Vinicon Construction
- Based in
- Bay Point
- On San Francisco permits
- Jun 2017 to Jul 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 655 Anderson St | take out old siding which falling down on front hse only. install insulation all area on front of hse area. install plywood, siding and paint to match (e). replace front exterior siding in kindDetails
take out old siding which falling down on front hse only. install insulation all area on front of hse area. install plywood, siding and paint to match (e). replace front exterior siding in kind | $10,500 |
| Jun 14, 2017 | Completed final sign-off May 2018 | 117 Trenton St | to comply violation #201781121 & 201124102 item #2- repair 3 story boards which are dry rot and some hanging loose which is harzadous to neighbor. less than 50% of stairs.Details
to comply violation #201781121 & 201124102 item #2- repair 3 story boards which are dry rot and some hanging loose which is harzadous to neighbor. less than 50% of stairs. | $4,000 |