Victory Services
- Based in
- Antioch
- On San Francisco permits
- Nov 2024 to Nov 2024
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2024 | Completed final sign-off Apr 2025 | 2798 Mission St | patch and tape walls with drywall where missing patch tile floor with matching tile where missing re-install sink paint where needed walls only (ceiling in office only) add insulation in walls where neededDetails
patch and tape walls with drywall where missing patch tile floor with matching tile where missing re-install sink paint where needed walls only (ceiling in office only) add insulation in walls where needed | $78,000 |