Vnh Builders
- Based in
- Burlingame
- On San Francisco permits
- Nov 2020 to Jul 2025
- Last 24 months
- 1 permit filed
16 permits since 2000: 5 completed, 11 never finaled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Jul 2025 | 439 Princeton St | revision to drawing sheets added rcp showing skylights in reference to pa#202503263108, pa #20210304586, and 202106162604.Details
revision to drawing sheets added rcp showing skylights in reference to pa#202503263108, pa #20210304586, and 202106162604. | |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 36 Crane St | to obtain final inspection for work approved under pa# 201806111468. all work is complete.Details
to obtain final inspection for work approved under pa# 201806111468. all work is complete. | |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 36 Crane St | recommencement and completion of work approved under 201811095519.Details
recommencement and completion of work approved under 201811095519. | $280 |
| Apr 14, 2022 | Completed final sign-off Oct 2022 | 2774 21st St | (work in unit 2774 only) kitchen remodeling: replace cabinets, countertop, facuet, and point light. 2 bathroom remodels: new tiles, fan, light fixture, shower pan. replace fan and patch and paint.Details
(work in unit 2774 only) kitchen remodeling: replace cabinets, countertop, facuet, and point light. 2 bathroom remodels: new tiles, fan, light fixture, shower pan. replace fan and patch and paint. | $65,000 |
| Dec 22, 2021 | Completed final sign-off Oct 2022 | 477 Vermont St | englarge lower level door opening, new interior stair and lower level cosmetic updates. new seismic shear wall and footing are provided at lower level wall.Details
englarge lower level door opening, new interior stair and lower level cosmetic updates. new seismic shear wall and footing are provided at lower level wall. | $35,000 |
| Oct 25, 2021 | Completed final sign-off Jan 2022 | 1 Daniel Burnham Ct | bathroom remodeling. 64 sqft. replace bathtub, replace toilet in kind, install new tiles in the shower and floor.Details
bathroom remodeling. 64 sqft. replace bathtub, replace toilet in kind, install new tiles in the shower and floor. | $8,000 |
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 1 Daniel Burnham Ct | demo (e) kitchen cabinets, install new kitchen cabinets, install new kitchen floorDetails
demo (e) kitchen cabinets, install new kitchen cabinets, install new kitchen floor | $2,500 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 826 Central Av | common area-height clearance; concrete work and drain.Details
common area-height clearance; concrete work and drain. | $4,200 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 822 Central Av | hallway/breezeway height clearance; concrete and drain.Details
hallway/breezeway height clearance; concrete and drain. | $4,200 |
| Jun 16, 2021 | Never finaled issued Aug 2021, no final | 439 Princeton St | frame non structural new walls, new shower area in the bath of the 1st floor, new laundry area and open kithcen wall non loan bearing walls.Details
frame non structural new walls, new shower area in the bath of the 1st floor, new laundry area and open kithcen wall non loan bearing walls. | $65,000 |
| Jun 15, 2021 | Never finaled issued Jul 2021, no final | 826 Central Av | common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landingDetails
common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landing | $2,500 |
| Jun 15, 2021 | Never finaled issued Jul 2021, no final | 822 Central Av | improvements to existing stairs from street to basement including: install handrails @ both side of the stairs; remove door at bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 at each side of the landingDetails
improvements to existing stairs from street to basement including: install handrails @ both side of the stairs; remove door at bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 at each side of the landing | $2,500 |
| Apr 21, 2021 | Never finaled issued Apr 2021, no final | 1 Daniel Burnham Ct | replace kitchen cabinets, replace bathroom tile floor, add shower door, add back light livng room and bedroom. no structural workDetails
replace kitchen cabinets, replace bathroom tile floor, add shower door, add back light livng room and bedroom. no structural work | $10,000 |
| Mar 5, 2021 | Completed final sign-off May 2021 | 424 Ellis St | unit 505 - demolition of kitchen cabinets/replacement of cabinets and floor in kithcen. no new wall & no (e) wall relocation. new lighting shall comply with ccec 150.0 (k) 3Details
unit 505 - demolition of kitchen cabinets/replacement of cabinets and floor in kithcen. no new wall & no (e) wall relocation. new lighting shall comply with ccec 150.0 (k) 3 | $16,300 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 439 Princeton St | to comply w/ nov 202173101. demolition because of fire damage/remove of cabinets/electrical/plumbing on 1st and 2nd floor. install sister studs where the framing was compromise/new stucco arein the front area of the building/update electrical and plumbing work that was damaged by the fire.Details
to comply w/ nov 202173101. demolition because of fire damage/remove of cabinets/electrical/plumbing on 1st and 2nd floor. install sister studs where the framing was compromise/new stucco arein the front area of the building/update electrical and plumbing work that was damaged by the fire. | $65,000 |
| Nov 5, 2020 | Never finaled issued Nov 2020, no final | 685 Mission St | remove interopr glasses and patch/paint wall. (250 sqft)Details
remove interopr glasses and patch/paint wall. (250 sqft) | $8,500 |