Vincent Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Nov 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2023 | Completed final sign-off Dec 2023 | 424 Union St | replace dryrot woods less than 50% at second exit stair at the back of the building. not visible from street.-rearDetails
replace dryrot woods less than 50% at second exit stair at the back of the building. not visible from street.-rear | $1,450 |
| Nov 21, 2017 | Completed final sign-off May 2018 | 2733 Noriega St | construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flrDetails
construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flr | $78,000 |
| Aug 22, 2016 | Completed final sign-off Feb 2017 | 3530 Lawton St | in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6')Details
in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6') | $60,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 3850 Judah St | replace stucco (4'x10') on the side of the house, in-kind. visible to the street.Details
replace stucco (4'x10') on the side of the house, in-kind. visible to the street. | $2,500 |
| Jul 16, 2013 | Completed final sign-off Nov 2013 | 150 Merced Av | new deck and stair to replace extg damaged extg deck. no change to extg building.Details
new deck and stair to replace extg damaged extg deck. no change to extg building. | $9,000 |
| Nov 15, 2011 | Completed final sign-off Apr 2012 | 107 27th Av | cover with drywall below top front entrance stairs. min 5/8" type "x" sheetrock.Details
cover with drywall below top front entrance stairs. min 5/8" type "x" sheetrock. | $150 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 1975 29th Av | remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets.Details
remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets. | $15,000 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 2490 44th Av | remodel bathroom, 1 bath tub, vanity, 1 toilet, install carbon monoxide alarmDetails
remodel bathroom, 1 bath tub, vanity, 1 toilet, install carbon monoxide alarm | $5,500 |
| Jul 11, 2011 | Completed final sign-off Sep 2011 | 1850 Rivera St | replace stucco/finish on (e) front wall, dry rotted, replace in kind, flat surfaceDetails
replace stucco/finish on (e) front wall, dry rotted, replace in kind, flat surface | $6,800 |
| Apr 28, 2011 | Completed final sign-off May 2011 | 150 Merced Av | revision to 201010253650 and 201009231520. replace proposed beam support with bearing wall support at garage. remove special inspection for wood framing.Details
revision to 201010253650 and 201009231520. replace proposed beam support with bearing wall support at garage. remove special inspection for wood framing. | |
| Mar 28, 2011 | Completed final sign-off May 2011 | 2190 48th Av | replace stucco, finish on existing front wall, dry rotted 400 sq.ft.Details
replace stucco, finish on existing front wall, dry rotted 400 sq.ft. | $6,500 |
| Oct 25, 2010 | Completed final sign-off May 2011 | 150 Merced Av | revision to permit app#201009231520. revise window location at remodeled kitchen and remove wing wall at kitchen. remove construction of 2 new footings indicated on above referenced permit application. keep extg footings.Details
revision to permit app#201009231520. revise window location at remodeled kitchen and remove wing wall at kitchen. remove construction of 2 new footings indicated on above referenced permit application. keep extg footings. | |
| Sep 23, 2010 | Completed final sign-off May 2011 | 150 Merced Av | int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood.Details
int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood. | $40,000 |
| Apr 28, 2009 | Never finaled issued May 2009, no final | 2547 30th Av | infill under existing sunroom @ ground floor, add new bedroom & bath at ground floor.Details
infill under existing sunroom @ ground floor, add new bedroom & bath at ground floor. | $30,000 |
| Jun 30, 2008 | Completed final sign-off Aug 2008 | 2458 47th Av | replace front dry rotted & replace sutcco at front of the house. approx 120 sq. ft. no other alterations. replacement in kind.Details
replace front dry rotted & replace sutcco at front of the house. approx 120 sq. ft. no other alterations. replacement in kind. | $4,500 |
| Dec 18, 2007 | Completed final sign-off Feb 2008 | 28 Riverton Dr | construct one bed room, one family room and a fullbath room, replace (e) window with new one 5'x5' vinyl frame sliding window & new 5'x6'8" silind door; relocate washer & dryer.Details
construct one bed room, one family room and a fullbath room, replace (e) window with new one 5'x5' vinyl frame sliding window & new 5'x6'8" silind door; relocate washer & dryer. | $25,000 |
| Nov 8, 2007 | Completed final sign-off Dec 2007 | 2570 43rd Av | this application is for reaplacing front dry rotted and the stucco at front of the house. approved 100 sqft . replace in kind.Details
this application is for reaplacing front dry rotted and the stucco at front of the house. approved 100 sqft . replace in kind. | $4,500 |
| Sep 14, 2007 | Completed final sign-off May 2008 | 1678 47th Av | proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade.Details
proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade. | $50,000 |
| Jun 14, 2007 | Completed final sign-off Apr 2009 | 2332 Moraga St | rear addition of 2 floors per plans to extend 15' into rear yard at 2 levels.Details
rear addition of 2 floors per plans to extend 15' into rear yard at 2 levels. | $100,000 |
| Nov 6, 2006 | Completed final sign-off May 2007 | 1583 18th Av | remodel at the (e) g/f level, including construct a bedroom and a family room at the rear area, construct a storagee at (e0 g/f, build a full bathroom at (e) g/f as plan shown. replace the (n) furnace, (n) water & relocate washer and dryer as plan shown. replace 2 vinyl frame windows and install 3Details
remodel at the (e) g/f level, including construct a bedroom and a family room at the rear area, construct a storagee at (e0 g/f, build a full bathroom at (e) g/f as plan shown. replace the (n) furnace, (n) water & relocate washer and dryer as plan shown. replace 2 vinyl frame windows and install 3 | $24,000 |
| May 8, 2006 | Completed final sign-off Jun 2006 | 1621 45th Av | repair stucco in front of house, dryrot repair to front wall.Details
repair stucco in front of house, dryrot repair to front wall. | $5,000 |
| Jan 21, 2005 | Completed final sign-off Mar 2005 | 2586 29th Av | replace extg front entry stair in extg location with concreteDetails
replace extg front entry stair in extg location with concrete | $5,000 |
| Dec 28, 2004 | Completed final sign-off Jan 2005 | 2163 44th Av | replace (e) doors with new door at rear.Details
replace (e) doors with new door at rear. | $150 |
| Mar 27, 2001 | Completed final sign-off Jun 2001 | 2030 Sloat Bl | add family room, bedroom & storage & full bath at g/floorDetails
add family room, bedroom & storage & full bath at g/floor | $15,000 |