V S G Concrete
- Based in
- Moss Beach
- On San Francisco permits
- Dec 2025 to Dec 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2025 | In progress issued Aug 2026 | 339 Collingwood St | remodel (e) upper rear yard, repalce and install concrete retaining walls to support (n) raised planters. build 2 levels of wood deck with stainless steel guardrails. install (n) hot tub with electrical connection and protable propane fire feature. install (n) plants and irrigation. replace 2 (e)Details
remodel (e) upper rear yard, repalce and install concrete retaining walls to support (n) raised planters. build 2 levels of wood deck with stainless steel guardrails. install (n) hot tub with electrical connection and protable propane fire feature. install (n) plants and irrigation. replace 2 (e) | $200,000 |