Vision Painting And Construction
- Based in
- Woodacre
- On San Francisco permits
- Apr 2013 to May 2018
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2018 | Completed final sign-off Jan 2020 | 2415 Buchanan St | upgrade all electrical upgrade all plumbing, new kitchen. renovate (e) bathroom. add new powder roomDetails
upgrade all electrical upgrade all plumbing, new kitchen. renovate (e) bathroom. add new powder room | $225,000 |
| Sep 21, 2017 | Never finaled issued Sep 2017, no final | 2364 Pacific Av | 4 units kitchen cabinets . bathroom - replace fixtures, tubs - shower and new tiles.Details
4 units kitchen cabinets . bathroom - replace fixtures, tubs - shower and new tiles. | $160,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 2364 Pacific Av | remodel of units 2, 3, 6 and 7 - install kitchen cabinets; bathroom - replace all fixtures, tub to be replaced by shower, new tileDetails
remodel of units 2, 3, 6 and 7 - install kitchen cabinets; bathroom - replace all fixtures, tub to be replaced by shower, new tile | $160,000 |
| Sep 28, 2015 | Completed final sign-off Feb 2017 | 2415 Buchanan St | units #2,4, & 6: upgrade electrical, upgrade plumbing, and renovate kitchen. renovate extg baths, add new water closet, add washer dryer units.Details
units #2,4, & 6: upgrade electrical, upgrade plumbing, and renovate kitchen. renovate extg baths, add new water closet, add washer dryer units. | $120,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2017 | 2415 Buchanan St | unit #3 remodel - upgrade all electrical & plumbing, renovate kitchen & (e) bath, add new water closet & washer/dryer untis to ermodelled kitchen, add new heater enclosure, add steam to main bathroom.Details
unit #3 remodel - upgrade all electrical & plumbing, renovate kitchen & (e) bath, add new water closet & washer/dryer untis to ermodelled kitchen, add new heater enclosure, add steam to main bathroom. | $65,000 |
| Aug 12, 2015 | Completed final sign-off Jun 2018 | 2364 Pacific Av | soft story retrofit per sfbc chapter 34b (other rational design. n/a for maher ordinance.Details
soft story retrofit per sfbc chapter 34b (other rational design. n/a for maher ordinance. | $25,000 |
| Jul 13, 2015 | Completed final sign-off Jan 2017 | 2415 Buchanan St | install new siding, garage doors, front door, side access door on gr fl. soft story sep permit, repair/replace stuccoDetails
install new siding, garage doors, front door, side access door on gr fl. soft story sep permit, repair/replace stucco | $40,000 |
| Jan 14, 2015 | Completed final sign-off Feb 2017 | 2415 Buchanan St | soft story retrofit per sfbc chapter 34b, engineering criteria: 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, engineering criteria: 2012 iebc appendix a-4 | $96,000 |
| Sep 10, 2014 | Completed final sign-off Sep 2015 | 2415 Buchanan St | unit #1 - remove/add interior walls, remodel kitchen & bath, new water closet, add washer/dryer, upgrade to all electrical.Details
unit #1 - remove/add interior walls, remodel kitchen & bath, new water closet, add washer/dryer, upgrade to all electrical. | $40,000 |
| Oct 1, 2013 | Completed final sign-off Aug 2014 | 2364 Pacific Av | replace deteriorated wood in bay windows. replace stucco on front with hardy siding. replace all 12 front bay windows with aluminum windows of same size. compliance with ordiance no. 155-13 not required.Details
replace deteriorated wood in bay windows. replace stucco on front with hardy siding. replace all 12 front bay windows with aluminum windows of same size. compliance with ordiance no. 155-13 not required. | $30,000 |
| Apr 19, 2013 | Completed final sign-off Aug 2014 | 2364 Pacific Av | install harditrim screen on front exterior , tile front entry, replace front garage & entry doors.Details
install harditrim screen on front exterior , tile front entry, replace front garage & entry doors. | $40,000 |