Villatoro & Munoz Construction Inc.
- Based in
- San Leandro
- On San Francisco permits
- Jun 2015 to Sep 2026
- Last 24 months
- 4 permits filed
11 permits since 2000: 5 completed, 3 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 116 Connecticut St | unit 3- balcony re coat and guardrail upgrade (weld in pickets to meet code compliance)Details
unit 3- balcony re coat and guardrail upgrade (weld in pickets to meet code compliance) | $13,275 |
| Sep 24, 2026 | In progress issued Sep 2026 | 116 Connecticut St | unit 2- balcony re coat and guardrail upgrade (weld in pickets to meet code compliance) facing street.Details
unit 2- balcony re coat and guardrail upgrade (weld in pickets to meet code compliance) facing street. | $13,275 |
| Sep 24, 2026 | In progress issued Sep 2026 | 116 Connecticut St | unit 1- balcony re coat and guardrail upgrade (weld in new pickets to meet code compliance) facing street. 9/24/2026Details
unit 1- balcony re coat and guardrail upgrade (weld in new pickets to meet code compliance) facing street. 9/24/2026 | $13,275 |
| Apr 27, 2026 | Completed final sign-off Jun 2026 | 1697 Sutter St | repair balcony in-kind. replace balcony dry-rot in-kind. apply balcony coating membrane to balcony surface.Details
repair balcony in-kind. replace balcony dry-rot in-kind. apply balcony coating membrane to balcony surface. | $9,850 |
| Jul 3, 2023 | Completed final sign-off Feb 2024 | 2354 Greenwich St | to comply w/ nov 202309214, revision to 202210174518. remodel 2 kitchens & 2 bathrooms. all work is like for like for lower unit (2354) & upper unit (2356). comply w/ complaint 202309219, 202309229, 202309214Details
to comply w/ nov 202309214, revision to 202210174518. remodel 2 kitchens & 2 bathrooms. all work is like for like for lower unit (2354) & upper unit (2356). comply w/ complaint 202309219, 202309229, 202309214 | $38,650 |
| Oct 17, 2022 | Never finaled issued Oct 2022, no final | 2354 Greenwich St | full kitchen remodeling in kind, no structural work involved. no structural work- no framing modification.Details
full kitchen remodeling in kind, no structural work involved. no structural work- no framing modification. | $10,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 316 Surrey St | reroofingDetails
reroofing | $4,800 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 721 Plymouth Av | reroofingDetails
reroofing | $4,200 |
| Dec 22, 2015 | Completed final sign-off Feb 2016 | 617 Capp St | reroofingDetails
reroofing | $6,000 |
| Oct 29, 2015 | Completed final sign-off Feb 2016 | 617 Capp St | repair front stucco siding (inkind) and balconies, and reroof with shingles to match existing; no change to front decorative elements, including but not limited to iron railings, brackets, or wood decorative element at top of shingle roof. reroof of flat roofDetails
repair front stucco siding (inkind) and balconies, and reroof with shingles to match existing; no change to front decorative elements, including but not limited to iron railings, brackets, or wood decorative element at top of shingle roof. reroof of flat roof | $9,800 |
| Jun 8, 2015 | Completed final sign-off Jun 2015 | 243 Missouri St | reroofingDetails
reroofing | $5,000 |