apr 2026 | 3180 San Bruno Av | convert (6) covered parking spaces into (3) new accessory dwelling units per ord# 162-16 for toal of 13 units. refer to pa# 201512235883 for soft story retrofit. ** maher: n/a **Details
convert (6) covered parking spaces into (3) new accessory dwelling units per ord# 162-16 for toal of 13 units. refer to pa# 201512235883 for soft story retrofit. ** maher: n/a ** | $75,000 |
| Nov 4, 2016 | Completed final sign-off Apr 2021 | 3190 San Bruno Av | convert (6) covered parking spaces into (2) new accessory dwelling units per ord# 162-16. renovate unit #11, convert into (2) bed, (1)bath layout. reference pa# 201511303764 for soft story retrofit. ** maher: n/a **Details
convert (6) covered parking spaces into (2) new accessory dwelling units per ord# 162-16. renovate unit #11, convert into (2) bed, (1)bath layout. reference pa# 201511303764 for soft story retrofit. ** maher: n/a ** | $75,000 |