Venegas And Razo Enterprises
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Oct 2007
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2007 | Never finaled issued Nov 2007, no final | 167 Lexington St | two units remodeling, comply with violations #200727044, 200006343, 200006286-fire damage repair workDetails
two units remodeling, comply with violations #200727044, 200006343, 200006286-fire damage repair work | $190,000 |
| Aug 31, 2006 | Completed final sign-off Jan 2007 | 1960 California St | replace 22 existing windows and existing french door. all facing street. (same size same location ) in 6 apartments with retrofit milguard clasic.Details
replace 22 existing windows and existing french door. all facing street. (same size same location ) in 6 apartments with retrofit milguard clasic. | $8,000 |
| May 23, 2003 | Completed final sign-off May 2003 | 230 Acadia St | remodel bathroom in 2nd flrDetails
remodel bathroom in 2nd flr | $5,000 |